Dennis Fitzgerald, P.E.
Number 317-***-****
Fishers, IN. 46038 Cell Number
E-mail ********@*******.***
Objective
To obtain a position as a Project Engineer for an engineering
consulting firm.
Summary of Qualifications
. 24 years experience in designing rural and urban highway in the
State of Indiana.
. Software experience in Land Desktop, AutoCAD, Highway capacity
software, and HY8 and other engineering software packages.
. Managed the development of state projects for the state of
Indiana.
. Developed proposals and costs estimates for State, City, and
County Engineering Projects.
Professional Experience
. I-69 Design -Build in Daviess and Greene Counties - New interstate
project
o Developed plans for contractor's letting
. Project tasks included:
. Designing drainage to achieve an earthwork balance.
. Horizontal Realignment of I-69 and county roads to
reduce bridge width and lengths
. Vertical realignment of i-69 and county roads to
balance earthwork and reduce fill.
. Revising preliminary drainage design to eliminate
culvert crossings.
. Preparing level one documentation for revisions
horizontal and vertical alignments.
. Calculating quantities for contractors bid.
. Preparing and designing traffic maintenance plans.
. Preparing pavement markings and signing plans.
. Coordinating with bridge designers to reduce project
costs.
. SR 39 Bridge over White River in Morgan County - Bridge Replacement
and added travel lanes project.
o Developed engineer's report
. Report context and Alternates included:
. Location of new bridge and roadway with consideration
with the existing dam, wetland issues and historic
brick road.
. Traffic Maintenance alternates that included
constructing a new bridge, rehabilitating the
existing bridge and widening the existing bridge.
. Bridge typical cross section alternates that included
4 lanes section with a median, an undivided four lane
section, a three lane section with a two-way left
turn lane and a two lane section.
. Description of utility conflicts and relocation
locations.
. Roadway realignment that corresponds to the bridge
typical section alternates.
. Signal signing and lighting issues.
. Realignment of existing county road due to the
realignment of SR 39.
o Coordinated environmental document that included 4(f)
documentation due to an existing historic bridge, wetland issues
and historic brick road.
o Coordinated surveying subcontractor and right of way
engineering.
o Coordinated Right of way services and appraising and buying.
Utility coordination and relocation plans.
o Organized meeting with INDOT to coordinate fast track design
process, develop engineer's reports and for coordination with
environmental document.
o Held public hearing for environmental document.
o Designed signal, signing and lighting design.
o Coordinated with DNR for DNR construction in a floodway permit.
o Prepared cost estimate and special provision for letting.
o Organized and scheduled meetings with INDOT, USACE AND IDEM for
facilitate IDEM 401, IDEM Rule 5 and USACE 404 permits.
o Sent proposal and negotiated fees with INDOT for supplemental
right of way buying and appraising and utility coordination
work.
. 129 Road Reconstruction in Switzerland County - 12 miles of rural
roadway reconstruction and realignment.
o Set horizontal and vertical alignment for SR 129 from SR 250 to
SR 56 in Switzerland County, Indiana.
o Developed slide correction plans for slide along SR 129.
o Designed signing plans and pavement markings plans for SR 129.
o Scheduled field and other meeting with state and county
officials to discuss right of way issues, utility coordination
and traffic maintenance.
o Coordinated with INDOT, IDEM and DNR to facilitate IDEM 401,
IDEM rule 5 and 404 permits.
o Coordinated with State right buying and appraising on land owner
right of way design revision.
o Developed supplemental fee for design right of way revision and
other design related changes for the SR 129 project.
o Developed cost estimate and special provisions for January 2005
letting.
. 146th St. in Hamilton County - New construction of an urban road. New
horizontal and vertical alignments. Included drainage, signing,
lighting and signal design.
o Developed horizontal and vertical alignment for 146th St.
Project.
o Coordinated with City of Noblesville, INDOT and other
development engineers in development of new urban roadway for a
proposed retail shopping outlet.
o Designed storm drainage for 146th and other connecting city
roads.
o Designed traffic signals, signing and lighting for 146th St.
roadway.
o Coordinated with IDEM for rule 5 permit.
o Developed supplemental agreement for design revisions due to
development of project with shopping center and geometric
revisions with I-69 and SR 238 interchange.
o Developed cost estimate, quantities and special provisions.
. I-69 and SR 238 interchange - Interchange modification and widening of
bridge and ramps.
o Developed Horizontal and vertical alignment for I-69 and SR 238
interchange. January 2006 to March 2006
o Coordinated with the state and city officials in geometric
design, signing and lighting. October 2005 to January 2006.
o Developed traffic maintenance plan and sequence of construction
for I-69 and SR 238. July 2006 to November 2006.
o Developed fee proposal for interchange modification and SR 238
roadway realignment.
o Created cost estimate and special provisions.
. CR 600 W in Hancock County - Rural road reconstruction and
intersection improvements
o Scope work report For Hancock County Road 600W from US 52 to I-
70 interchange.
o Prepared fee proposal for CR 600 W roadway corridor.
o Designed horizontal and vertical alignment for CR 600 W.
o Developed Drainage for CR 600 W and coordinated with county
drainage board.
o Held public hearing to I-69.
o Split portions of project for letting due to state and county
budget restraints.
o Coordinated with government agencies for IDEM 401, USACE 404 and
IDEM role 5 permits.
o Prepared cost estimate and special provisions for sections of CR
600 W that went to letting.
. I-65 and SR 311 interchange in Jefferson County - Interchange
modification and superstructure replacement
o Designed horizontal and vertical alignment for SR 311 and
interchange ramps.
o Designed drainage and intersection improvements for SR 311 and
interchange ramps.
o Held public hearing for I-65 and SR 311 interchange
o Coordinated with INDOT for ramp modifications due to right of
way restrictions.
o Develop traffic maintenance plans for interchange and
surrounding county roads.
o Scheduled and conducted field checks for interchange to
coordinate utility and state construction concerns.
o Modified plans to coordinate with I-65 roadway reconstruction
project.
o Prepared cost estimate and special provisions for I-65 and SR
311 interchange.
Education/ Certifications
Purdue University - BS in Building Construction and Contracting
Technology
Professional Engineering License - PE#20274 State of Ohio
Work History
Beam, Longest &Neff, Inc. - 2010 to Present
Project Engineer
Job responsibilities included: Project management and design of
Indiana road projects. I am currently designing and preparing plans
for the I-69 design build projects.
Janssen & Spaans Engineering, Inc. - 2007 to 2010
Senior Project Manager
Job responsibilities included: Project management and design of
Indiana bridge and road projects. Developing project engineering
assessment reports. Supervising construction inspection projects.
USI Consultants, Inc. - 2001 to 2007
Project Manager
Job responsibilities included: Project management and design of
Indiana road projects. Developing project engineer's reports.
Beam, Longest &Neff, Inc. - 1995 to 2001
Project Designer
Job responsibilities included: Project management and design of
Indiana road projects. Developing project engineering reports.
United Consulting Engineers, Inc. - 1984 to 1995
Project Designer/ Field engineer
Job responsibilities included: Project management and design of
Indiana road projects. Working as a field engineer for county road
and bridge project's