Urb. Perla del 787-***-**** /
#**** ***** *************@yaho
Caratini St. o.com
Ponce, P.R.
Jesse Torres
Professional Qualified professional with many years of
Profile experience in the construction industry,
maintenance and utilities. Ability to manage
multiple tasks, analytical and communications
skills, in both Spanish and English. Strong
supervisory skills with excellent leadership and
interpersonal relationships. Proficient in Internet
and Microsoft Office including Word, Excel and
Outlook. Knowledgeable in Visio, Primavera and
Microsoft Project. Union Experience. TWIC
cardholder.
Experience 2009 - Present BES Enterprises Inc.
Ponce, PR
Facilities Engineer
Building and utilities maintenance management of
Saint Lucas Memorial Hospital.
Assure coordination of all aspects of preventive,
corrective and planned maintenance scheduling.
Development of facility maintenance planning,
scheduling and work execution to achieve the
hospital operation.
Direct supervision for installation, maintenance
and repair of HVAC, pumps, boilers, emergency
systems (A/C and power generation plants), water
softeners, LPG system, medical gases, compressors,
pumps, piping, medical equipment, fire system, fire
alarm system, electrical system, plumbing, etc.
Prepare, collect and maintain equipment and systems
Maintenance Logs.
Working with staff, vendors and contractors to
support the facilities.
Coordination with State Utilities Agencies to
assure hospital's operation.
Estimate remodeling and construction projects.
Evaluate and negotiates contracts.
Assist to project construction pre-bid meetings.
Personnel supervision and training.
Enforce safety and Company policy.
2007-2009 ARG Precision Corp. Toa Baja,
PR
Construction Project Manager
Manage and supervise construction projects for PR
Energy and Power Authority.
Managed projects up to $2.3 million.
Chemical cleaning of condenser and auxiliary
condenser of generator unit #2 of Aguirre Thermo
electrical Plant.
Office building remodeling in PR Energy and Power
Authority Hidrogas Plant at Mayaguez.
Assist to all project construction meetings.
Prepare and update project schedule and cost
estimates on a routine basis.
Obtains, organizes, and maintains all project
contract documents.
Manages resources by planning, scheduling and
forecasting manpower and resource requirements.
Manage all document control for projects,
including, but not limited to:
RFI's, meeting minutes, punch lists, transmittal
log, submittal log, change order log and issues
log.
Coordinates project in accordance with contract
documents and approved construction estimate.
Materials and equipment buy out, equipment rental,
evaluate subcontractor proposals and manage
subcontracts.
Assist to projects pre-bids and project estimation.
Prepares and delivers final project closure and
documentation to customers. Invoice and collects
payments. Reviews and approves material and
subcontract invoices for payment.
Signature level authority as indicated by the
Company's Authorization Level Document.
Materials, equipment, parts, tools, services,
equipment rental and other supplies negotiation.
Personnel supervision, training and recruiting.
Enforce safety and Company policy.
2000-2007 Berm dez & Longo, S.E. San Juan,
PR
Construction Project Manager
Manage and supervise construction projects for PR
Aqueduct & Sewer Authority and Infrastructure
Facilities Authority as aqueduct and sewer
distribution systems, filtration plants, and water
& sewer pumps stations.
Manage and supervise industrial maintenance project
at Eli Lilly's bulk plant in Mayag ez.
Manage and supervise tank farms improvement and 24"
FRP pipe installation between buildings and
incinerator at Bristol Barceloneta.
Managed projects up to $11.4 million.
Managed $5 million time and material maintenance
and construction contract with PR Aqueduct & Sewer
Authority.
Receive, organize and review information from the
Estimate Department.
Comply with all Company's standard operating
procedures (SOP's).
Assist to all project construction meetings.
Prepare and update project schedule and cost
estimates on a routine basis.
Obtains, organizes, and maintains all project
contract documents.
Manages resources by planning, scheduling and
forecasting manpower and resource requirements.
Manage all document control for projects,
including, but not limited to:
RFI's, meeting minutes, punch lists, transmittal
log, submittal log, change order log and issues
log.
Coordinates project in accordance with contract
documents and approved construction estimate.
Prepares project billing revenue forecasts and
schedule of values.
Materials, equipment, parts, tools, services,
equipment rental and other supplies negotiation.
Prepares installation subcontractor bidding
documents, evaluate and negotiates subcontracts.
Prepares and delivers final project closure and
documentation to customers. Invoice and collects
payments. Reviews and approves material and
subcontract invoices for payment.
Signature level authority as indicated by the
Company's Authorization Level Document.
Personnel supervision, training and recruiting.
Enforce safety and Company policy.
1996-2000 Berm dez & Longo, S.E. San
Juan, PR
Construction Project Engineer
Developed civil, earth movement, electrical,
instrumentation, controls and mechanical
construction in aqueduct and sewer projects for PR
Aqueduct & Sewer Authority and Infrastructure
Facilities Authority.
Personnel supervision and recruiting.
Enforce safety and Company policy
1994-1996 Maintech 2001, Inc.
Ponce, PR
Hospital Maintenance Department Director
Building, ground and utilities maintenance
management of Ponce Regional Hospital.
Government and Company personnel supervision.
Working with staff, vendors and contractors to
support the facilities.
Coordination with State Utilities Agencies to
assure hospital's operation.
Responsible for all aspects of maintenance,
electrical and mechanical reliability in a 24-7
operation with minimal downtime.
Assure coordination of all aspects of preventive,
corrective and planned maintenance scheduling.
Development of facility maintenance planning,
scheduling and work execution to achieve the
hospital operation.
Direct supervision for installation, maintenance
and repair of HVAC, pumps, boilers, emergency
systems (A/C and power generation plants), water
softeners, LPG system, medical gases, compressors,
pumps, piping, medical equipment, fire system, fire
alarm system, electrical system, plumbing, etc.
Prepare, collect and maintain equipment and systems
Maintenance Logs.
Member of Safety Committee, Accreditation
Committee, Joint Commission Committee, Quality
Committee and Executive Management Board.
Education 1985-1989 Polytechnic University of Puerto Rico
San Juan, PR
B.S. Electrical Engineering.
1991 PROSHA
General Industry New Development Safety Seminar
1995 Department of Education of Puerto Rico
Techniques for Employees Supervision
1996 PRECOS - Presidents and Safety Officers
Association of PR
Hazard Communication 29CFR 1910.1200
1996 RUTGERS
Indoor Air Quality Basics
1996 Berm dez & Longo, S.E.
Personal protection
2000 Berm dez & Longo, S.E.
Confined Space
2003 OSHA
10 hours Occupational Safety and Health Training
Course in Construction Safety & Health
Interests Traveling and computers.