Hani Habib

**** ***** ***** ** #*** Phone: 813-***-****

Wesley Chapel, FL 33544 E-mail: *************@*******.***

EDUCATION:

BS in Civil Engineering, Benha University, Egypt 1993

Attendance CPM course in the American University, Cairo, Egypt,

2007

Evaluation the Bachelor of Science in Civil Engineering according to:

Highest Academic Equivalency Recommended In the United States 2009

Enrolled in the graduate program for master degree in the Civil Engineering

University of south Florida.

PROFESSIONAL EXPERIENCE:

Barrier wall Specialist, Trevicos-Soletanche JV, Jamestown, KY Feb.2010

till now

. Managed the construction of various types of civil works of WOLF CREEK

Dam.

. Enforce Quality Control Plan.

. Ensure adequate corrective measures are implemented in cases of non

compliance.

. Ensure all site activities are performed in accordance with the project

and client safety programs.

. Provide administrative and technical direction to all quality control

personnel.

. Collecting and reviewing all information/data from the field on a daily

basis.

. Ultimately responsible for the final decision on concrete placement.

Construction Manager, Mina Construction Company, Egypt Jan. 2005 -

May2009

. Managed the construction of various types of civil and building projects

for Gabal el Zaytoun Resort, Saint Mary church at Shoubra, Service

Building at Saint George at Heliopolis. Active participation throughout

the construction life of the project; study plans, prepare bids,

coordinate several trades and sub-contractors, prepare and mange project

schedules and critical path method (CPM), hold regular meetings with

client, architect and engineering (A&E) firms to address project issues,

prepare request for information (RFI's), issue contract change orders

(CCO's), prepare monthly progress reports and invoicing, maintain project

documents and as-builts.

. Managed construction crew of more than 80 labors and coordinated all

construction activities. Resource leveling of construction crews of many

trades and construction equipment assigned to 4 on going projects at a

time. Prepare budget analysis and manage cash flow on all my projects;

review and approve sub-contractor's invoicing, equipment renting, and the

bi-weekly payroll of all personal assigned to my projects. Hold sub-

contractors accountable to mutually agreed upon schedule, resources and

deliverables.

Construction Manager, Sefi Fontec Jan. 2004 - Dec. 2004

. Managed the design and construction of Dar El-kottob project that

includes 2 mid-size concrete and steel buildings, parking lot, side

walks, drainage system and landscape. This project stands as a landmark

in my career as I efficiently completed the project on schedule, on

budget and with an outstanding quality. I managed a team of 30 design

and construction engineers to the construction documents and obtain the

approval from the building officials.

. Works include : Diaphragm Wall, Anchors, Micro piles, Grouting, Struts,

Dewatering,Excavations, concrete works.

. Project Cost 30million $

Construction Manager, Soletanche Bachy, Lebanon, Jordan, Egypt Jan.

1997 - Nov. 2003

. I managed many projects includes; Ain El Delbe Curtain Wall, Lebanon,

Tannur Dam, Jordan, Wadi El Gedid Airport, Egypt, El Lahoun Power Plant,

Egypt, Saraya El Hadayek Mall, Egypt, Arab Bank, Cairo.

. Responsible for project delivery throughout various phases of the

projects. Duties included resolve issues of project scope, cost, schedule

and resources. Coordinate design with clients, architects and other

engineering disciplines.

. Conduct initial site assessment, take measurements & photographs, to

identify potential hazardous sources and make recommendations. Prepare a

health and safety plan for each project, work with health and safety

officers to ensure the implementation of all safety measures.

. Conduct technical studies, write reports and prepare specifications for

different aspects of projects. Design retaining walls and check slope

stability. Calculate immediate settlement and consolidation.

. Duties included prepare contract writing; list contract scope of services

(standards, special provisions, quality control, safety measures, etc.),

list the work items that the consultant/subcontractor will be required to

perform, prepare materials to be furnished (manuals, mapping, reports,

data, correspondence, etc.).

. Works include: Diaphragm Wall, Barrettes, Anchors, Micro piles, Grouting,

Struts, Dewatering, Excavations, concrete works, and Micro tunnels.

. Projects cost 40 million$

Project Engineer, Soletanche Bachy, Egypt Jan. 1994 - Dec. 1996

. Working in Greater Cairo Metro Phase 2

. Responsible for the construction support of many project, duties

included; respond to RFI's, conduct structural observations to ensure

compliance with contract documents, review and approve progress reports,

review and approve shop drawings and material takeoff.

. Works include: Diaphragm Wall, Barrettes, Anchors, Micro piles, Grouting,

Struts, Dewatering,Excavations, concrete works, Micro tunnels.

. Project cost 50million $

SKILLS SUMMARY:

. Proficient in Microsoft Office applications including Excel, Word and

Power Point.

. Excellent user for AutoCAD, Cad programs, primavera.

. Strong organizational and time management skills.

. Excellent verbal and written communication skills.

. Supervision and management skills

. Strong analytical abilities.

. Fluent French.