Post Job Free
Sign in

Project Manager Maintenance

Location:
717
Posted:
October 17, 2010

Contact this candidate

Resume:

Urb. Perla del 787-***-**** /

Sur ***-****

#**** ***** *************@yaho

Caratini St. o.com

Ponce, P.R.

*****-****

Jesse Torres

Professional Qualified professional with many years of

Profile experience in the construction industry,

maintenance and utilities. Ability to manage

multiple tasks, analytical and communications

skills, in both Spanish and English. Strong

supervisory skills with excellent leadership and

interpersonal relationships. Proficient in Internet

and Microsoft Office including Word, Excel and

Outlook. Knowledgeable in Visio, Primavera and

Microsoft Project. Union Experience. TWIC

cardholder.

Experience 2009 - Present BES Enterprises Inc.

Ponce, PR

Facilities Engineer

Building and utilities maintenance management of

Saint Lucas Memorial Hospital.

Assure coordination of all aspects of preventive,

corrective and planned maintenance scheduling.

Development of facility maintenance planning,

scheduling and work execution to achieve the

hospital operation.

Direct supervision for installation, maintenance

and repair of HVAC, pumps, boilers, emergency

systems (A/C and power generation plants), water

softeners, LPG system, medical gases, compressors,

pumps, piping, medical equipment, fire system, fire

alarm system, electrical system, plumbing, etc.

Prepare, collect and maintain equipment and systems

Maintenance Logs.

Working with staff, vendors and contractors to

support the facilities.

Coordination with State Utilities Agencies to

assure hospital's operation.

Estimate remodeling and construction projects.

Evaluate and negotiates contracts.

Assist to project construction pre-bid meetings.

Personnel supervision and training.

Enforce safety and Company policy.

2007-2009 ARG Precision Corp. Toa Baja,

PR

Construction Project Manager

Manage and supervise construction projects for PR

Energy and Power Authority.

Managed projects up to $2.3 million.

Chemical cleaning of condenser and auxiliary

condenser of generator unit #2 of Aguirre Thermo

electrical Plant.

Office building remodeling in PR Energy and Power

Authority Hidrogas Plant at Mayaguez.

Assist to all project construction meetings.

Prepare and update project schedule and cost

estimates on a routine basis.

Obtains, organizes, and maintains all project

contract documents.

Manages resources by planning, scheduling and

forecasting manpower and resource requirements.

Manage all document control for projects,

including, but not limited to:

RFI's, meeting minutes, punch lists, transmittal

log, submittal log, change order log and issues

log.

Coordinates project in accordance with contract

documents and approved construction estimate.

Materials and equipment buy out, equipment rental,

evaluate subcontractor proposals and manage

subcontracts.

Assist to projects pre-bids and project estimation.

Prepares and delivers final project closure and

documentation to customers. Invoice and collects

payments. Reviews and approves material and

subcontract invoices for payment.

Signature level authority as indicated by the

Company's Authorization Level Document.

Materials, equipment, parts, tools, services,

equipment rental and other supplies negotiation.

Personnel supervision, training and recruiting.

Enforce safety and Company policy.

2000-2007 Berm dez & Longo, S.E. San Juan,

PR

Construction Project Manager

Manage and supervise construction projects for PR

Aqueduct & Sewer Authority and Infrastructure

Facilities Authority as aqueduct and sewer

distribution systems, filtration plants, and water

& sewer pumps stations.

Manage and supervise industrial maintenance project

at Eli Lilly's bulk plant in Mayag ez.

Manage and supervise tank farms improvement and 24"

FRP pipe installation between buildings and

incinerator at Bristol Barceloneta.

Managed projects up to $11.4 million.

Managed $5 million time and material maintenance

and construction contract with PR Aqueduct & Sewer

Authority.

Receive, organize and review information from the

Estimate Department.

Comply with all Company's standard operating

procedures (SOP's).

Assist to all project construction meetings.

Prepare and update project schedule and cost

estimates on a routine basis.

Obtains, organizes, and maintains all project

contract documents.

Manages resources by planning, scheduling and

forecasting manpower and resource requirements.

Manage all document control for projects,

including, but not limited to:

RFI's, meeting minutes, punch lists, transmittal

log, submittal log, change order log and issues

log.

Coordinates project in accordance with contract

documents and approved construction estimate.

Prepares project billing revenue forecasts and

schedule of values.

Materials, equipment, parts, tools, services,

equipment rental and other supplies negotiation.

Prepares installation subcontractor bidding

documents, evaluate and negotiates subcontracts.

Prepares and delivers final project closure and

documentation to customers. Invoice and collects

payments. Reviews and approves material and

subcontract invoices for payment.

Signature level authority as indicated by the

Company's Authorization Level Document.

Personnel supervision, training and recruiting.

Enforce safety and Company policy.

1996-2000 Berm dez & Longo, S.E. San

Juan, PR

Construction Project Engineer

Developed civil, earth movement, electrical,

instrumentation, controls and mechanical

construction in aqueduct and sewer projects for PR

Aqueduct & Sewer Authority and Infrastructure

Facilities Authority.

Personnel supervision and recruiting.

Enforce safety and Company policy

1994-1996 Maintech 2001, Inc.

Ponce, PR

Hospital Maintenance Department Director

Building, ground and utilities maintenance

management of Ponce Regional Hospital.

Government and Company personnel supervision.

Working with staff, vendors and contractors to

support the facilities.

Coordination with State Utilities Agencies to

assure hospital's operation.

Responsible for all aspects of maintenance,

electrical and mechanical reliability in a 24-7

operation with minimal downtime.

Assure coordination of all aspects of preventive,

corrective and planned maintenance scheduling.

Development of facility maintenance planning,

scheduling and work execution to achieve the

hospital operation.

Direct supervision for installation, maintenance

and repair of HVAC, pumps, boilers, emergency

systems (A/C and power generation plants), water

softeners, LPG system, medical gases, compressors,

pumps, piping, medical equipment, fire system, fire

alarm system, electrical system, plumbing, etc.

Prepare, collect and maintain equipment and systems

Maintenance Logs.

Member of Safety Committee, Accreditation

Committee, Joint Commission Committee, Quality

Committee and Executive Management Board.

Education 1985-1989 Polytechnic University of Puerto Rico

San Juan, PR

B.S. Electrical Engineering.

1991 PROSHA

General Industry New Development Safety Seminar

1995 Department of Education of Puerto Rico

Techniques for Employees Supervision

1996 PRECOS - Presidents and Safety Officers

Association of PR

Hazard Communication 29CFR 1910.1200

1996 RUTGERS

Indoor Air Quality Basics

1996 Berm dez & Longo, S.E.

Personal protection

2000 Berm dez & Longo, S.E.

Confined Space

2003 OSHA

10 hours Occupational Safety and Health Training

Course in Construction Safety & Health

Interests Traveling and computers.



Contact this candidate