[pic]
Phone No : +639*********
Email : ********@*****.***
Blk 30 Lot 132 Phase 11 Area 1-D
Dagatan Navotas
Metro Manila, Philippines
HAROLD L. LONTOC
1. Job References :
Job Description as MILLWRIGHT
. Repair and overhaul of the following equipment pumps, valves,
fans blowers and compressors. Steam/gas turbine,
reciprocating. Also installation and alignment of the said
equipment.
. Assist in the inspection/change-out/repair of critical
equipment.
. Carry out other related mechanical works required in
coordination with other maintenance skills to maintain
equipment in good running condition as requested by the
immediate superior.
Company : GE MEELSA SERVICE CENTER (ENERGY SYSTEM)
DAMMAM K.S.A
Length of Service : Dec 2005 - Present
MILLWRIGHT
. Dismantling parallel shaft gear drive for gas turbine
generator frame 7
. Repair and alignment blower fan, mechanical inspection
vertical and horizontal induction motor.
. Re-blaiding compressor wheel, NDT, incoming inspection.
. Assembly bucket turbine wheel
. Assist run - out and dynamic balancing gas and steam turbine
rotor.
. Momentum weight, base and top coating compressor wheel.
. Replace blade and shroud, MPI, steam turbine rotor.
. Assist repair combustion can shroud block, diaphragm
transmission piece.
Company : ARAMCO REFINARY
Rastanura K.S.A
Length of Service : Sept. 2004 - Dec. 2005
MILLWRIGHT
. Preventive maintenance centrifugal pump and steam turbine pin
fan coaling system.
. Repacking gate valve lubricate thread and hand wheel crude
oil line.
. Change - out heat exchanger.
. Gas cutting base pad pipe line flare header
. Replace pillow block bearing damper blade furnace.
Company : GAZLAN POWER PLANT
(400 MW Ph-1 & 625 MW Ph-2)
Length of Service : Dec 2003 - Aug 2004
MILLWRIGHT
. Assist to the senior mechanical technician.
. Conduct repair and trouble shooting mechanical equipments.
. Accomplish every work order given by the Admin (Mechanical
jobs).
. Repair and change - out different valves.
. Pull - out replace boiler circulation pump.
. Remove unbalanced fan of Ignitor Booster Fan for balancing,
leak and vibration.
. Take out the reduction gear box for overhauling and change
oil the seal and bearings in the air heater.
Company : QURAYYAH POWER PLANT
Qurayyah K.S.A
Length of Service : Nov 2002 - Dec 2003
MILLWRIGHT
. Repair of boiler tubes leaks and to assist the welder to
identify leaks to be welded.
. Change - out and installation of mechanical seal in the
Turbine Booster Feed Pump.
. Dismantling and change - out gland seal of gas re -
circulation fan.
. Pressure test in the seal water cooler of main air Extraction
vacuum Pump.
. Done a measuring device dial indicator, micrometer piller
gauge, telescopic gauge, vernier caliper, height gauge and
bore gauge.
. Alignment and close the cover of manhole in the forced draft
fan.
. Dismantling and installation of motor driven boiler feed
pump.
. Overhauling and general service of air compressors.
. Changing of gear box and bans screen inn the intake area.
. Lubrication on the turning gear coupling at the steam turbine
generator.
. Box up oil strainer on the fuel oil pump.
Company : NATIONAL TITANIUM DIOXIOXIDE
(Cristal) Company Ltd.
Yanbu K.S.A
Length of Service : May 1995 - May 1999
PLANT MECHANIC/MILLWRIGHT
. Change - out micronizer for repair in workshop.
. Installation and dismantling of lube pump.
. Work in the bucket conveyor to replace roller chain.
. Pull out the oxidizer for inspection and pressure test.
. Remove the cross over spool in the chloronator to change the
bricks inside the pipe.
. Replace the bearing in the cooling tower.
. Repair the rotating plate roller conveyor and arms on the
Palletizer area.
. Move out the oil separator in the water treatment reverse
osmosis plant.
. Repacking mixer box of lime and brick storage tank.
. Pull out nash compressor to modify gland packing to
mechanical seat.
. Take out screw feeder for replacement.
2. Other Skills : Computer literate, Valid Saudi and Philippine
Driving License Forklift operator.
3. Educational Attainment :
Degree : Associate in Marine Engineering
University : Philippine Maritime Institute (PMI)
Quezon City, Philippines
4. Personal Information :
Name : Harold L.Lontoc
Date of Birth : 13th December, 1972
Civil Status : Married
Citizenship : Filipino
Religion : Roman Catholic
Height : 5"6"
Weight : 148 lbs
Name of Wife : Melba A. Lontoc
No. of Children : Two
Contact No : +639********* & +966*********
[pic]