Post Job Free
Sign in

Project Training

Location:
Gresham, OR, 97030
Posted:
September 23, 2010

Contact this candidate

Resume:

MARK STEWART

**** ** ********** ** *******, OR **030 702-***-**** *********@*****.***

POSITION SOUGHT

Carpenter/Carpenter Foreman

EDUCATION AND TRAINING

Graduate Redmond High School – Class of 1988

Apprenticeship, 1992 – 1996 – Carpenters Local 1977

-

WORK EXPERIENCE (Last 10 years)

2005 Current

HOVER DAM BYPASS BRIDGE, NV

- Carpenter Foreman in charge and responsible of crews up to 13. Work included scheduling and oversight of the

foundations, substructure, arch, precast columns, deck and barriers along with all of the temporary works on the

project. The final product is the longest segmental arch found in North America and is scheduled to be completed in

November 2010. During this project I represented Obayashi on a daily basis.

-

93/95 – 215 INTERCHANGE (WASHINGTON GROUP) 2003 2005

- Carpenter Foreman in charge of the construction of cast in place concert bridges and steel girder bridges. During

this project I represented Washington Group.

GRANITE CONSTRUCTION CO. 2001 2003

- Carpenter Foreman in charge of the Las Vegas Monorail construction of the Monorail Stations and switch decks.

MORRISON KNUDSEN 2000 2001

- Sahara Flyover Project.

PROVEN WORK SKILLS

- Scheduling Manpower with employer

- Scheduling materials for delivery

- Project planning, POC for GC/General Superintendent

- Personnel Issues:

- - Payroll, Timesheets, Payroll distribution

- - Safety, Run weekly meetings and keep record for file

- - Hire/Fire, Determine Manpower Needs, Evaluate Performance and Terminations

- Customer Relations and Change Order Documentation

- Lump Sum. Manage Work to meet Production Goals

- Cost Control, Tracking of LB/MH on a daily basis and Monthly Consumable Costs.

-

- Small Tool and Equipment Management, Responsible for Inventory and Condition of Rigging and Company

- Tools and Trucks

- Technical Understanding of the work

- Integrated Shop Drawings

- Industry Standards

- - ACI. Placement Tolerances

- - FHWA/AASHTO Construction Specifications

- - ASBI. Segmental Bridge Construction Practices

- - PTI. Installation Methods

- Safety Training

- OSHA 30 Hour Training.

-

- - Subpart R Training

- - Forklift Operator /Competent Person Training

- - Personal Man Lift Certification

- - CPR Certified

- - High Line Rescue Training

- - Scaffold Certified

REFERENCES: Available upon request

-

-



Contact this candidate