Post Job Free

Resume

Sign in

Power Plant Electrical

Location:
Concord, CA, 94520
Posted:
January 04, 2011

Contact this candidate

Resume:

H AR I S T HAPA

**** ******** ****. *** # ** Concord CA, 94520

Tel: 650-***-**** E-mail: t hapahar abhwx8@r.postjobfree.com

Objective: To obtain mid-level Technician in the field of electrical power engineering.

Education: Diploma in Electrical Engineering (Apprenticeship Based) 1986-1990

BUTWAL TECHN ICAL I NSTITUTE BUTWAL, NEPAL

Professional Experience:

Electro-Mechanical Technician.

PRO-BEL. USA, CAL I FORN IA Aug/2010-present

• Installation & Testing of Modular Powered Platform at Federal Building

Sacramento.

• Installation & Testing of Modular Powered Platform and single man work cage at

SANTA ANA.

• Routine maintenance of Roof Car with Traction hoists at COSMO, ENCOR and

P lanet Hollywood W Gate, Las Vegas.

• Davit Base Load Test of Equity Property Building SAN JOSE.

Electrical Supervisor

Multi Service Link (P) Ltd. Nepal 2007-2008

• Involve in Hydro power Plant Equipment Installation and Testing.

• Fabrication of control and protection panels.

• Maintenance of Generator and control panels.

ELECTRICIAN

SUPREME SITE SERV ICE, KABUL, AFGHAN ISTAN 2005-2007

• Wiring Installation and testing of ware house.

• Responsible to Maintain of CAT Diesel Generator 3x2000KVA and others.

• Installation and testing of Diesel Generator up to 500 KVA.

ELECTRICIAN

BR I T ISH ARMY CAMP (BR I T ISH GURKHAS NEPAL) 2002-2005

• Industrial & Domestic Electrical wi ring installation and testing as per IEE

regulation.

• Portable appliances testing according to U K Standard.

• Responsible for boiler plant, generator and all camp equipment planned

maintenance system.

ELECTRICAL SUPERVISOR

NEPAL HYDRO & ELECTR IC LTD. NEPAL 1991-2002

• Installation, Testing commissioning and Maintenance of various sizes of hydro power

p lants

1 M W-144 MW

• Installation, Testing & commissioning of 11 kV-132 kV Substations.

• Fabrication of various industrial and utility control and protection panels.

• Repair and rewinding of Generator, Motor as well as distr ibution and power

T ransformer.

• Installation and Testing of 2x40 Ton overhead crane at New Building workshop.

E LECTRICAL TECHN ICIAN

BUTWAL POWER COMPANY LTD. NEPAL. 1990-1991

• Fully involve in Installation of electrical equipment and control panel for 5.1 MW

A ndhikhola Hydro Power Plant.

• Testing and commissioning of generator, control panel and Transformer.

• Drafting works for Control panel External wir ing.

T RA I N I NG:

• Control panel fabrication 60 MW Khimti Hydro Power Plants- A BB NORWAY.

• Motor & Generator Testing and Maintenance Course by AVO Training Institute,

Dallas, TX, USA.

• PAT/Electrical 16th E dition wi ring Inspect & Testing course by W TI Training Group

U K.

• Forward Tipping Dump Truck Course by Royal Engineer Army School, U K.

• Emergency fire fighting course by B rit ish Gurkhas Nepal.

• Nifty lif t operation Training by B rit ish Gurkhas Nepal.

• Fire precaution Training by B r it ish Gurkhas Nepal.

• Productivity Improvement by N PEDC, Nepal.

• Mid Level Management by U nited M ission to Nepal.

Reference:

DON GIBSON REED OVERSHINER

1558 5TH STREET 1507 WIL L IAM WAY

CONCORD CA, 94519 CONCORD CA, 94520

TEL: 925-***-**** TEL: 925-***-****

M AJOR PROJECT EXCU TE D:

1. 12MW JH I MRUK Hydro Power Plants - ABB NORWAY.

Fabrication and Installation of 6.6 kV and 132 kV control and protection panel.

Installation and Testing of 6.6 kV and 33 kV Switchgears

Installation of 132 kV switchyard equipments CT, VT, Disconnector switch and SF6 Gas

C ircuit Breaker.

Installation and Testing of CT, VT, Disconnector switch and SF6 Gas Circuit Breaker of

L amahi 132 kV Substation.

Involve in Testing of Distance Relay.

2. 60 MW Khimti Hydro Power Plants- A BB NORWAY.

Fabrication of AC/DC panels.

Complete erection of 132 kV Switch yard equipments.

Installation and Testing of 5 and 30 Ton Overhead crane with M UNC COMPANY,

N ORWAY.

3. 14 MW Modikhola Hydro Power Plant- Hyundai Engineering construction company

Korea.

Complete installation and testing of 132 kV Switchyard Equipments, ALSTOM SF6 Gas

circuit breaker, power Transformer.

Installation and Testing of 6.6 kV and 11 kV Switchgear and control & protection panel.

Equipment Erection and testing Existing bay of pokhara Substation.

PLC Connection and Testing under PCAS I reland.

Installation and Testing of 30 TON Overhead Crane.

4. 144 MW Kali Gandaki Hydro Power Plant- Toshiba company Japan.

F ully Involve in Generator Rotor Assembly works (3x56.5 MVA)

5. Lekhnath Substation-TATA Projects I ND IA.

Fully Involve in Equipment Erection of 10 MVA, 132 kV Substation.

6. 5.1 MW Andhikhola Hydro Power Plants.

Fully Involve in Electrical Installation work, especially in control panel and their

connections as well as power plant commissioning. Involve in making drawing and

documentation.

7. 1 MW Tinau Hydro Power Plant

Refurbishment of all control and protection panels as well as Generator.

Ext ra Activity:

1. 16 TON Mobile Crane Operation

2. Dump Truck, Fork Lif t, VNA and Nifty Lift operation.

3. General Knowledge of Welding as well as General Mechanic.



Contact this candidate