Daren Helminski
th
**** *. ** ****** *********, WI 532**-***-*** 5858 abk5zn@r.postjobfree.com
QUALIFICATIONS SUMMARY
• Over 16 years of construction experience working for:
- Engineering firms
- Design/Build firms
- Various contractors
• Areas of expertise include:
- Computer technology - Warehousing
Microstation - Shipping and Receiving
Autocad - Shop Drawings
Photoshop - Record Drawings
Powerpoint - Graphics
Word - Process Engineering
Excel - Lean Manufacturing
- Carpentry - Project Management
Framing Residential Homes - Schematic Design
- Manufacturing (Quad Graphics) - Design Development
Offset Printing Press - Construction Documents
Imaging (Color Proofing) - Estimating
- Heavy Equipment Operator - Bidding and Negotiating
CDL – Class A - Consulting
Forklift Certified
• Experienced/self-confident individual with the ability to shift gears
• Excels in multi-tasks when needed
• Well-rounded background in the building/consulting industry
BUSINESS EXPERIENCE (General)
MIDWEST STAIRS AND IRON
FEBRUARY 2009 – SEPTEMBER 2009 (8 months)
Various projects involvement included: analyze and review drawings to send out
quotes for various raw materials. Compile quotes and labor for a competitive
pricing in form of scope letters.
GRAEF, ANHALT, SCHLOEMER AND ASSOCIATES, INC.
OCTOBER 1997 – NOVEMBER 2008 (11 years)
Various projects involvement included: Project management, advanced CAD operations,
marketing, field work, architectural design, structural design, process engineering
and aerial photography.
T-3 GROUP
SEPTEMBER 1996 – OCTOBER 1997 (1 year)
Various projects involvement included: Office design and layouts for design/build
firm. Create CAD drawings (Design Development and Construction Document).
Coordinate scheduling and alternatives with “in-house” construction crews.
Daren Helminski
3375 S. 76th Street Milwaukee, WI 53219 414-***-**** abk5zn@r.postjobfree.com
CONTRACTORS / CARPENTRY
JUNE 1992 – SEPTEMBER 1996 (4 years)
Various projects involvement included: Constructing new residential homes,
remodeling and additions. Create preliminary drawings for additions and new
dwellings. Assist clients with design concepts.
QUAD GRAPHICS, INC.
DECEMBER 1988 – MARCH 1991 (2.5 years)
Various involvement included:
Printing Press M-23: Advanced Jogger – Pewaukee, WI (December 1988 – September 1989)
Enterprise Division: Color Proofing Department – Sussex, WI (September 1989 – March
1991)
WAREHOUSE EXPERIENCE
MARCH 1987 – MARCH 1992 (Various dates – Full-time / Part-time / Temporary position)
- AT&T – West Allis, WI (Forklift Certified) – Temp. (1992)
- TJ Maxx – Brookfield, WI – Full-time (1988 and 1991)
- Niagara Envelope – Tampa, FL – Temp. / Part-time (1987 - during High School)
EDUCATION
Bachelor of Science Degree in Architecture
University of Wisconsin-Milwaukee (1996)
Urban Planning Certificate - University of Wisconsin-Milwaukee (1996)
Home Inspection Certificate - Milwaukee Area Technical College (2003)
Real Estate Appraisal Certificate - Robbins and Lloyd Career Training Institute
(2004)
Essentials of REVIT (3D) – Waukesha Community Technical College (2010)
BUSINESS EXPERIENCE (Projects / Detail)
MIDWEST STAIRS AND IRON
FEBRUARY 2009 – SEPTEMBER 2009
Estimating Department
Various projects involvement included: cost analysis / getting quotes for raw
materials, which included steel, aluminum, glass, powder-coating, painting,
miscellaneous metals and hardware. Design development, code research, construction
documents, specifications, construction administration were also factors in putting
together competitive bids. Bid factors included fabrication / shop labor (non-
union), union iron workers, freight orders, office labor, delivery charges, various
taxes, and mark-up for profit. Other functions included project management, field
Daren Helminski
3375 S. 76th Street Milwaukee, WI 53219 414-***-**** abk5zn@r.postjobfree.com
verification (Architectural / Structural), file organization, printing and
downloading files and plans. As a result, my involvement helped the company to
compete with the “bull market” and reduce cost by helping organize a process that
flows to maximize efficiency with their production to meet their operations and
still make a profit.
GRAEF, ANHALT, SCHLOEMER AND ASSOCIATES, INC.
OCTOBER 1997 – NOVEMBER 2008
Architectural Department
Bucyrus International - Expansion and Remodeling South Milwaukee Plants -
Project involvement included: programming, process engineering, field verification
(Architectural / Structural), design, initial set-up for CAD files, code research,
construction documents, specifications, construction administration, aerial
photography, Photoshop renderings, record drawings. As a result, my involvement
helped Bucyrus reduce cost by helping organize a process that flows to maximize
efficiency with their production to meet their operations and shipping demands.
City of Milwaukee – Department of Public Works – Building and Fleet Division –
Parking Enforcement and Tire Shop Relocation / Alteration, Milwaukee, WI –
Office and tire shop design and layout. Project involvement included: programming,
ADA compliance, fire protection, room additions and alterations, convert facility
into a public facility, space planning, parking layout, security issues. Also
assisted in selecting finishes such as furniture, office partitions, carpeting,
tile and color boards for painting options. As a result, my involvement helped DPW
reduce cost by helping organize a process that flows to maximize efficiency with
their operation.
General Mitchell International Airport – Bomb Detection Unit, Milwaukee, WI -
Secondary Project Manager of installation of bomb detection unit. Project
involvement included construction documents, coordination which GMAC staff, bomb
detection distributor, structural engineer and electrical engineer.
Quad Graphics, Inc. - West Allis, WI (Imaging Dept)– Oklahoma City, OK (New Plant)
Various Project(s) involvement included Architectural design development,
construction documents, Process Design, CAD files and uploading FTP sites,
coordination with Quad Graphics staff, AS/RS systems manufacturer, structural,
mechanical and electrical engineers.
Telecommunications Department
Sprint PCS - Nextel Communications, Inc. - SBA Communications, Inc.
Various telecommunication projects in Wisconsin, Illinois, Indiana, Michigan and
Ohio. Projects included project manager for site layout and design of
telecommunication yards, which composed of architectural shelters, civil
development, structural aspects such as connections, specifying catalog parts and
cable routing. Duties included design, field-measure water towers, rooftop and raw
land sites, preparation of construction documents coordination with landscape
architects, civil, mechanical and electrical engineers.
Computer Imaging Department
Milwaukee Social Service Building Renovation, City of Milwaukee, WI – renovation
of an existing building to its original design. Renderings included streetscape,
retail level and glazing.
Daren Helminski
3375 S. 76th Street Milwaukee, WI 53219 414-***-**** abk5zn@r.postjobfree.com
Big Bend Industrial Park, Payne & Dolan, Inc., Big Bend, WI – razing of farmer’s
land to expand into an industrial park. Renderings featured site work, landscaping
and buildings.
Structural Department
Assisted in various projects drafting and field verifications for the Milwaukee,
Chicago and Madison offices.
Daren Helminski
3375 S. 76th Street Milwaukee, WI 53219 414-***-**** abk5zn@r.postjobfree.com