Ruben Perez
Technical Architect & Civil Engineer
Seattle, WA Phone: 206-***-**** Email: ************@*****.*** http://www.linkedin.com/in/rubenpdm
Objective
A position contributing my experience, strong technical aptitude, quality consciousness, and passion in this field.
Summary
6 years of project manager experience in the architecture and engineering field .
Managed multimillion-dollar projects for governments and private companies during the construction progress, including
design, financial analysis and supervision of works.
Relevant projects managed include city halls, headquarters, schools, subway stations, bus stations, public squares,
wind-farms, and exhibition buildings.
Proven proficiency in finishing projects on time and within budget.
Languages: Spanish, English, and Portuguese.
Education
Universidad Europea de Madrid (Spain) BSc in Civil Engineering, 2013.
Universidad de Zaragoza (Spain) BSc in Building Engineering, 2011.
BSc in Technical Architecture, 2007.
Skills
AutoCAD Construction Management Drafting
Autodesk Revit - BIM Green building experience Technical Drawing
Microsoft office Sustainable Design Developing Details
Microsoft Project Urban Design Construction Documents
IBM Lotus Finish Construction Drawings
Presto – Cost management Architectural Drawings
Wind energy
Relevant Professional Experience
2007 - 2013 – Project Manager & Project Technical Architect at Idom/ACXT, Zaragoza (Spain). www.idom.com
Multinational engineering, architecture and consulting firm serving government and commercial clients.
Drew up large civil and architectural projects according to customer requirements (public and private), achieving
deadlines, quality and budget.
Identified and solved potential technical problems before work execution in order to preserve timelines and budgets.
Analyzed financial investment for work execution to keep the budget under control.
Composed design drawings, measurements, budget s, specification sheets, quality control plans, waste management
plans and health and safety plans of working projects.
Site supervision, quality and execution control, monthly analytical control of the investment, document m anagement and
deadlines control, resulting in great savings for the company and the clients.
Technical management with civil liability.
2006 – Assistant of Construction Manager at Ferrovial, Zaragoza (Spain). www.ferrovial.com
Spanish multinational company involved in the design, construction, financing, operation (DBFO), and maintenance of transport,
urban, and services infrastructure.
Identified and solved technical problems in advance.
Organized and scheduled daily work, human, and material resources.
Made quality control of materials and security resources.
Acquired experience in blueprint reading, as well as preparation of maps and plans.
Most Relevant Projects
As Project Manager:
Foundations and roads at Wind Farm Pedra do Reino (Brazil). 2011-2012. Budget $14.2M.
Wind Farm with 16 turbines, 8.5 km of roads, electrical substation, and 40 km power transmission line.
Bruil Park Infant School. 2010-2011. Budget $6.2M.
Public building, 1,730 m2 of surface, and 5,138 m2 of basement.
Calatayud Bus Station. 2008-2009. Budget $4.8M.
Public building, 1,500 m2 of surface, and 4,000 m2 of urbanization.
67 Public Schools Refurbishment. 2009. Budget $12.1M.
Renovation of Metropolitan Zaragoza Seminary as Municipal Administrative Center. 2007-2009. Budget $72.5M.
Administrative building, 40,000 m2 of surface.
Expo Zaragoza 2008 (International Exposition) Catalonia Pavilion. 2008.
As Project Technical Architect:
Headquarters and Police Station. 2013. Budget $5.0M.
Public building, 600 m2 of surface.
Restaurant of Jaca Ice Pavilion. 2013. Budget $0.5M.
Public building, 300 m2 of surface.
Laboratories of the University of Zaragoza. 2012-2013. Budget $4.0M.
Three public buildings, 3000 m2 of surface.
Pilar Square – Ancient Roman Wall Surroundings. 2012. Budget $1.0M.
Public square, 6000 m2 of surface.
Study to Carry Out the Construction of the Subway Routes 5 and 6 in Ho Chi Minh City (Vietnam). 2009-2010.
Design and assessment of the subway stations (Inception, Intermediate & Final Reports).
Comparative studies of outlay of the different constructive system.
New Headquarters of the Provincial Court of Zaragoza. 2010. Budget $12.2M.
Public building, 5942 m2 of surface.
Execution project of the Pacification Roads Works of the city of Zaragoza. 2010.
Honors and affiliations
Honors:
Finalist of the XXVI edition of the Architecture Garcia Mercadal Awards for Calatayud Bus Station, 2010.
Prize-winning building with accessibility award of DFA for Rehabilitation of the Old Metropolitan Zaragoza Seminary for
New Municipal Administrative Center, 2008.
Affiliations:
Member of the Spanish Society of Technical Architects and Construction Engineers.
Member of the Spanish Society of Civil Engineers.