Post Job Free
Sign in

Project Manager Engineer

Location:
7005
Posted:
August 23, 2010

Contact this candidate

Resume:

M. HANIF KHAN

*** ****** ******, *******, ** ****5

973-***-**** ***********@*****.***

Status: Married - US citizen

SUMMARY OF EXPERIENCE

Diversified experience, with progressive responsibilities in construction

management of large-scale industrial projects. Extensive hands-on

experience in turnkey project management, petroleum storage facilities, and

steel structure erection. Construction management experience includes

project planning and scheduling, estimation, cost control, and material

management. a general knowledge of Plumbing, HVAC, and Electrical cost

estimating

Midlantic Erectors, inc. (Structural steel Erection), Roselle, N J (

January 2007 To July 2010)

T2, Inc (structural steel), Newark, N J ( May 1998 to December 2006)

ESTIMATOR (Fabrication and erection) Prepare & submit and track bid

proposal and take off; minor detailing / drafting; submit and track change

orders, enhanced reporting and record, improved material management.

Develop and implement systems for cost control for monitoring of

construction activities. Coordinate and supervise sub-contractor's

activities. Managed all structural steel activities at job sites. Typical

mix of commercial mid and high-rise work, industrial and residential

projects, and public work. Self-performs and subcontractor.

PARCO Refinery Limited, Karachi (July 1992 to March1998)

SENIOR PROJECT ENGINEER, construction activities; developed Project

Control Procedures, enhanced reporting, improved material and resource

management systems. Inspection project materials at vendor manufacturing

facilities, Pipeline Project ( $ 400 Million) (EPC) of the for 250 miles,

two Pumping Stations, House facilities, Grid Station, Terminal Stations

Shaheen Airport Services, Karachi (July 1990 to July

1992)

MANAGER - Ground Services Engineering Department for Ramp Operations

-Aircraft Handling Operations at ramp and ground.

-Maintenance of Specialized vehicles

and Aircraft Starter. Scheduling and coordination of all Ramp activities.

PAF Mechanical Engineering Division (February 1980 to February 1990)

Served 10 years as Major in ENGINEERING DIVISION : Scheduling and

coordination Operation and Maintenance of Workshop - Rebuild factory

aircraft. PAC - Kamra

Construction and Operations Supervisor and Commissioning / Start-up

activities for the Boiler House, Plant & laboratory. -Compressor Houses

Industrial Refrigeration Plants network factory.

National Construction Company, Karachi (February 1974 to

November 1979)

Peace Hawk-V Project, Khamis, Saudi Arabia (value $800 million)

supervised by US Army Corp. of Engineers and built by Northrop Corporation,

USA, Assigned to Erection of Structural Steel Buildings (Fire Building,

Avionics Buildings, Towers, AGE Aircraft Hanger( 200 feet wide 75 feet

high, gates, Air-conditioning Plants & Crane Installation.

Karachi ( February 1974 to November 1976 ) as Site Engineer at Refinery

Extension

Project $ 450 million. Project comprised of the installation and testing of

a cross-country pipeline, cost control and planning and scheduling

functions and field engineering support for Fabrication, Erection and

Testing of Petroleum Products Tanks Conduct the Welding Operations

EDUCATION

Bachelor of Science in Mechanical Engineering, University of Engineering

and Technologies, Peshawar.

COMPUTER SKILLS: Spreadsheets (Lotus 123 and MS Excel); MS word, MS power

point, Timberline estimates, Construction estimates, Knowledge of Primavera

Project Planner(P3), Visio Tech, MS Project and Howard Project Manager, and

others.



Contact this candidate