Merrill S. Rose
Gallipolis, Ohio 45658
e-mail: ****************@***.***
740-***-**** cell
740-***-**** home
Summary of Qualifications
** ***** ** ***********/********* experience
CMMS experience with several different program formats
Initial startup experience with PM programs in CMMS formats
OSHA: Process Safety Management 1910.19 and 1910.47 and OSHA construction package
Experienced in PSM documentation for MOC’s
Worked with Homeland Security to meet compliance for maritime exposure in petro facility
TPR and RCFA through HSBRT Training
EDUCATION
05-12 Marshall University Graduate College; Charleston,WV
MS, Environmental Engineering
08-95 West Virginia Institute of Technology; Montgomery, WV
BSEE, Electrical Engineering
06-86` Rio Grande College; Rio Grande, Ohio,
AS, Electronics Technology
08-77 The Ohio State University
Agricultural Mechanization and Systems
Experience:
2013 Exelon/Constellation, Construction Manager
• Management of Energy Optimization project at Ohio University
• Water conservation’
• Steam optimization
• Managed several subcontractors utilizing craft union labor on piping and electrical issues
2012-2013; Haverhill Chemicals, Reliability/Mechanical Integrity Engineer
• Reliability Issues/Mechanical Integrity around critical plant equipment
• Developed/Modified PM schedules on said equipment
• Upgraded key equipment to new standards across BPA unit.
• Modified waste treatment facility to increase retention time for waste removal
• Wrote and saw MOC’s through PSM process to completion for mechanical equipment and piping
• Utilized thermography, oil analysis and vibration analysis inspections for rotating equipment
(2010-2012); Completed Master’s in Environmental Engineering
2008-2009; Alcan Rolled Products, Electrical Foreman
• Maintenance and construction issues concerning furnaces and equipment
• Worked with Environmental Department to improve air quality in melting furnace building
• Developed PLC monitoring programs for air quality
2002-2007; Ergon; Manager of Maintenance
• Implementation of PM program in SAP, Responsible for all MOC’s issued to Maintenance Department
• Directed construction projects both electrical and mechanical to completion to increase capacity
• Conducted clean-up and worked with EPA for 160k barrel spill of crude oil in tank-field
• Established Maintenance and storeroom budget criteria to reduce associated costs.
• Eleven direct reports of engineers, planners and supervisors ( 47 hourly in Maintenance)
• Implemented training program for vibration analysis on critical equipment by mechanical group
2001-2002; Jacobs Constructors Incorporated; Construction Manager
Construction Management of Electrical and Piping projects for client company
Cost Estimating for projects and craft procurement to complete work
Project sizes ranged from $10,000 to 1.5 million
Maintenance Management of overflow plant maintenance allocated to JCI in petro-chemical facilities
Maintained a zero accident rate for union craftsment
1999-2001 Candle-lite: Leesburg, Ohio; Maintenance Manager
Setup MP2 CMMS for storeroom, equipment inventory and PM work order system
Implemented Maintenance training program for mechanics and electronics technicians
Project management of utilities, PLC and HVAC systems
Revised air handling system in prilling area to meet requirements of VOC inhalation
Revamped overtime policies and job descriptions for area specialists
Nine direct reports of engineers and maintenance salary group(72 hourly in Maintenance)
Managed several maintenance projects for upgrading electrical system and utilities
• Met budget criteria for 7.2 Million in regards to labor, materials and facilities
1998-1999 LOMAC.INC: Muskegon, Michigan; Maintenance Manager/Engineer
• Eight direct reports of engineers and supervisors. (33 hourly work force)
• Facility-wide electrical upgrade; transformers and MCC’s
• Company representative to contractors/vendors for cost reduction
• Process Safety Management Maintenance Team Leader for Mechanical Integrity
Maintained maintenance project cost controls
Developed understanding and documentation for “good engineering practices” for maintenance
Managed 4.5 Million budget for labor and materials
1996-1998 FMC Corporation: Process Additives Division; Nitro, WV I/E Maintenance Eng.
Developed and maintained PSM documentation in respect to reg. 1910.19
Trained technicians and Maintenance Supervisors in PSM methodology and PLC’s
Overseer for electrical Preventative Maintenance program which included thermal, corrosion analysis
and instrumentation calibration frequencies
Acted as liaison to contractors and project engineering with the maintenance department concerning
electrical issues and PSM mechanical integrity for piping and tanks
Did piping compatibility studies in respect to hazardous chemicals and corrosion effects for PSM
Siemens PLC, Honeywell TDC 2000/3000, and Fisher/Provox PID loop tuning experience
1979-1996 Shell Chemical: PET Resins Division; Apple Grove, WV Maint. Mechanic
• Replaced and repaired all types of pumping equipment
• Gained familiarity with reflux columns and towers
• Worked repairs and installations of all type of rotating equipment
• Repaired conveying equipment and high speed pelletizers
• Reworked heat exchangers, reactors and columns
• Overhauled and repaired pressure relief valves and control valves