Post Job Free

Resume

Sign in

Project Manager Construction

Location:
Cairo Governorate, Egypt
Posted:
January 20, 2015

Contact this candidate

Resume:

''Curriculum Vitae''

''Personal Information

Name: SHERIEF GALAL ALI ABDRABOU

Nationality: Egyptian.

Gender: Male.

Date of Birth: September4, 1983

Address: Naser City -Cairo

Phone No. (Home): (+2)24183459

(Cell.): +2-010********, 011********

E-mail: abjqwl@r.postjobfree.com, abjqwl@r.postjobfree.com

Marital Status: Married

"Career Objectives":-

I am seeking a challenging career opportunity where my academic background,

personal skills and gained experience can be enhanced and utilized, through working in

relation with the fields of Quality,Safety,Health,Environmental Protection (QSHE).

"Qualification":-

July 2006 Graduated from the Faculty of Engineering (shoubra),

Benha University, Egypt.

Civil Department

Grade in Major Good

Project High ways and Airport

Grade in Major Excellent

"Computer Skills":-

AutoCAD.

Autodesk Land Desktop.

Word&Excel.

Power Point.

"Languages Skills":-

Native Language: Arabic

Other Languages: English

Experiences

- Interpret plans and estimate costs and quantities of materials needed

- Plan construction methods and procedures

- Coordinate the supply of labour and materials

- Supervise construction sites and direct site managers and subcontractors

to make sure standards of building performance, quality, cost schedules andsafety are

maintaine

- Study building contract documents and negotiate with building owners

andsubcontractors

- Control preparation of cost estimates and the documentation for contractbids

- Control payment to subcontractors by valuation of completed works

- Make sure that building regulations, standards and by-laws are enforced in

building operations

- Consult with architects, engineers and other technical workers to make

sure that design intentions are met

-Maintains and updates Supervision Resource Schedule for information and planning

purposes.

Oversees and provide support on construction logistics management.

-Ensures company procedures and statutory authority documents are in place for site

takeover at the beginning of construction projects.

-Ensures all Quality Assurance procedures are carried out.

-Visits sites on a regular basis & supports the Resident Engineers in resolving site/Client

issues.

-Assists & supports the Construction Director to develop staff budgets, schedules & financial

assessments on proposals.

-Oversees billing and collection of all supervision fees.

-Prepare and maintain all necessary construction documentation, assuring a consistent,

legally sufficient, time & cost effective construction management process.

-Revise and improve documents to conform to changes in legal requirement and practices.

-Participate in site meetings, negotiate claims and proposed change orders and associated

costs, resolve field and contractual differences between contractors, and process scheduled

progress payments.

"Posts Held":-

From feb.2014 till date:

"SODIC" [ ]

*(ESTOWN PROJECT) [ ]

* Content of project:

• Different types of residential buildings

• Town houses

• Swimming pool

• Club houses

• Commercial zone

* Title of my job:

* SR.(QA/QC) “arch. & civil works :

Responsibilities are :

• Inspect for all slopes of pipe lines of gas and water supply networks

• Inspect for concrete foundations of pipe lines as methodes of connection between

pipes and foundations with keeping it’s slope as plans drawings

• Supervise subcontractors and executing all works at high quality plan

• Inspections Requests

• Material Inspection Reports

• Job sites

• Transmital materials

• Non conformance Request

• Methodes of Statement & Inspection test plane

• Perp Meeting

From june.2013 till jan.2014:

"D.M.G" [ ]

*(HYDE PARK PROJECT) [ ]

* Content of project:

• Different types of residential buildings

• Town houses

* Title of my job:

* SR.(QA/QC) “arch. & civil works :

Responsibilities are :

• Inspect for all slopes of pipe lines of gas and water supply networks

• Inspect for concrete foundations of pipe lines as methodes of connection between

pipes and foundations with keeping it’s slope as plans drawings

• Supervise subcontractors and executing all works at high quality plan

• Inspections Requests

• Material Inspection Reports

• Job sites

• Transmital materials

• Non conformance Request

• Methodes of Statement & Inspection test plane

• Perp Meeting

From feb.2011 till june.2013:

"ArabTec Construction L.L.C" [ ]

(Porto ELsokhna) [South Beach Project] [ ]

* Project Manager [ ]

* Content of project:

• Different types of residential building s

• Swimming pools

• Under ground puplic toilet

• Utilities buildings as ( feul tanks, slow down chamber, lift station, under

ground water tanks (5000 m3), man holes, valves rooms, pump stations, electrical

substation, medium voltage and low current)

* Title of my job:

* Quality Control Manager (QA/QC) “arch. & civil works :

Responsibilities are :

• Inspect for all slopes of pipe lines of gas and water supply networks

• Inspect for concrete foundations of pipe lines as methodes of connection between

pipes and foundations with keeping it’s slope as plans drawings

• Supervise subcontractors and executing all works at high quality plan

• Inspections Requests

• Material Inspection Reports

• Job sites

• Transmital materials

• Non conformance Request

• Methodes of Statement & Inspection test plane

• Perp Meeting

From Feb.2010 till Feb. 2011

"Emaar Misr for Development S.A.E (Uptown cairo) [ ]

*Project Manager [ ]

* Title of my job:

* Quality Control Manager (QA/QC) “arch. & civil works :

Responsibilities are :

• Supervise subcontractors and executing all works at high quality plan

• Inspections Requests

• Material Inspection Reports

• Job sites

• Transmital materials

• Non conformance Request

• Methodes of Statement & Inspection test plane

• Perp Meeting

From Jan. 2009 to Feb. 2010

"Mediterranean Contracing Company".

(Egypt Air Maintenance & Engineering Company Building”TB3”.Project).

* Title of my job:

*Executing Engineer.

*Responsible for coordination between trades.

*Quality control, Quality assurance.

*Managing man power on day to day operations

From Jan. 2008 to Dec. 2008

# "EL-Zamel International Real-Estate". (AT KUWAIT)

* Title of my job:

* Quantities Calculations.

* Maintenance Works.

From Jan.2007 to Dec.2007

(Talat Mostafa Company)

"Madenaty Project".

* Title of my job:

* Executing Engineer.

* My job responsibilities included, but not limited to:

*Day to day supervision of construction activities on site, survey works, layouts

foundation works.

*Responsible for coordination between trades.

*Quality control, Quality assurance.

*Managing man power on day to day operations.

As a Trainee at:

"Siac General Contarcts Company".

* Day to day supervision of construction activities on site, survey works, layouts

foundation works.

I used to be trained during summer holiday in College.

It will be great honor joining your prestigious company.*

Thank you …



Contact this candidate