Post Job Free
Sign in

Project Manager Engineer

Location:
Fishers, IN, 46038
Posted:
September 21, 2010

Contact this candidate

Resume:

Dennis Fitzgerald, P.E.

***** *********** **. *****

Number 317-***-****

Fishers, IN. 46038 Cell Number

317-***-****

E-mail ********@*******.***

Objective

To obtain a position as a Project Engineer for an engineering

consulting firm.

Summary of Qualifications

. 24 years experience in designing rural and urban highway in the

State of Indiana.

. Software experience in Land Desktop, AutoCAD, Highway capacity

software, and HY8 and other engineering software packages.

. Managed the development of state projects for the state of

Indiana.

. Developed proposals and costs estimates for State, City, and

County Engineering Projects.

Professional Experience

. I-69 Design -Build in Daviess and Greene Counties - New interstate

project

o Developed plans for contractor's letting

. Project tasks included:

. Designing drainage to achieve an earthwork balance.

. Horizontal Realignment of I-69 and county roads to

reduce bridge width and lengths

. Vertical realignment of i-69 and county roads to

balance earthwork and reduce fill.

. Revising preliminary drainage design to eliminate

culvert crossings.

. Preparing level one documentation for revisions

horizontal and vertical alignments.

. Calculating quantities for contractors bid.

. Preparing and designing traffic maintenance plans.

. Preparing pavement markings and signing plans.

. Coordinating with bridge designers to reduce project

costs.

. SR 39 Bridge over White River in Morgan County - Bridge Replacement

and added travel lanes project.

o Developed engineer's report

. Report context and Alternates included:

. Location of new bridge and roadway with consideration

with the existing dam, wetland issues and historic

brick road.

. Traffic Maintenance alternates that included

constructing a new bridge, rehabilitating the

existing bridge and widening the existing bridge.

. Bridge typical cross section alternates that included

4 lanes section with a median, an undivided four lane

section, a three lane section with a two-way left

turn lane and a two lane section.

. Description of utility conflicts and relocation

locations.

. Roadway realignment that corresponds to the bridge

typical section alternates.

. Signal signing and lighting issues.

. Realignment of existing county road due to the

realignment of SR 39.

o Coordinated environmental document that included 4(f)

documentation due to an existing historic bridge, wetland issues

and historic brick road.

o Coordinated surveying subcontractor and right of way

engineering.

o Coordinated Right of way services and appraising and buying.

Utility coordination and relocation plans.

o Organized meeting with INDOT to coordinate fast track design

process, develop engineer's reports and for coordination with

environmental document.

o Held public hearing for environmental document.

o Designed signal, signing and lighting design.

o Coordinated with DNR for DNR construction in a floodway permit.

o Prepared cost estimate and special provision for letting.

o Organized and scheduled meetings with INDOT, USACE AND IDEM for

facilitate IDEM 401, IDEM Rule 5 and USACE 404 permits.

o Sent proposal and negotiated fees with INDOT for supplemental

right of way buying and appraising and utility coordination

work.

. 129 Road Reconstruction in Switzerland County - 12 miles of rural

roadway reconstruction and realignment.

o Set horizontal and vertical alignment for SR 129 from SR 250 to

SR 56 in Switzerland County, Indiana.

o Developed slide correction plans for slide along SR 129.

o Designed signing plans and pavement markings plans for SR 129.

o Scheduled field and other meeting with state and county

officials to discuss right of way issues, utility coordination

and traffic maintenance.

o Coordinated with INDOT, IDEM and DNR to facilitate IDEM 401,

IDEM rule 5 and 404 permits.

o Coordinated with State right buying and appraising on land owner

right of way design revision.

o Developed supplemental fee for design right of way revision and

other design related changes for the SR 129 project.

o Developed cost estimate and special provisions for January 2005

letting.

. 146th St. in Hamilton County - New construction of an urban road. New

horizontal and vertical alignments. Included drainage, signing,

lighting and signal design.

o Developed horizontal and vertical alignment for 146th St.

Project.

o Coordinated with City of Noblesville, INDOT and other

development engineers in development of new urban roadway for a

proposed retail shopping outlet.

o Designed storm drainage for 146th and other connecting city

roads.

o Designed traffic signals, signing and lighting for 146th St.

roadway.

o Coordinated with IDEM for rule 5 permit.

o Developed supplemental agreement for design revisions due to

development of project with shopping center and geometric

revisions with I-69 and SR 238 interchange.

o Developed cost estimate, quantities and special provisions.

. I-69 and SR 238 interchange - Interchange modification and widening of

bridge and ramps.

o Developed Horizontal and vertical alignment for I-69 and SR 238

interchange. January 2006 to March 2006

o Coordinated with the state and city officials in geometric

design, signing and lighting. October 2005 to January 2006.

o Developed traffic maintenance plan and sequence of construction

for I-69 and SR 238. July 2006 to November 2006.

o Developed fee proposal for interchange modification and SR 238

roadway realignment.

o Created cost estimate and special provisions.

. CR 600 W in Hancock County - Rural road reconstruction and

intersection improvements

o Scope work report For Hancock County Road 600W from US 52 to I-

70 interchange.

o Prepared fee proposal for CR 600 W roadway corridor.

o Designed horizontal and vertical alignment for CR 600 W.

o Developed Drainage for CR 600 W and coordinated with county

drainage board.

o Held public hearing to I-69.

o Split portions of project for letting due to state and county

budget restraints.

o Coordinated with government agencies for IDEM 401, USACE 404 and

IDEM role 5 permits.

o Prepared cost estimate and special provisions for sections of CR

600 W that went to letting.

. I-65 and SR 311 interchange in Jefferson County - Interchange

modification and superstructure replacement

o Designed horizontal and vertical alignment for SR 311 and

interchange ramps.

o Designed drainage and intersection improvements for SR 311 and

interchange ramps.

o Held public hearing for I-65 and SR 311 interchange

o Coordinated with INDOT for ramp modifications due to right of

way restrictions.

o Develop traffic maintenance plans for interchange and

surrounding county roads.

o Scheduled and conducted field checks for interchange to

coordinate utility and state construction concerns.

o Modified plans to coordinate with I-65 roadway reconstruction

project.

o Prepared cost estimate and special provisions for I-65 and SR

311 interchange.

Education/ Certifications

Purdue University - BS in Building Construction and Contracting

Technology

Professional Engineering License - PE#20274 State of Ohio

Work History

Beam, Longest &Neff, Inc. - 2010 to Present

Project Engineer

Job responsibilities included: Project management and design of

Indiana road projects. I am currently designing and preparing plans

for the I-69 design build projects.

Janssen & Spaans Engineering, Inc. - 2007 to 2010

Senior Project Manager

Job responsibilities included: Project management and design of

Indiana bridge and road projects. Developing project engineering

assessment reports. Supervising construction inspection projects.

USI Consultants, Inc. - 2001 to 2007

Project Manager

Job responsibilities included: Project management and design of

Indiana road projects. Developing project engineer's reports.

Beam, Longest &Neff, Inc. - 1995 to 2001

Project Designer

Job responsibilities included: Project management and design of

Indiana road projects. Developing project engineering reports.

United Consulting Engineers, Inc. - 1984 to 1995

Project Designer/ Field engineer

Job responsibilities included: Project management and design of

Indiana road projects. Working as a field engineer for county road

and bridge project's



Contact this candidate