Post Job Free
Sign in

Design Engineer

Location:
Kirkland, WA, 98034
Posted:
October 15, 2010

Contact this candidate

Resume:

Shahana M. Rizvi ****************@*****.***

Drainage/Roadway Design Engineer

Professional Design Engineer with expertise in the areas of hydrology

and hydraulic analysis and highway/ roadway design and improvement

projects.

Education:

University of Washington, BS in Civil Engineering, 1985, EIT

Experience:

. INCA Engineers, Inc. Bellevue, WA - 08/2008 - 09/10/2009

A Street Expansion, Auburn, WA: Designed and analyzed the stormwater

detention, treatment and conveyance systems. Finalized the stormwater

report. Developed drainage plans, TESC plans, waterline plans and

estimates utilizing WSDOT and City's standards.

196th/ Novelty Hill Road Improvements, King County, WA: Developed

habitat and water quality permit plans, TESC plans and estimates for

roadway improvements, ponds, wetland mitigation area, streams and

tributary realignments. Prepared Stormwater Pollution Prevention Plan

(SWPPP). Utilized King County's standards.

Puyallup Parking Lot Expansion, Puyallup, WA (Sound Transit's Project):

Developed stormwater report providing analysis and design of an

underground detention vault, bioswales and conveyance system. Utilized

King County, DOE and City's standards. Prepared drainage plans, site

preparation plans TESC plans and estimates.

Tukwila Commuter Rail Station, Tukwila, WA (Sound Transit's Project):

Analyzed conveyance system of the proposed parking lot on StormShed

software. Performed hydrologic analysis for the proposed detention pond

and finalized stormwater report.

Kirkland Transit Center Expansion, Kirkland, WA (Sound Transit's

Project): Prepared Stormwater Pollution Prevention Plan (SWPPP)

utilizing City's standards.

Woodin Elementary School, Woodinville, WA: Designed alternatives for a

left turn lane into the Elementary School from adjacent street utilizing

WSDOT Design Manual.

. HW Lochner, Inc. Bellevue, WA - 01/2004-06/2008

I/5 Blaine Exit Interchange Improvements, Whatcom County, WA & Chuckanut

Park and Ride, Skagit County, WA: Developed WSDOT Type A

hydraulics/stormwater reports for both projects with complete design and

analysis of stormwater drainage, detention and treatment facilities.

Developed drainage plans, TESC plans and estimates utilizing WSDOT

standards, programs and spreadsheets.

244th Avenue Improvements, NE 8th Street to SE 8th Street, City of

Sammamish, WA: Prepared Technical Information Report (TIR) providing

design of conveyance system, detention pond, wet pond and StormFilter

water treatment system utilizing King County and DOE standards and

programs. Prepared a Groundwater Investigation Report.

Downtown Bremerton Tunnel and Pedestrian/ BTC Access Improvement

Project, Bremerton, WA: Performed a comprehensive research and analysis

of existing utilities and potential conflicts. Prepared final PS&E for

the relocated and new waterline (including services, fire hydrants and

valves) and new sanitary sewer system, utilizing WSDOT and City's

standards and programs.

8th Street Bridge Replacements, City of Port Angeles, WA: Prepared

stormwater drainage reports for the project; included a unique analysis

of the pipe manifold system for stormwater detention. Prepared plans,

specifications, quantities and cost estimates using WSDOT standards.

150th Avenue SE Newport Way to 37th Street, Roadway Improvements, City

of Bellevue, WA: Prepared hydraulic report providing design and

analysis of proposed storm sewer system, underground detention vault and

StormFilter water treatment system. Prepared final plans, profiles,

specifications and cost estimates utilizing DOE and City's standards and

programs.

SR 522 Improvements, City of Bothell, WA: Developed 60% drainage

design, plans, profiles and estimates.

SR 527 Improvements, City of Bothell, WA: Created roadway cross

sections and prepared utility conflict data,

SR 11/ I-5 Interchange and Josh Wilson Road Improvements, Skagit County,

WA: Prepared a preliminary write up for WSDOT Type A hydraulic/

stormwater report about existing conditions, potential conveyance

issues, capacity concerns and constraints.

SR 530/ Sauk River CED Bank Erosion, Skagit County, WA: Prepared

Endangered Species Act Stormwater Design and Erosion Checklist.

SR 20-Fredonia to I-5, Stage 1, Skagit County, WA: Prepared preliminary

erosion control plans and estimates.

. INCA Engineers, Bellevue, WA- 4/2002 - 9/2002

Feasibility Study, Canyon Park, Park and Ride, Bothell, WA: Developed

design & plans for a transit flyer stop on Southbound I-5 with a

pedestrian bridge connecting to Canyon Park Park & Ride utilizing WSDOT

Design Manual and HOV lane design standards.

. Bell-Walker Engineers Inc. Bellevue, WA - 10/1990 - 6/1992

. City of New York Dept. of Environmental Protection, Bureau of Sewers-

6/1989 - 9/1990 Massand Associates, Consulting Engineers, New York -

1986 - 1987

Computer Skills:

Auto CADD 2008, Civil 3D 2008, Microstation, Land Development

Desktop/Autodesk 2008, MGS Flood V3, WWHM, StormShed, KCRTS, Flow

master, Word & Excel

Professional Competencies:

Hydrologic / Hydraulic Design and Analysis, Storm Drain System Design,

Hydraulics / Stormwater Reports, Detention and Water Treatment Facility

Design, Erosion Control Design, Highway / Roadway Design, PS&E, Sanitary

& Waterline Design, Utility Conflicts & Relocations

Additional Training:

Biological Assessment preparation for transportation projects

(Dilution Model), Construction Site Erosion & Pollution Control

Certification, Roundabouts, Specification writing



Contact this candidate