Shahana M. Rizvi ****************@*****.***
Drainage/Roadway Design Engineer
Professional Design Engineer with expertise in the areas of hydrology
and hydraulic analysis and highway/ roadway design and improvement
projects.
Education:
University of Washington, BS in Civil Engineering, 1985, EIT
Experience:
. INCA Engineers, Inc. Bellevue, WA - 08/2008 - 09/10/2009
A Street Expansion, Auburn, WA: Designed and analyzed the stormwater
detention, treatment and conveyance systems. Finalized the stormwater
report. Developed drainage plans, TESC plans, waterline plans and
estimates utilizing WSDOT and City's standards.
196th/ Novelty Hill Road Improvements, King County, WA: Developed
habitat and water quality permit plans, TESC plans and estimates for
roadway improvements, ponds, wetland mitigation area, streams and
tributary realignments. Prepared Stormwater Pollution Prevention Plan
(SWPPP). Utilized King County's standards.
Puyallup Parking Lot Expansion, Puyallup, WA (Sound Transit's Project):
Developed stormwater report providing analysis and design of an
underground detention vault, bioswales and conveyance system. Utilized
King County, DOE and City's standards. Prepared drainage plans, site
preparation plans TESC plans and estimates.
Tukwila Commuter Rail Station, Tukwila, WA (Sound Transit's Project):
Analyzed conveyance system of the proposed parking lot on StormShed
software. Performed hydrologic analysis for the proposed detention pond
and finalized stormwater report.
Kirkland Transit Center Expansion, Kirkland, WA (Sound Transit's
Project): Prepared Stormwater Pollution Prevention Plan (SWPPP)
utilizing City's standards.
Woodin Elementary School, Woodinville, WA: Designed alternatives for a
left turn lane into the Elementary School from adjacent street utilizing
WSDOT Design Manual.
. HW Lochner, Inc. Bellevue, WA - 01/2004-06/2008
I/5 Blaine Exit Interchange Improvements, Whatcom County, WA & Chuckanut
Park and Ride, Skagit County, WA: Developed WSDOT Type A
hydraulics/stormwater reports for both projects with complete design and
analysis of stormwater drainage, detention and treatment facilities.
Developed drainage plans, TESC plans and estimates utilizing WSDOT
standards, programs and spreadsheets.
244th Avenue Improvements, NE 8th Street to SE 8th Street, City of
Sammamish, WA: Prepared Technical Information Report (TIR) providing
design of conveyance system, detention pond, wet pond and StormFilter
water treatment system utilizing King County and DOE standards and
programs. Prepared a Groundwater Investigation Report.
Downtown Bremerton Tunnel and Pedestrian/ BTC Access Improvement
Project, Bremerton, WA: Performed a comprehensive research and analysis
of existing utilities and potential conflicts. Prepared final PS&E for
the relocated and new waterline (including services, fire hydrants and
valves) and new sanitary sewer system, utilizing WSDOT and City's
standards and programs.
8th Street Bridge Replacements, City of Port Angeles, WA: Prepared
stormwater drainage reports for the project; included a unique analysis
of the pipe manifold system for stormwater detention. Prepared plans,
specifications, quantities and cost estimates using WSDOT standards.
150th Avenue SE Newport Way to 37th Street, Roadway Improvements, City
of Bellevue, WA: Prepared hydraulic report providing design and
analysis of proposed storm sewer system, underground detention vault and
StormFilter water treatment system. Prepared final plans, profiles,
specifications and cost estimates utilizing DOE and City's standards and
programs.
SR 522 Improvements, City of Bothell, WA: Developed 60% drainage
design, plans, profiles and estimates.
SR 527 Improvements, City of Bothell, WA: Created roadway cross
sections and prepared utility conflict data,
SR 11/ I-5 Interchange and Josh Wilson Road Improvements, Skagit County,
WA: Prepared a preliminary write up for WSDOT Type A hydraulic/
stormwater report about existing conditions, potential conveyance
issues, capacity concerns and constraints.
SR 530/ Sauk River CED Bank Erosion, Skagit County, WA: Prepared
Endangered Species Act Stormwater Design and Erosion Checklist.
SR 20-Fredonia to I-5, Stage 1, Skagit County, WA: Prepared preliminary
erosion control plans and estimates.
. INCA Engineers, Bellevue, WA- 4/2002 - 9/2002
Feasibility Study, Canyon Park, Park and Ride, Bothell, WA: Developed
design & plans for a transit flyer stop on Southbound I-5 with a
pedestrian bridge connecting to Canyon Park Park & Ride utilizing WSDOT
Design Manual and HOV lane design standards.
. Bell-Walker Engineers Inc. Bellevue, WA - 10/1990 - 6/1992
. City of New York Dept. of Environmental Protection, Bureau of Sewers-
6/1989 - 9/1990 Massand Associates, Consulting Engineers, New York -
1986 - 1987
Computer Skills:
Auto CADD 2008, Civil 3D 2008, Microstation, Land Development
Desktop/Autodesk 2008, MGS Flood V3, WWHM, StormShed, KCRTS, Flow
master, Word & Excel
Professional Competencies:
Hydrologic / Hydraulic Design and Analysis, Storm Drain System Design,
Hydraulics / Stormwater Reports, Detention and Water Treatment Facility
Design, Erosion Control Design, Highway / Roadway Design, PS&E, Sanitary
& Waterline Design, Utility Conflicts & Relocations
Additional Training:
Biological Assessment preparation for transportation projects
(Dilution Model), Construction Site Erosion & Pollution Control
Certification, Roundabouts, Specification writing