SAURABH SEHGAL
Email : ********@*****.***
Education:
UNIVERSITY OF MICHIGAN Ann
Arbor, Michigan, USA
M.S.E. in Industrial and Operations Engineering (G.P.A: 3.7/4.0)
April 2008
Relevant Course Work: Manufacturing Strategies (Lean Manufacturing), Design
for Six Sigma, Statistical Quality Control, Inventory Analysis & Control,
Introduction to Markov Chains, Supply Chain Management
MAHARISHI DAYANAND UNIVERSITY
Haryana, India
B.E. in Mechanical Engineering
May 2005
Relevant Course Work: Mechanical Vibrations, Internal Combustion Engines,
Power Plant Engineering, Automobile Engineering
Experience:
ROHAN INFOTECH PVT. LTD.
Gurgaon, NCR, India
Production Manager
July 2010 - Present
. Leaded team to gain Telecom Specification Evaluation Certificate (TSEC)
. Managed rack manufacturing unit, manufacturing more than 1500 racks per
month
. Audited existing processes, identified critical gaps and designed new
corrective procedures
. Implemented Quality Improvement program including spot audits, root
cause analysis, and implementation of remedial actions and actively
involved in improving productivity and removing various sources of
variations.
. Handled customer complaints and collaborated with production engineers
to identify and solve issues, resulting in reduction of customer
complaints by approximately 10%
. Oversaw Raw Materials Inventory, coordinated with vendors to work on
quality and delivery issues and effectively reduced inventory levels by
approx. 50%
. Designed short/long term production scheduling and forecasting and
monthly analysis to ensure timely deliveries of racks
. Goal is to help the organizations as possible to remove waste and
inefficiency in production, leading to increased profitability and a
win-win situation for all stake holders.
WD PARTNERS INDIA PVT. LTD.
Mumbai, India
Operations Engineering Consultant
April 2009 - June 2010
. Created databases, to monitor validation and calibration of Labor
Management System for retail and restaurant chains
. Performed Operation Analysis in order to analyze the speed of service
and labor deployment
. Created Work Standards for various processes using Predetermined Motion
Time Systems (M.O.S.T)
. Monitored equipment downtime and implementing corrective action
procedures
PRAKASH INDUSTRIES LTD.
Chhattisgarh, India
Summer Intern
May 2007 -
Aug 2007
. Worked in a team for product quality assurance in production
environment
. Analyzed product quality before dispatching to customers
. Maintained liaison with the vendors of product and took successful
actions in solving concerned issues
AIMIL INSTRUMENTATION LTD.
New Delhi, India
Test Engineer
Sept 2005 -
Feb 2006
. Up-graded Printed Circuit Board (P.C.B) Layout used in wireless network
. As a team leader, assisted in customer proposed design changes as well
as completed the projects in a timely manner
. Ensured proper static analysis for overhaul material review tags to
verify structural acceptability for in-use
Academic Projects:
Identify Define Design Optimize Validate (IDDOV) Case Study (Ann Arbor-
2008):
. Prepared an IDDOV project report for dispenser manufacturing firm to
help better understand their customer requirements and developed a
better design solution
. Used various Design for Six Sigma tools like House of Quality, Design
Scorecard to translate Voice of Customer (VOC) requirements into
corresponding functional requirements.
. Analyzed process parameter settings for control factors using Dynamic
Taguchi DOE.
. Performed Reliability analysis, Tolerance simulation analysis to
evaluate results in order to study effects of different control factors
settings to meet design process capability objectives.
Value stream mapping for Tuttle Spring (Ann Arbor-2007):
. Assessed plant for a spring manufacturing firm, plotting a current
state value stream map.
. Determined dock to dock time, cycle time, evaluated the resources
utilized and highlighted waste.
. Prepared Future State Map and applied various Lean Manufacturing
concepts like Kaizen, Kanban, 5S, work standardization to improve
efficiency and productivity
Supply Chain Management Projects (Ann Arbor-2008):
. Suggested various strategic sourcing options for a cancer drug
manufacturing firm, to optimize the flow of material (molecules) from
suppliers to production facility
. Evaluated various opportunities for the firm to increase profit and
reduce the risk of drug manufacturing during each phase of FDA drug
manufacturing process
. Used sophisticated optimization techniques and created detailed design
documents that outline critical business functions redesign
distribution network for an electronic equipment manufacturing firm in
order to reduce the total operating costs thereby increasing profit
margins.
Demand Forecasting and Production Planning (Ann Arbor-2007):
. Forecasted annual demand of the product from given demand data for 3
years using Winter's method for a nut manufacturer
. Designed an alternate production plan in order to minimize the
inventory levels.
Technical Skills:
. Engineering Design: AutoCAD
. Programming languages: Visual Basic, MATLab, C, C++,
. Application software: Microsoft Access, Microsoft Office, Visio,
MINITAB, QE Tools, gauge R&R, Pareto