Construction Experience: ** years (****)
As Superintendent, I have been responsible for the following aspects of
projects: safety, schedule, quality and coordination of contractors.
Responsibilities included construction sequencing and communication with
Owner Representatives, Engineers and Architects. In addition, included
review of Contractor contracts, review cost control; maintain weekly labor,
material and equipment reports. Review of shop drawings for general
conformance to the plans and specifications. In addition, coordination and
evaluating all changes in scopes of work to base contracts, preparing and
updating the master job schedule and rolling schedule.
RELEVANT EXPERIENCE
TURNER CONSTRUCTION COMPANY (NOVEMBER 2006 - JULY 2010)
Laguna Honda Hospital Replacement Project, San Francisco, CA (390M) Title;
Superintendent
The Laguna Honda Hospital Replacement project includes the new construction
of three buildings totaling 517,200 sf and associated site work at Laguna
Honda Hospital in San Francisco, CA. The South Residence (5-stories) and
East Residence (7-stories) are Type 1 steel frame skilled nursing
facilities. Both have a cement plaster exterior with punched windows and
storefront entrances. The Link Building is a 4-story, Type 1 steel frame
structure with a curtain wall exterior, houses food service, patient
services and two indoor therapy pools. The New Hospital Site Improvements
(NHSI) package includes landscape, hardscape and site utilities for the new
buildings.
Alexandria Real Estate Equities Parking Structure, San Francisco (25M)
Title; Superintendent
252,167sq. ft. Parking Garage a 6-story Post Tensioned concrete structure,
which houses 823 parking spots, architectural skin is ornamental stainless
steel mesh, architectural louver siding and GREEN screen.
Oakland International Airport Terminal Expansion & Roadways, Oakland, CA
($215M) Title; Superintendent
Expansion and remodeling of the Southwest Airlines terminal and associated
civil work with curbside, surface parking, and roadways at the airport.
Installation of substation and parking control equipment. Significant
accomplishments include successfully maximizing the utilization of local
and small businesses as an economic generator for the entire local
community.
Rudolph & Sletten, Inc. (June 1998 - November 2006)
Kaiser Foundation Health Plan, Inc. - Santa Clara Replacement Facility,
Hospital Phase II, Santa Clara, CA ($157M)
Title; Senior Project Engineer
Phase II includes 416,584 sq. ft 327-bed hospital, a cafeteria, mobile
imaging dock, MRI suites, (3) Cather labs, (2) EP labs, and a main patient
bed tower.
Kaiser Foundation Health Plan, Inc. - Santa Clara Replacement Facility,
Hospital Phase I and Central Utility Plant, Santa Clara ($118 M)
Title; Senior Project Engineer
297,058sq. ft. 327-bed hospital consisting of (6) general, (3) ortho, (2)
cardio-vascular, (6) ambulatory operating rooms, 32-bed emergency
department, 14-bed Clinical Decision Unit, and a central utility plant.
SRI Building T Expansion, Menlo Park, CA ($10M)
Title; Senior Project Engineer
30,500 sq. ft. Building T expansion including new 9,500 sq. ft. office,
17,000 sq. ft. laboratory addition with vivarium and 4,000 sq. ft. tenant
improvement to the existing building. Project also includes the addition of
fire sprinklers and process piping throughout the entire building.
SRI Building T Steam and Chilled Water Installation, Menlo Park, CA ($516K)
Title; Senior Project Engineer
Installation of steam and chilled water underground services to the
Building T expansion project.
SRI Building T Underground Water and Fire Lines, Menlo Park, CA ($422k)
Title; Senior Project Engineer
Installation of 2,000 linear feet of new 10" underground water and fire
lines that tie into existing campus loop and the Building T Expansion
project.
ALZA Corporation - AP-48/AP-58 Capacity Addition, Vacaville ($4M)
Title; Senior Project Engineer
3,500 sq. ft. modifications to existing manufacturing suites, including
remodeling and altering rooms 146, 160, and 1232, within a clean GMP
facility.
Bio-Rad Laboratories Building 6000, New Life Science Laboratory and
Manufacturing Building, Hercules ($25M) Title; Senior Project Engineer
143,000sq. ft. new construction of a 2-story manufacturing building on the
Bio-Rad Hercules campus, which consisted of laboratories, offices, and
meeting rooms.
Bio-Rad Laboratories - Building 825, Suite F, Hercules (330K)
Title; Senior Project Engineer
Tenant improvements including ceiling, flooring, painting, and electrical
work for call center
Pacific Shores Center, Redwood City (318M) Title; Senior Project
Engineer/Asst.Superintendent
1,700,000sq. ft. construction of 11 steel-framed office/R&D buildings of
93,000 - 280,000sq. ft. each, one wood frame building, and one block
building. Class A construction, with GFRC panels and glass curtain walls.
Also included construction of a separate fitness center, Olympic size
swimming pool, recreation fields and athletic courts and 170,000sq. ft. of
retail space and foodservices. The 106-acre campus that houses BroadVision,
OpenWave, Informatica, Nuance, DreamWorks, ArQule, E2Open, Nextance,
Symantec, and Harris my CFO. 11 ea. building shells, infrastructure, site
work, extension of Seaport Boulevard to site (self-perform concrete).
AboveNet Communications, Inc. - Internet Service Exchange Facility ISX-
SJ3,San Jose,($62M) Title; Project Engineer
111,544 sq. ft complete remodel and structural upgrade of an existing
single story building for construction of co-location data center rooms.
AboveNet Communications, Inc. - Internet Service Exchange Facility ISX-SJ2,
SanJose ($52M) Title; Project Engineer
238,600sq. ft. demolition of interior structure and tenant improvements of
the existing San Jose Retail Pavilion, while maintaining remaining
perimeter tenants for the construction of a new shell and tenant
improvements consisting of a data center and office support.
Retail Pavilion Shell Only Renovations, San Jose (25.6M)
Title; Project Engineer
26,300sq. ft. addition to the south end of the Retail Pavilion in downtown
San Jose, consisting of a 2-story structure with a glass window wall
facade.
Shaklee Corporation World Headquarters Hacienda Campus, Pleasanton ($25.6M)
Title; Project Engineer
130,000sq. ft. new Shaklee Corporate Headquarters on a 29-acre site with a
3-story, 105,000sq. ft. office building, 20,000sq. ft., 2-story
conference/learning center, and site development. This is a "green"
design/construction project with extensive use of recycled and sustainable
materials and has an energy efficient design.
$25,600,000/completed 10/28/1999
JDS Uniphase Corporation - Campus Renovation Phases 1 & 2, San Jose ($13M)
Title; Project Engineer
180,000sq. ft. renovations of existing Buildings 1865, 1875, and 1885.
Stanford University, DPM - Cowell Cluster, Stanford ($7M)
Title; Project Engineer
60,000sq. ft. renovation of five student-housing units at Stanford.
Education
BACHELOR OF SCIENCE DEGREE, CONSTRUCTION MANAGEMENT, ARIZONA STATE
UNIVERSITY, (1998)
Micihgan State University 82' - 85'
Past Employment History
National Football League: Oakland Raiders 92'; Detroit Lions 91'; Phoenix
Cardinals 86' - 90'
certification
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION 30-HOUR TRAINING (2008)
REFERENCES (AS OF DATE)
NAME MR. PETE BOHLEY, PRINCIPAL
Company Bohley Consulting
Address
City, State, Zip San Mateo, CA
Phone 650-***-****
Fax
Name Mr. Kevin Hester, Principal
Company McGuire Hester
Address
City, State, Zip Oakland, CA
Phone 510-***-****
Fax
Name Mr. Jon Cimperman
Company Port of Oakland
Address
City, State, Zip Oakland, CA
Phone 510-***-****
Fax
Name Mr. George Bridges, Senior Contract Compliance Specialist
Company San Francisco Redevelopment Agency
Address
City, State, Zip San Francisco, CA 94103
Phone 415-***-****
Fax 415-***-****
Name Mr. James Kennedy, Licensed OSHPD Inspector
Company City of San Francisco
Address
City, State, Zip San Francisco, CA 94103
Phone 415-***-****
Fax
Email abiku6@r.postjobfree.com
Name Mr. Jack Adams, Senior Superintendent
Company Turner Construction Company
Address 1625 Clay Street
City, State, Zip Oakland, CA
Phone 415-***-****
Fax
Email abiku6@r.postjobfree.com
ANTHONY BELL, SUPERINTENDENT
Anthony bell (Superintendent)
CELL: 408-***-****
EMAIL: abiku6@r.postjobfree.com
ADDRESS: 204 ELDERBERRY COURT, HERCULES, CA 94547
SUPERINTENDENT