M.SELLAPPAN
Dickinson. *7539
Contact telephone number 281-***-****
Objective
To excel in a position as a Facilities Manager. Continuously update my
skills with the latest technology and become a leader in my scope of work.
Summary of Qualifications
Software
. Microsoft Office
Skills
. Ultra pure water
. Waste water treatment
. Electrical
. Clean room systems operation, maintenance and construction
. Exhaust systems
. Process cooling water
. Gas distribution
. Compressed dry air systems
. Vacuum systems
. HVAC
Languages
. Fluent in English, Tamil, and Bahasa Malaysia
Work Experience
1988 to 2009 - Worked and retired in Motorola/On Semiconductor as a
Facitlities Operations Manager responsible for 2 sites with a total
headcount of 3000 employees. I had 35 staff reporting to me. Total of 22
years work experience in this company.
1985 to 1988 - Worked in the United Asian Bank Building as a Property
manager responsible for maintenance of the whole building with 600
employees. I had 8 staff reporting to me.
1982 to 1985 - Worked in a Palm Oil Processing Factory as a Maintenance
Foreman responsible for maintenance of the factory with 80 employees. I had
3 staff reporting to me.
1979 to 1982 - Worked in Lever Brothers as a maintenance technician
responsible for maintenance of the factory in terms of electrical and
mechanical systems.
Work Responsibility in Motorola/On Semiconductor. Seremban, Malaysia
(February 1988 - Present)
ON Semi conductor (formerly known as Motorola Semiconductor) was the first
Wafer Fab in Malaysia making wafers for small signal products. Migrated
from the original 4" to 6" and currently moving to 8" in some areas.
Overall responsibility for the following support areas and equipment in ON
Semiconductor, Seremban Malayisa.
. High Voltage Distribution systems, Low Voltage distribution systems 15
MW load.
. Deionized water plant capacity 500 GPM at 17 mega ohms.
. Waste water treatment plant 600 GPM.
. Clean room air conditioning for class 100 with an area of 80,000 sq ft.
. Vacuum pumps capacity of 7000 cubic feet per minute.
. Gas distribution comprising of Liquid Nitrogen, Liquid Oxygen, Liquid
Argon, Hydrogen c/w vaporizers and filter skids.
. Exhaust systems comprising of Acid, Solvent, Ammonia, Heat and General
exhaust, with a total capacity of 150,000 cubic ft per minute.
. Telephone systems and PABX with 300 extensions.
. Fire protection system comprising of sprinklers, smoke and heat
detectors, Hydrants, Hose reels, smoke spill systems, alarm panel, fire
pumps and generators.
. Burglar alarms and closed circuit TV
. Process cooling water at 18 deg C with a capacity of 600 gpm.
. Mechanical and Electrical maintenance, Building maintenance, Landscaping
and Housekeeping.
. Responsible for the direct reports comprising of engineers and
technicians and their daily activities.
. Liaise with production personnel to plan layouts.
. Facilitisation of new equipment.
. Relocation of existing equipment.
. Prepare project schedule for each of these projects.
. Liaise with consultants for large upgrading projects.
. Design and upgrade ageing facilities systems.
. Liaise with local authorities for constant supply of electricity and
water.
. Train and educate personnel under his charge for better and efficient
work performance.
. Plan and execute routine servicing of facilities equipment to be carried
out by service contractors.
. Implement cost saving projects in areas of electricity water and gas
usage.
. Implement cost saving projects in routine maintenance.
. Prepare SAR and capital fund request for new projects.
. Prepare yearly budget and department cost allocation.
. Ensure utility supply to production meets all specifications.
. Insurance audits (FM Global)
. Safety issues, contractor safety and EHS audits.
. Assisted in construction projects in China comprising of Assembly Test
sites
for semiconductor manufacturing comprising of 120,000 sq ft of class
10,000 sq ft clean room and associated facilities equipment. Trained all
personnel in China with regards to Facilities management systems.
Technical Qualifications
1987 -- Chargemen Nil restrictions B4 33,000 volts - Competent control
certificate.
1992 -- City and Guilds full cert in Advanced Electrical Technology,
Transmission and generation of Power
2004 -- Certified Energy Manager
PROJECTS COMPLETED
1985 - Construction of 25 storey building for United Asian Bank in Kuala
Lumpur.
1988- Construction of Wafer Fab and Assembly test facility for Motorola in
Seremban.
1991- Construction of Assembly test facility for Motorola in Leshan,
China.
1994 - Construction of assembly test facility for Motorola in Seremban .
1996 - Extension of Wafer Fab for Motorola in Seremban.
1998 - 2nd phase of Extension for Wafer Fab, Motorola Seremban.
2001 - Extension of Wafer Fab from 20000 sq ft to 30000 sq ft for On
Semiconductor.
2003 - Construction of class 100 clean room, civil works only in Leshan
China for ON Semiconductor.
2004 - Construction of Sewage treatment facility for ON Semi Seremban.
2008 - Construction of additional 50,000 sq ft of class 100 clean room in
Seremban.
2009 - Completed various cost-saving projects in Motorola and On
Semiconductor.
Details of cost saving projects completed.
1. Installation of capacitors for large motors to improve power factor
correction.
2. Installation of frequency drives for under utilized motors.
3. Replacement of old equipment to new energy efficient type.
4. Replacement of light bulbs to energy efficient type.
5. Waste water recycling systems to reduce water consumption.
6. Redistribution of compressed dry air pipes to reduce the number of
compressors in use.
7. Redistribution of vacuum pipes to reduce the number of vacuum pumps.
8. Replace conventional starters for motors with electronic type to reduce
wear and tear.
9. Fix all leaks and develop a continuous improvement program to reduce gas
and air leaks.
10. Replace compressed dry air dryers from -70 deg C to +5 deg C thus
reducing compressor load by 20%.
11. Replace desiccant purge dryers to refrigerant zero purge dryers.
12. Carry out small maintenance jobs with in house technicians instead of
hiring contractors.
13. Installation of flow control valves during idle position for wet etch
hoods to prevent over usage of deionized water.
14. Installation of flow control valves for Nitrogen and air to prevent
over usage.
15. Installation of DYSC voltage sag correctors for critical equipment to
prevent down time.
16. Installation Uninterrupted Power Supply for critical equipment to
prevent down time.
1 References Available Upon Request