**+ years in Manufacturing environment including *+ years in technical
analysis, support and process improvement. Excel at strategic planning,
Project Management, Inventory Control and implementation of Lean practice
methodologies and continuous improvement programs. Strategically and cost-
effectively use technologies to increase revenue flow, improve delivery
times and expand customer service levels.
E D U C A T I O N
T R A I N I N G
Bachelor of Science in Computer Science GARS SAP Education and Training 05-2001
05-2007 eSoleil Training (4 days) with SUN
Saint Augustine's College Raleigh, NC Microsystems 06-2007
Crystal Report Training (2 days) 02-2008
Front Line Leadership Training 08-2005
SOX Compliance Training in IT, Materials
and Finance
(2 days) 11-2008
Six Sigma Lean Training I,II & III( March
2008, February 2009, April 2010)
Diploma in Physics, Chemistry and
Mathematics 06-1998 to 06-2000
Al Muntazir Seminary School Dar es
Salaam, Tanzania
Electrical Engineering Coursework
01-1998 to 05-1998
Dar es Salaam Institute of Technology
Tanzania
Q U A L I F I C A T I O N H I G H L I G H T S
Information Technology Cost Analysis and Containment Inventory Management
Project & Program Management Lean Manufacturing Practices Client Relationship
Management
Production Schedule Management Oral and Written Communication Team Building and
Leadership
Research & Development Process Integration & Operations
Improvement Optimization
Purchasing & Strategic Quality Assurance Technical Writing
Planning
T E C H N I C A L E X P E R T I S E
Systems Hardware Testing, Troubleshooting, Repair and Upgrade of PC Desktops,
Laptops and Servers.
Operating Systems MS-DOS, Linux, Mac OS and OSX, Windows (95, 98, 2000/NT, XP,
Vista, Win 7)
Software Software Testing and Upgrading. Strong knowledge in ERP/MRP
Systems SAP, Baan, Oracle 9, 10 and 11, SharePoint, Proficient in
Microsoft Office 2000, 2003 and 2007 (Word, Excel, Access,
PowerPoint, FrontPage, Publisher, Visio), Lotus Notes, Datasweep,
eSoleil, Crystal Reports, Adobe Creative Suite 4 (InDesign,
Photoshop, Illustrator, Flash, Dreamweaver, Fireworks, Acrobat),
Internet Explorer, Firefox, Safari, Netscape Communicator
Networking Ethernet, Wi-Fi, TCP/IP, routers, hubs and switches, network
security, LAN, WAN, FDDI, ATM, token, CSMA/CA (LocalTalk)
Languages C, C++, Visual Basic, Java, HTML, XML, JSP, XHTML, PHP, SQL
P R O F E S S I O N A L E X P E R I E N C E
Inventory Control Manager Flextronics RTP, NC 05-2007 to Present
Manage Inventories of over $55 million annually which spread across 3
geographical regions (Americas, Europe and Asia Pacific).
. Improve Inventory turns by determining and coordinating targets for
all inventory types.
. Managing Inventory audits, cycle counts, physical wall-to-wall
inventories and shelf life audits.
. Maintains policies, procedures and control systems in accordance to
Company's compliance.
. Oversee continuing education and training for team members; have
trained over 60 employees, including 4 supervisors.
. Managing inventory integrity of company-owned, vendor-managed and
consigned inventories by auditing and cycle counting.
. Managing Excess, Obsolete and Buy Back Inventory to Reduce Cost,
Floor Space and Improve Cash Flow.
. Managing Production Planning and Purchasing Teams.
. Acting back up for Program Manager and managed several Kaizen
Projects on Process Improvement.
>
> Continued on next page
Key Accomplishments: -Improved Inventory Turns from 6% -8% quarterly
which reduced Inventory Levels and improved cash Flow.
-Improved Inventory Accuracy from 85% to 99.8% within 6 months and
consistently maintaining higher standards and Integrity of company
and customer Assets.
-Worked closely with system developer to refine and modify DataSweep, our
internal system data tracking tool. My recommendations directly led to
the improvement of inventory traceability, inventory integrity and
significant cost savings. Also advised customer's IT group on enhancing
their system of record (eSoleil) and on methods to improve their data
tracking.
Production Planner Flextronics Morrisville, NC 04-2005 to 05-2007
Led a team of 25+ operations personnel and directed department activities
to meet daily production goals. Worked closely with management, production
and other staff to achieve operation efficiency and execution excellence.
Used just-in-time (JIT) production, ABC strategies, the Kanban system and
ERP/MRP tools to maximize production yields, streamline production
schedules and increase revenue.
. Coordinated with buyers to ensure materials delivery; supported
production schedules based on forecasted customer needs.
. Developed and coordinated manufacturing schedules through Six Sigma
Lean concepts, which resulted in:
V Exceeding production requirements and inventory turn objectives
V Surpassing customer service goals
V Optimizing plant efficiency
. Acting back up for Program Manager and managed several Projects on
Process Improvement.
. Acting back up for Material Manager.
Key Accomplishments: Increased revenue from $11 million/year to over $17
million/year within 12months. Reduced inventory level from 15,000 units
to 9,000 units in just two months which significantly improved inventory
turns from 3%-6% per quarter.
Production Supervisor + Production Planner Solectron Global Services
Morrisville, NC 03-2004 to 03-2005
Effectively supervised a team of 65+ employees to design, implement and
manage IT projects for various internal departments. As Lead Supervisor
(2nd Shift), I handled SAP system failures with the help of IBM's 24-hour
customer support center.
Acted as Interim Production Planner for 6 months.
. Handled server failures and performed servers resets and patch updates
to ensure minimal interruptions during business-critical downloads.
. Provided team leadership and direction; conducted effective and
engaging staff training; performed employee evaluations.
. Cross-trained and assigned employees to various areas within the
organization, which resulted in:
V Maximizing production efficiency
V Surpassing output requirements
V Maintaining high standard of quality
Key Accomplishments: Improved production by 30% through purposeful project
management practices. Took the initiative to volunteer as IT support for
2nd shift (which had no IT support at the time).
IT Support IBM/Solectron Global Service Morrisville, NC 10-2000 to
03-2004
Managed onsite IT desktop support and operations. Led 10 technical support
personnel. Hardware asset management accountability for 600+ PCs.
. Coordinated the installation of information processing systems;
analyzed equipment and recommended upgrades and modifications.
. Analyzed moderately complex business problems and developed office
automation applications for end-users.
. Developed and documented technical requirements, policies and best
practices.
. Provided guidance, technical leadership and training for new and less-
experienced employees.
. Performed set-up, support and maintenance of standalone and networked
PCs, software, terminals and peripherals.
Key Accomplishments: Collaborated with IT group, system developers and
manufacturing and testing engineers to create and implement process
improvements, to ensure system stability and functionality of all new and
upgrade software and to analyze, diagnose and make recommendations for
computer hardware.
ISLEM ABDALLAH
1601 Amber Ridge Lane Apt. D Raleigh, NC 27607 919-***-****
*******@*****.***
ISLEM ABDALLAH 1601 Amber Ridge Lane Apt. D Raleigh, NC 27607 919-
971-4290 *******@*****.*** pg 2 of 2