Mark G. Barkan
**** ******* ****** **** *****: 865-***-****
Knoxville, TN 37922 Cell phone: 704-***-****
E-mail: ***********@*******.***
Engineering and Project Manager with strong Lean/Six Sigma and Process
Improvement Experience
Cross-Functional Experience and Cross-Industry Expertise
Highly qualified Engineering and Project Manager offering 30 years of management
experience within construction and manufacturing industries. Results focused and
effectual leader with proven ability to deliver a project on time and within budget. Talent
for proactively identifying and resolving problems – facilitating/managing cross-functional
teams, controlling costs, and maximizing productivity. Advance computer skills.
Strengths in:
• Situation analysis and task/project development
• Managing cross-functional teams
• Business and manufacturing process analysis and improvement
• Proactive problem solving
• Project logic/schedule development
• Productivity enhancement
• Creative problem solving, application of Six Sigma, Lean, VE/VM and TRIZ for
solving technical and business/transactional problems
PROFESSIONAL EXPERIENCE
Lisega, Inc – Newport, TN 2007-2009
Engineering Manager
Lisega Inc is serving Energy Sector as a supplier of pipe supports and
supplementary steel. My responsibilities included:
• A key member of Lean Enterprise Steering Committee
• Review of customer specifications and cost estimates in the estimating
stage
• Identify technical challenges and provide proposals for resolution
• Recommend methods, materials and layouts for design improvement
based on manufacturing processes needs and capabilities
• Facilitation of Business and Technological Process improvement teams
• Schedule and assign required tasks
• Budget engineering staffing needs, facilities and software
Concept Catalysts – Charlotte, NC 2004-2007
Principal
Initially established Concept Catalysts as a technology and business consulting
company, which applied proprietary Innovation on Demand methodology to
facilitate analysis and improvement/modification of business and technological
processes.
Mark G. Barkan
Page 2
Ideation International Inc. – Detroit, MI 1997-2004
Director of Analytical Services & Engineering
Recruited initially as a member of Amoco Consulting team. Then, promoted to
Director and Amoco Program Manager. Responsibilities included overall project
management, client relations, and new project development. The company
utilized Lean, Six Sigma, VE and TRIZ methodologies to help its clients with
product/process development and improvements.
Key Results
• Facilitated client’s cross functional teams in process development and
improvement
• Negotiated several new projects with total amount of over $120M
• Introduced process improvements that maximized per project profit margins
by 27%
Gaston County Dyeing Machine Co. – Mount Holly, NC 1990-1997
Director of Engineering and R&D
Joined Gaston County Dyeing Machine Co. and charged with rebuilding the
company’s complete engineering operations.
Selected Results
• Championed transition from board drafting to AutoCAD and SolidWorks
software
• Reorganized MRP system’ application, resulting in reduction of 70
engineering hours per sales order
• Instituted concurrent engineering process, resulting in reduction of order lead
time from 21 to 12 weeks
• Directed a cross-functional team in modification of 2 product lines, resulting in
$145M in new orders from the customers who traditionally bought from the
competition
• Initiated a number of design changes resulting in 40% cost reduction across
several product lines
• Managed Manufacturing Process Improvement effort resulting in significant
reduction in total lead time
• Managed design-build-install project for a burned down textile mill, cutting
total project time by 20%
• A member of ISO9001 certification team
• Lead participant on Vendor Negotiations Team, which negotiated substantial
discounts on the majority of supplies
Mark G. Barkan
Page 3
Day Engineering (Consultants for Dupont) – Charlotte, NC 1985-1990
Process/Project Engineer
Performed steady state hydraulic and heat/mass flow calculation, developed
P&IDs and equipment specifications, procured equipment in accordance with
specifications, supervised piping engineers and designers. Facilities design,
supervised cross-functional teams in design and construction of various facilities.
Selected Projects
• Waynesboro Lycra solvent recovery piping system – reduced scheduled
completion time by 10%
• The biggest in Dupont organization new scrubber system – reduced design
and field installation cost by 25%
• Waynesboro Lycra #6 spinning machine – reduced scheduled design time by
25%
• Cape Fear Polyester plant – silo design-build project – reduced scheduled
design/construction time by 15%
Duke Power Co. – Charlotte, NC 1979-1985
Design Engineer/Group Leader
Performed stress analysis and structural calculations for pipe supports and
rupture restrains. Led a group of 90 engineers in P&IDs and piping design and
associated calculations. Specified and procured nuclear power plant equipment
in accordance with NRC seismic regulations. Organized seismic qualifications for
existing pipe supports based on statistical sampling as ordered by NRC.
Affiliations
President – the International TRIZ Association
ASME, B31.1 Power Piping Subcommittee – Sub Group on Materials
Certifications
EIT in North Carolina
Certified as TRIZ specialists, Level 4
Certified as Six Sigma Black Belt
Education
MSME from Moscow Technical University, Moscow, Russia
MBA from Queens College. Charlotte, NC.
Six Sigma Black Belt certification course
Completed Lean Manufacturing course
Extensive training in Business Process Analysis/Improvement
Special Skills
Working knowledge of Design for Six Sigma (DFSS), Six Sigma methodology, Failure Modes and
Effects Analysis (FMEA), tolerance allocation and lean manufacturing methods.
Fluent in Russian and Ukrainian