Joseph R. Harvey
**** ** ***. #* **** Beach, FL *2960 949-***-**** abid1c@r.postjobfree.com
th
project controls engineer / on site Project Scheduler
Project Controls engineer with 10 years of experience in calibration/repair of electrical and mechanical equipment, structural field
engineer for an $80 million Ozone retrofit project, scheduling engineer for construction jobs totaling over $500 million, contract and
delay dispute resolution, finance and cost controls management.
Key Skills
3 to 8 Man Crew Management Fluent in Microsoft Excel Scheduling Primavera P3.1/P6
E&I Calibration/Repair Expertise Budgeting & Cost Controls Bidding/Estimating/Proposals
HRSG/STG Experience Toolbox Safety Leadership Schedule Impact analysis
Employer Summary
Anytime fitness OF fort pierce. (Fort Pierce, FL) Owner, 2009 to Current
Started up and funded an 8,000 sq ft 24 hour fitness facility with personal trainers, including permitting, bonding and insuring.
• HAD THE VISION TO SEE THE POTENTIAL FOR AN OLD BANK BUILDING TO BE REPURPOSED INTO A FITNESS
FACILITY AND THE DRIVE TO MAKE IT HAPPEN.
• AT THE CURRENT RATE OF MEMBERSHIP GROWTH, PROFITABILITY WILL BE REACHED BY THE END OF 2011.
ARB, Inc. (Lake Forest, CA) Project Controls Engineer, 2005 to 2008
Company scheduler and cost controls engineer for numerous projects simultaneously, including parking structures, delay ridden
HVAC duct banks in San Francisco, and water treatment facilities.
• Recovered $4MM in schedule delays and damages from the $30MM Oxnard water treatment facility.
• Worked with archeologists to mitigate the mammoth sized delays when excavating the underground parking structure at
the La Brea Tar Pits.
• Scheduled and assisted in the Flying J Refinery’s 3 week outage to expand and install new tubes, emission scrubbers and
insulation in the steam generators to provide a 40% increase in efficiency.
Kiewit pacific co. (Santa Fe Springs, CA) Field/Scheduling Engineer/Superintendent, 2002 to 2005
Field Engineer assisting a Civil Superintendent with:
• Form work calculations
• Work plan design
• Crew performance tracking
Scheduling engineer assisting multiple projects ranging from water treatment facilities to COGEN power plants.
• Tracked project cost and production performance.
• Calculated and billed for earned progress.
Project engineer managing costs and the subcontractor contracts at OC 88 water pump relay station.
Superintendent at Hollywood reservoir water treatment facility.
United states navy (USS John C. Stennis) Aviation Electronics Technician 2nd Class, 1998 to 2002
Provided calibration and repair of mechanical and electrical devices including wave form generators, accelerometers, fuel cells,
pressure gauges and other miscellaneous testing equipment.
• Completed my service having earned the rank of E5 in the shortest time permitted.
• Awarded the Navy and Marine Corp Achievement Medal.
Education & Certifications
PEPPERDINE UNIVERSITY (Malibu, CA) MBA in Finance, 2008
UNIVERSITY OF LA VERNE (La Verne, CA) BS in Mathematics, 2005
U.S. NAVY Aviation Electronics Technician – Repair and Calibration, 1999