Jeffrey Michael Williford
? **** Five Oaks Court ? Arnold, Mo. ? Cell 847-***-**** ?
*******.*********@**.******.*** or **************@*****.***
Nestl Continuous Excellence / TPM / Maintenance
Highly-focused, innovative maintenance and operations leader with extensive
experience in a fast-paced manufacturing environment. Proven ability to
manage all phases of maintenance / manufacturing including Safety, Quality,
Cost, Delivery, and Morale. Expertise in revitalizing organizational
performance via cutting-edge strategic maintenance planning and business
development plans in operations. Skilled at planning maintenance activities
and troubleshooting equipment while minimizing plant down time. Recognized
as an energetic leader, strong team motivator, excellent communicator with
superior business acumen. 20+ years of experience in managing at all levels
in a production environment.
. Change Management / Strategic Planning
. TPM
. Lean Manufacturing
. Business Plan Development
. Training
. Safety / OSHA Regulations
. AM / PM / FI / ET Pillar Leader
. Performance Metrics Definition
. Continuous Improvement
. Six Sigma Green Belt
PROFESSIONAL EXPERIENCE
Nestle USA - Confections & Snacks, Franklin Park, IL ? 10/2009 - Present
NCE / TPM Manager for Confections and Snacks Division
The NCE Manager reports to the NCE Director in Glendale, Ca and is a member
of the Division leadership team. The NCE manager coordinates the NCE
implementation in the plants and is the overall leader of NCE
implementation, with the NCE manager as the executional leader, the right
hand person of the plant managers/director. Areas of responsibilities
include:
. Responsible for Franklin Park, Itasca, Burlington, and Bloomington
Plants
. Oversee all NCE activities with responsibility of AM, PM, FI, and
ET Pillars
. Coordinate the development of the NCE preparation phase plan, track
progress against the plan and lead issue resolution (Gap analysis
and adjustments to plan).
. Coordinate the development of the NCE master plan and oversee
progress and issue resolution against the master plan.
. Implement appropriate reviews (monthly, quarterly) to review both
pillars and departments progress in their NCE plans.
. Participate in pillar meetings, department reviews and small group
activities to ensure that work is properly integrated and that
progress is on track.
. Ensure that NCE work is impacting both results and the culture
change towards the vision as determined by the plant zero loss
journey, vision. including:
- Total employee involvement
- Linkages of individual and team activities to losses and the
business need
. Lead the Promotion Campaign for NCE:
- Keep the organization energized to move through the NCE
Journey
- Set up mini celebrations of successes (passing steps,
success case studies, competition: Best OPL (One
point lesson), best improvement each month, lines exceeding a true
efficiency level)
- Publish NCE newsletters, OPL
. Integration of pillar work:
- Develop an overall understanding of the different NCE
pillars and how they integrate through the NCE
master plan to deliver the improved results.
- Coach department and pillar leaders on this integration
- Develop a thorough understanding of the NCE efficiency
basics and their integration to deliver
increased efficiency results early in the NCE
implementation including the following systems:
. True efficiency tree (planned, unplanned)
. Centerline / Change over systems
. Maintenance basics (PM's work orders, Scheduled
Maintenance, Breakdown elimination)
. Downtime tracking, analysis and review processes (Daily,
weekly and monthly reviews)
. Leadership role and structure to focus on true
efficiency.
. Focused improvement system
. Ensure effective consultant guidance:
. NCE General Education:
- Ensure coordination of NCE education across the site:
. Leadership education: (benchmark trips, pillar leaders training the
leadership team, hands on workshops, leadership models)
- Plant general education at different levels
. Lead specific NCE activities depending on the plants' needs.
Examples:
- Lead 5S activities
- Lead the establishment of master planning process, review
process
. Key Deliverables:
- Plants are progressing with NCE activities per the plants'
master plan,
- Plants are delivering the results improvements targeted by
the plants' master plan.
The Western Sugar Cooperative, Scottsbluff, Nebraska ? 7/2009 - 11/2009
In December 2002, over 1,000 sugar beet growers in Colorado, Nebraska,
Wyoming and Montana united to form The Western Sugar Cooperative, believing
that the future of the sugar beet industry in this area would be well-
served by grower ownership of the company. With company headquarters in
Denver, Colorado, Western Sugar currently operates sugar-processing plants
at Scottsbluff, Nebraska; Lovell and Torrington, Wyoming; Billings,
Montana; and Fort Morgan, Colorado. Storage facilities are located at
Greeley, Rocky Ford, Sterling and Longmont, Colorado; and at Gering and
Mitchell, Nebraska.
Maintenance / TPM Manager
. Define all Planned Maintenance best practices and own key methodology
to change to a zero loss culture.
. Provide leadership & coaching for PM specialists necessary to drive
rapid results through break-down elimination, the 6 steps of planned
maintenance, support of AM, reapplication of proven technical
solutions, resolution of chronic failures, and system approaches to
plant infrastructure: compressed air, water, electrical, &
lubrication.
. Develop COE's in all of the component categories: fasteners,
pneumatics, drives, hydraulics, electrical, etc.
. Instrumental in implementing systems to drive / sustain 95% processing
performance of Tmax.
. Ensure effective documentation & system ownership for all standard
practices in Planned Maintenance.
. Management of CMMS to assure coordination of all aspects of
preventive, corrective and planned maintenance scheduling. Experienced
in SAP / ALM.
. Development of facility maintenance planning, scheduling and work
execution to achieve the highest level of plant productivity and
minimal mechanical downtime.
. Budget development, management and operational control of departmental
activities to provide on budget and on schedule departmental
performance.
. Maintaining health and safety standards within the department. Active
involvement in the plant safety and quality effort and the assurance
of all plant safety, housekeeping, regulatory and personnel policies
within the assigned area.
. Optimization of maintenance systems including: TQM, CMMS, TLC, MI, PM
and complex maintenance scheduling, planning and execution for optimum
equipment reliability and on time plant availability.
. Management and utilization of PdM (predictive maintenance, i.e.;
vibration analysis, IR surveys, Oil analysis, etc.)
MillerCoors Brewing Company, Irwindale, California ? 3/2007 - 7/2009
Irwindale Brewery, one of nine breweries for MillerCoors has more than 600
employees and a payroll of more than $58 million in total wages, salaries
and fringe benefits.
. Nearly 20 years experience as professional manager.
. Ability to direct complex projects from concept to fully operational
status.
. Goal-oriented individual with strong leadership capabilities.
. Organized, highly motivated, and detail-directed problem solver.
. Proven ability to work in unison with staff, line operators and
vendors.
Packaging Maintenance Manager / PM Pillar
. Manage all daily maintenance activities to ensure smooth production
operation.
. Support Safety, Quality, Delivery, Cost and Morale of Packaging
Department.
. Experienced in high speed packaging equipment predictive,
preventative, and reactive maintenance
o KHS Fillers
o Palletizers
o Conveyors
o Jones / Douglas Packers
o De-Palletizers
o Motors / Gearboxes
o Wrappers
o Krones Labelers
o Pasteurizers
Key Accomplishments
. Increased MA% on lines from 71% to 80.6% and OEE from 65.6% to 75.7%
. Led implementation of 17 innovations in 2008 saving the brewery over
$2.3M.
. Zero Safety incidents under my supervision in Maintenance with Zero
Tolerance Policy
. Implemented overtime tracking database to equalize hours and promote
cross-training of mechanics
. Appointed 5S champion for Packaging and was the benchmark area after
only 6 months stressing:
Continuous Improvement Ownership Sustainment
. Promoted 1 grade band after 1 year of service during merger with
Coors.
Chrysler, LLC, Fenton, Missouri ? 07/26/1993 - 3/2007
An independent automaker for over 80 years, employing over 100,000 people
in 14 assembly plants and 11 power train plants.
. Successfully established SMART (Lean) Manufacturing program for
DaimlerChrysler
. Successfully managed Safety program in Assembly and reduced OSHA
recordables by 50%
. Managed turnaround of maintenance program by implementing TPM /
Increased OEE 30%
. Formulated, wrote, and implemented new employee orientation manuals.
. Successfully designed and installed 7 grinding / cutting lines at
McGraw Glass over 12 months
Lean Manufacturing Manager / TPM / Maintenance Manager
. Was named National Trainer for Lean - Wrote all handbooks, SWIs, and
tools for training Lean / TPM, and Small Team Concept
. Successfully implemented small team concept and Lean Manufacturing
concepts for DaimlerChrysler
. Increased efficiency while reducing manpower through balanced line
flow / workstation optimization
. Safety and Business Plan Champion
. LED TPM and WCM efforts to increase OEE on model lines while also
improving MTBF by 57%
Production Area Manager / Process Reliability Manager
. Responsible for daily leadership of Trim Department team leaders and
operators
. Ensured daily production numbers were met
. Responsible for SQDCM metrics
Product Quality Improvement Manager
. Led staff of 13 hourly, high seniority employees who championed
product quality
. Led training of all plant employees in areas of Safety, Quality, 5S,
Lean, and Kaizen workshops
. Member of Chrysler National Training Team / Presented at National
Convention
. Led Train the Trainer classes
Production Supervisor
. Daily direct line supervision of 30+ employees in various departments
. Responsible for all areas of production to ensure targets were met
. Continuous Improvement Champion
Journeyman Millwright
. Troubleshoot, repair, and PM all plant mechanical equipment
. Fabricate tooling
. Weld / Burn
. Innovate
** Reason for leaving - 8 Plant Closings and Mid-Management buy-outs at
affected plants **
EDUCATION
MBA Studies
University of Phoenix Online
? 2007 - Present
Bachelor of Science - Industrial Management Baker College,
Detroit, Michigan ? 2003
Associate of Science - Industrial Technology Baker College,
Detroit, Michigan ? 2001
Journeyman Millwright Chrysler
LLC Apprenticeship ? 1994
U.S. Naval Nuclear Power Program Orlando, Florida ?
1983 - 1989
USS - 711 Submarine Qualified
TECHNICAL SKILLS
MS Office Suite Expert, Journeyman Millwright / Welder (Mig, Tig, Arc),
Green Belt (Chrysler Certification), MS Project, Maximo, Lotus Notes,
Visio, MS Access, EIT Efficiency Improvement Tool, Web Page Development,
Condition-Based Monitoring, Laser Alignment, Vibration Analysis, and
Minitab