Job Description as MILLWRIGHT

. Repair and overhaul of the following equipment pumps, valves,

fans blowers and compressors. Steam/gas turbine,

reciprocating. Also installation and alignment of the said

equipment.

. Assist in the inspection/change-out/repair of critical

equipment.

. Carry out other related mechanical works required in

coordination with other maintenance skills to maintain

equipment in good running condition as requested by the

immediate superior.

Company : GE MEELSA SERVICE CENTER (ENERGY SYSTEM)

DAMMAM K.S.A

Length of Service : Dec 2005 - Present

MILLWRIGHT

. Dismantling parallel shaft gear drive for gas turbine

generator frame 7

. Repair and alignment blower fan, mechanical inspection

vertical and horizontal induction motor.

. Re-blaiding compressor wheel, NDT, incoming inspection.

. Assembly bucket turbine wheel

. Assist run - out and dynamic balancing gas and steam turbine

rotor.

. Momentum weight, base and top coating compressor wheel.

. Replace blade and shroud, MPI, steam turbine rotor.

. Assist repair combustion can shroud block, diaphragm

transmission piece.

Company : ARAMCO REFINARY

Rastanura K.S.A

Length of Service : Sept. 2004 - Dec. 2005

MILLWRIGHT

. Preventive maintenance centrifugal pump and steam turbine pin

fan coaling system.

. Repacking gate valve lubricate thread and hand wheel crude

oil line.

. Change - out heat exchanger.

. Gas cutting base pad pipe line flare header

. Replace pillow block bearing damper blade furnace.

Company : GAZLAN POWER PLANT

(400 MW Ph-1 & 625 MW Ph-2)

Length of Service : Dec 2003 - Aug 2004

MILLWRIGHT

. Assist to the senior mechanical technician.

. Conduct repair and trouble shooting mechanical equipments.

. Accomplish every work order given by the Admin (Mechanical

jobs).

. Repair and change - out different valves.

. Pull - out replace boiler circulation pump.

. Remove unbalanced fan of Ignitor Booster Fan for balancing,

leak and vibration.

. Take out the reduction gear box for overhauling and change

oil the seal and bearings in the air heater.

Company : QURAYYAH POWER PLANT

Qurayyah K.S.A

Length of Service : Nov 2002 - Dec 2003

MILLWRIGHT

. Repair of boiler tubes leaks and to assist the welder to

identify leaks to be welded.

. Change - out and installation of mechanical seal in the

Turbine Booster Feed Pump.

. Dismantling and change - out gland seal of gas re -

circulation fan.

. Pressure test in the seal water cooler of main air Extraction

vacuum Pump.

. Done a measuring device dial indicator, micrometer piller

gauge, telescopic gauge, vernier caliper, height gauge and

bore gauge.

. Alignment and close the cover of manhole in the forced draft

fan.

. Dismantling and installation of motor driven boiler feed

pump.

. Overhauling and general service of air compressors.

. Changing of gear box and bans screen inn the intake area.

. Lubrication on the turning gear coupling at the steam turbine

generator.

. Box up oil strainer on the fuel oil pump.

Company : NATIONAL TITANIUM DIOXIOXIDE

(Cristal) Company Ltd.

Yanbu K.S.A

Length of Service : May 1995 - May 1999

PLANT MECHANIC/MILLWRIGHT

. Change - out micronizer for repair in workshop.

. Installation and dismantling of lube pump.

. Work in the bucket conveyor to replace roller chain.

. Pull out the oxidizer for inspection and pressure test.

. Remove the cross over spool in the chloronator to change the

bricks inside the pipe.

. Replace the bearing in the cooling tower.

. Repair the rotating plate roller conveyor and arms on the

Palletizer area.

. Move out the oil separator in the water treatment reverse

osmosis plant.

. Repacking mixer box of lime and brick storage tank.

. Pull out nash compressor to modify gland packing to

mechanical seat.

. Take out screw feeder for replacement.

2. Other Skills : Computer literate, Valid Saudi and Philippine

Driving License Forklift operator.

3. Educational Attainment :

Degree : Associate in Marine Engineering

University : Philippine Maritime Institute (PMI)

Quezon City, Philippines

4. Personal Information :

Name : Harold L.Lontoc

Date of Birth : 13th December, 1972

Civil Status : Married

Citizenship : Filipino

Religion : Roman Catholic

Height : 5"6"

Weight : 148 lbs

Name of Wife : Melba A. Lontoc

No. of Children : Two

Contact No : +639********* & +966*********

[pic]



Contact this candidate