H AR I S T HAPA
**** ******** ****. *** # ** Concord CA, 94520
Tel: 650-***-**** E-mail: t hapahar abhwx8@r.postjobfree.com
Objective: To obtain mid-level Technician in the field of electrical power engineering.
Education: Diploma in Electrical Engineering (Apprenticeship Based) 1986-1990
BUTWAL TECHN ICAL I NSTITUTE BUTWAL, NEPAL
Professional Experience:
Electro-Mechanical Technician.
PRO-BEL. USA, CAL I FORN IA Aug/2010-present
• Installation & Testing of Modular Powered Platform at Federal Building
Sacramento.
• Installation & Testing of Modular Powered Platform and single man work cage at
SANTA ANA.
• Routine maintenance of Roof Car with Traction hoists at COSMO, ENCOR and
P lanet Hollywood W Gate, Las Vegas.
• Davit Base Load Test of Equity Property Building SAN JOSE.
Electrical Supervisor
Multi Service Link (P) Ltd. Nepal 2007-2008
• Involve in Hydro power Plant Equipment Installation and Testing.
• Fabrication of control and protection panels.
• Maintenance of Generator and control panels.
ELECTRICIAN
SUPREME SITE SERV ICE, KABUL, AFGHAN ISTAN 2005-2007
• Wiring Installation and testing of ware house.
• Responsible to Maintain of CAT Diesel Generator 3x2000KVA and others.
• Installation and testing of Diesel Generator up to 500 KVA.
ELECTRICIAN
BR I T ISH ARMY CAMP (BR I T ISH GURKHAS NEPAL) 2002-2005
• Industrial & Domestic Electrical wi ring installation and testing as per IEE
regulation.
• Portable appliances testing according to U K Standard.
• Responsible for boiler plant, generator and all camp equipment planned
maintenance system.
ELECTRICAL SUPERVISOR
NEPAL HYDRO & ELECTR IC LTD. NEPAL 1991-2002
• Installation, Testing commissioning and Maintenance of various sizes of hydro power
p lants
1 M W-144 MW
• Installation, Testing & commissioning of 11 kV-132 kV Substations.
• Fabrication of various industrial and utility control and protection panels.
• Repair and rewinding of Generator, Motor as well as distr ibution and power
T ransformer.
• Installation and Testing of 2x40 Ton overhead crane at New Building workshop.
E LECTRICAL TECHN ICIAN
BUTWAL POWER COMPANY LTD. NEPAL. 1990-1991
• Fully involve in Installation of electrical equipment and control panel for 5.1 MW
A ndhikhola Hydro Power Plant.
• Testing and commissioning of generator, control panel and Transformer.
• Drafting works for Control panel External wir ing.
T RA I N I NG:
• Control panel fabrication 60 MW Khimti Hydro Power Plants- A BB NORWAY.
• Motor & Generator Testing and Maintenance Course by AVO Training Institute,
Dallas, TX, USA.
• PAT/Electrical 16th E dition wi ring Inspect & Testing course by W TI Training Group
U K.
• Forward Tipping Dump Truck Course by Royal Engineer Army School, U K.
• Emergency fire fighting course by B rit ish Gurkhas Nepal.
• Nifty lif t operation Training by B rit ish Gurkhas Nepal.
• Fire precaution Training by B r it ish Gurkhas Nepal.
• Productivity Improvement by N PEDC, Nepal.
• Mid Level Management by U nited M ission to Nepal.
Reference:
DON GIBSON REED OVERSHINER
1558 5TH STREET 1507 WIL L IAM WAY
CONCORD CA, 94519 CONCORD CA, 94520
TEL: 925-***-**** TEL: 925-***-****
M AJOR PROJECT EXCU TE D:
1. 12MW JH I MRUK Hydro Power Plants - ABB NORWAY.
Fabrication and Installation of 6.6 kV and 132 kV control and protection panel.
Installation and Testing of 6.6 kV and 33 kV Switchgears
Installation of 132 kV switchyard equipments CT, VT, Disconnector switch and SF6 Gas
C ircuit Breaker.
Installation and Testing of CT, VT, Disconnector switch and SF6 Gas Circuit Breaker of
L amahi 132 kV Substation.
Involve in Testing of Distance Relay.
2. 60 MW Khimti Hydro Power Plants- A BB NORWAY.
Fabrication of AC/DC panels.
Complete erection of 132 kV Switch yard equipments.
Installation and Testing of 5 and 30 Ton Overhead crane with M UNC COMPANY,
N ORWAY.
3. 14 MW Modikhola Hydro Power Plant- Hyundai Engineering construction company
Korea.
Complete installation and testing of 132 kV Switchyard Equipments, ALSTOM SF6 Gas
circuit breaker, power Transformer.
Installation and Testing of 6.6 kV and 11 kV Switchgear and control & protection panel.
Equipment Erection and testing Existing bay of pokhara Substation.
PLC Connection and Testing under PCAS I reland.
Installation and Testing of 30 TON Overhead Crane.
4. 144 MW Kali Gandaki Hydro Power Plant- Toshiba company Japan.
F ully Involve in Generator Rotor Assembly works (3x56.5 MVA)
5. Lekhnath Substation-TATA Projects I ND IA.
Fully Involve in Equipment Erection of 10 MVA, 132 kV Substation.
6. 5.1 MW Andhikhola Hydro Power Plants.
Fully Involve in Electrical Installation work, especially in control panel and their
connections as well as power plant commissioning. Involve in making drawing and
documentation.
7. 1 MW Tinau Hydro Power Plant
Refurbishment of all control and protection panels as well as Generator.
Ext ra Activity:
1. 16 TON Mobile Crane Operation
2. Dump Truck, Fork Lif t, VNA and Nifty Lift operation.
3. General Knowledge of Welding as well as General Mechanic.