PROFESSIONAL PROFILE
Civil Engineer with *+ years of progressive experience in development of
aviation projects, DOT, municipal, and private civil projects.
Enthusiastic, multi-tasker, adaptable to diversified work environments.
Resourceful manager and leader with excellent negotiation, time, and people
management skills.
Core competencies include:
Change order review and negotiation
Cost tracking and monitoring for lump-sum, cost plus, and unit price
contracts
Analysis of cost and time impact of changes
Project and contract documentation
Field and Construction Management
Contract administration and negotiation
Education
2009- Present Master of Science in Construction Management
Florida International University Miami, FL
GPA: 3.7/4.0
Expected graduation: Dec 13, 2010
2001-2004 Bachelor of Science in Civil engineering.
University of South Florida Tampa, FL
Professional Registration
AACE International 2009, Certified Cost Engineer
USGBC 2009, LEED AP
EMPLOYMENT
EL NUEVO DORADO Bogota, Colombia
COST / ENGINEER COORDINATOR Feb 2010 - Present
El Nuevo Dorado International Airport, Bogota Colombia. Program Management
Services.
Project management services for El Dorado International Airport expansion
and modernization program. Total construction cost: U$ 700+ million
1. Responsible for tracking of cost savings brought to the program by the
Program Manager.
2. Responsible for preparing billing/invoicing documentation.
3. Responsible for preparing monthly report to the client
(Concessionaire), and bi-monthly reports to the project Owner
(Colombian Civil Aviation Authority)
4. Responsible for coordinating activities between the office and field
engineers.
5. Participate in weekly meetings with concessionaire, owner
representatives, and contractor to discuss contractual issues and
scheduling issues.
6. Responsible for maintaining the project documentation, and
administrating Primavera Contract Manager.
PARSONS-ODEBRECHT JV Miami, Florida
SENIOR PROJECT CONTROLS ENGINEER Jan 2007 - Jan 2010
Miami International Airport, North Terminal Development Consolidation
Program, Senior Project Controls Engineer 747B, 775C, and 778B1 projects
North Terminal serves as American Airline's hub for Latin America and the
Caribbean. The North Terminal Development program included 1.8 million sf
of new construction and the renovation of 1.7 million sf, as well as the
construction of a one-mile long automated people mover.
7. As Senior Project Controls Engineer I was responsible for leading and
coordinating the cost control team for three projects with a total
construction budget of over 400+ million US dollars part of a multi-
billion dollar program.
8. Responsible for cost monitoring and control for the above mentioned
projects.
9. Conduct weekly site visits to monitor work progress as part of the
efforts for the monthly report and monthly payment requests.
10. Negotiated schedule of values with the client and subcontractors.
11. Responsible for tracking of contingency funds, and approval of change
orders and purchase orders to subcontractor and vendors.
12. Responsible for analyzing and reporting all cost information to Senior
Project Manager and Program Project Controls Manager
13. Prepared monthly accruals.
14. Responsible for requesting, evaluating and negotiating proposals.
15. Reviewed and negotiate change orders with the client.
16. Responsible for updating cost information in cost loaded P6 schedule.
17. Ensured that DBE utilization reports, lien releases, certified payroll
and other documentation was updated as required for all
subcontractors.
18. Reviewed and approved pay requests for subcontractors.
19. Trained new cost engineers.
20. Prepared documentation and attended auditors during end of year audit.
Carter & Burgess Tampa, Florida
ENGINEER Aug 2004 -Nov 2006
US 19/SR 55 Design, FL; Engineering Intern.
1. Assisted project manager with geometric design.
2. Responsible for plans production ensuring compliance with FDOT's Plans
Preparation Manual, CADD production criteria and Design Standards.
3. Responsible for collecting existing ERP permits, and conducting field
investigations for SWFWMD permit application package.
4. Conducted field investigations in order to determine flood prone areas
within the project site. Determined possible drainage solutions based
on field inspections.
5. Assisted project manager in the preparation of ERP applications for
SWFWMD permits.
6. Performed drainage calculations using ASAD and GeoPak Drainage.
Clark Road at Honore Avenue Roadway Improvements, FL; Project Manager.
7. Designed roadway improvements to meet concurrency associated with a
proposed residential subdivision.
8. Responsible for permit applications for different permitting agencies.
District One I-75 PD&E Study, FL; Engineering Intern. PD&E Study along I-
75, from north of SR 78 to north of Kings Highway in Lee and Charlotte
Counties.
21. Responsible for data collection and field investigations as part of
drainage team efforts for SWFWMD permitting process.
22. Evaluated existing drainage structures for compliance with design
standards, and proposed changes/exceptions to the existing alignment.
23. Responsible for Location Hydraulics Report, and basin calculations for
Pond Sitting Report.
District Seven FIHS Corridor Studies, Tampa, FL; Engineering Intern.
24. Assisted the Lead Engineer in conducting capacity analysis and traffic
forecast for Interstate 75.
Stonedam Preserve/Wellington Lake Manor Offsite Roadway Improvements, FL;
Project Engineer.
25. Responsible for setting up project files, including Design
Documentation File
26. Responsible for geometric design, plans preparation, and permit
documentation.
SKILLS
SOFTWARE
Primavera Contract Manager, MicroStation, Microsoft Office, Primavera P6,
GeoPak, Timberline, Internet Explorer
LANGUAGES Fluent English-Spanish
REFERENCES UPON REQUEST