Julianne Hanak, LEED AP
**** * ******** *****, ********, AZ 85249 Tel: 602-***-**** E-Mail: abikvf@r.postjobfree.com
EDUCATION
BS - Construction Management, 2004, University of New Mexico, Albuquerque, NM
AA - Construction Management Technology, 2001, Albuquerque Technical Vocational Institute, Albuquerque, New
Mexico
LEED Accredited Professional (New Construction Version 2.2, 2008)
WORK EXPERIENCE:
Chanen Construction Company, Phoenix, AZ 2009-2010
Project Engineer. Job functions included:
Project Engineer: Worked on the Casino Arizona Talking Stick Resort in the Pima-Maricopa Indian Community
$425MM 15 story hotel with a separate Casino and Conference Center. Responsible for and coordinated exterior
systems, which includes glazing, stone, and metal panels; Priced change orders; Reviewed submittals and shop
drawings; Documented project changes with RFIs
The Weitz Company, Phoenix, AZ 2004 – 2009
Estimator and Project Engineer. Job functions included:
Estimator (2007 – 2009): Performed cost estimate takeoffs, solicited bidders, and defined subcontractor scopes;
Estimated competitive and negotiated contracts; Determined estimated quantities and unit costs for budgets;
Coded estimates for the schedule of values
Project Engineer (2004 – 2007): Negotiated subcontract buy out; Prepared subcontracts; Priced change orders;
Conducted MPE 3D coordination meetings; Reviewed submittals and shop drawings; Documented project
changes with RFIs; Prepared and updated the detailed project schedule; Reviewed subcontractor pay
applications
Assigned projects included:
Arizona Health and Technology Building G $12MM shell office building with a dental school tenant
improvement and the Summit at Copper Square $60MM 23 story condo tower in downtown Phoenix
M.A. Mortenson Construction Inc., Albuquerque, NM and Olympia, WA 2003 – 2004
Project Engineer Intern. Job functions included:
Project Engineer Intern: Processed job submittals and RFIs; Managed logs in Expedition; Generated and
scheduled change orders; Estimated field investigations
Assigned projects included:
Sandia National Laboratories $55MM (Albuquerque) and the Washington State Capitol Seismic Upgrade
$120MM (Olympia)
COMPUTER EXPERIENCE:
Winest, Prolog, Expedition, On Screen Takeoff, Suretrack, Microsoft Word, Microsoft Excel, Microsoft Powerpoint, JD
Edwards
Special Qualifications and Achievements
OSHA, 2008; First Aid, 2008; Project Team Leader for University of New Mexico Engineering Team at the 2004
National Engineering Competition, Reno, Nevada