Post Job Free
Sign in

Engineer Maintenance

Location:
81516
Posted:
February 02, 2011

Contact this candidate

Resume:

CV

DCS Automation Control Engineer

Referenced Personal Data

Name: Essam Mohamed Ahmed Mahmoud

Date / Place of birth: 08-20-1969 - Assuit

Address: Sahary- Building no.68 Flat 3

Aswan- Egypt

Nationality: Egyptian

Telephone: 002-097-3482261

Mobile: 002-0116767163

Email: ***************@*****.***

**************@*****.***

My Career Objective

Having worked in permanent role over last 15 years, my progress from being

an operation engineer to senior DCS maintenance engineer with installing,

start up, test, commissioning AC400, AC450 & AC800xA controllers series,

I/O modules, fiber optic cables, switches, Unix remote operator stations in

control room, NT stations, UPS power supply for system, communication

networks, information management system IMS and archiving for faults

analysis, local human machine interface SARI & software which include unit

start-stop sequence, hydraulic protections, MW-MVAR joint control, grid

voltage regulator and able to redesign or modify software for control

system if needed .

My Ideal Company

The ideal company I am looking for a company or factory interested in

digital automation systems using ABB controllers. Like (AC 400 series as

AC450, AC 800 series)

My Interests

Enjoyed walking with my family. Like reading& playing football.

Availability: now working in hydropower Generation Company in Aswan and

would be available when my CV is accepted.

Education

o 1986 to 1991 -

* B.Sc. Degree in Electronic Engineering - Computer sciences department.

*

Training Courses Attended

Course / Place Duration Skills & Knowledge

Program

AMPLISSIMA Sweden 3 weeks Amplisima system Administrator

SYSTEM SwedPower AB Jan 21 - Feb8, Work orders, Stores, Purchasing,

Windows NT 2002 Preventive Maintenance Procedures

version & Report generators.

Hydro Power 2 weeks HPC-IMS hardware training Course.

Control Aswan Nov2002

Information

Management sys

(HPC-IMS)

Hydro Power 2 months HPC-IMS online training Course of

Control Aswan March-April 2004 Installing and configuration

Information software.

Management sys

(HPC-IMS)

System for 2 weeks Controlling & Monitoring

Automation Aswan Aug14-28, 2003 production Sites, power stations

And Remote,

Local Human 24 Personal Computers are

Machine equipped with SARI for 12

Interface Generators to supervise the

(SARI LHMI) generation units and switchyard

functions.

Hydro Power 2 months ABB AdvaCommand Applications

Control - Aswan Process Display creating

Distributed October-November ABB Operator Station AS500 series

Control System Maintenance.

2003 ABB Operator Station AS500 series

HPC-DCS (ABB) Backup.

ABB AC450 Controller Maintenance

ABB AC450 Database & Software

On-line Modification.

Work Experience

Company: Date: Role:

High Dam Power Nov 2002 - DCS control system maintenance engineer.

Station Present Responsible for Supervising & Follow up

Computer evaluation, Study Specifications for the

section DCS control upgrade project, drawings, and

documentation. In addition installing,

start up, test, commissioning AC400, AC450

&AC800xA controllers series, I/O modules,

fiber optic cables, switches, Unix remote

operator stations in control room, NT

stations, UPS power supply for system,

communication networks, information

management system IMS and archiving for

faults analysis, local human machine

interface SARI & software which include

unit start-stop sequence, hydraulic

protections, MW-MVAR joint control, grid

voltage regulator and able to design or

modify software for control system if

needed.

High Dam Power Jul 2001 - IT maintenance engineer.

Station October 2002 Responsible for Planning & supervise

Computer maintenance activities (preventive,

section predictive & corrective) in safe conditions

for Micro Computers (MicroVAX), Terminals,

Communication network, DEC servers, Line

drivers, local printers, line printers,

Tape Backup, Personal Computers, network

printers, local printers, Laptop, NT

servers, NT workstations, communication

switches-Hubs & the development procedures

for systems.

Responsible for Designing Data Base

software using Access 2000 at many

applications like secretary files

archiving, Book-Store, Management &

Personals affairs

Report to computer department general

manager.

High Dam Power May 1995 - Jun Maintenance engineer for high voltage

Station 2001 equipments Oil Circuit Breaker (6kv-

Electrical 15.75kv), AC motors, DC motors, Battery

Maintenance systems, UPS, Cranes, Elevators & lighting

Engineer systems.

High Dam Power March 1993 - Supervising & Operate 12 synchronous

Station April 1995 generators (175 MW, 15.75 KV, its

Operation protection, its speed & voltage

Engineer regulators).

My Skills

ABB engineering software

(design or programming using pc elements for advant controller AC450 using

function chart builder, modify software pc's offline or online, downloading

software to controller using engineering station, dumping the software form

the controller to engineering station,write the dump on application flash)

Online Fault tracing without shutdown

Advant station graphics software

Create graphics for advant stations which used by operators .

Commissioning project engineer

Prepare documentations as site built, prepare test sheets for signals loop

check with the controller which are :

AI(analog signals),

DI (digital field signals) (0 or 1)

AO (analog output signals for meters or readings) (4 to 20 ma)

DO (digital output signals for fields) (24 vdc)

DIC (digital input calculated for software) for indications in graphics

DOC (digital output calculated) for graphics

AOC (analog output calculated) also for graphics

HMI for local control software

this for local control also through controller

IMS information management software configuration

Configure signals (7000 signals capacity) for NT servers

(Data Base Server using SQL2000, Data Server, Historical Archive)

And store the signals values as minutely values or yearly values

IMS helps for fault analysis or pre maintenance and so ...

Project engineer for Siemens Company

in execution 220kv substation project in high dam power station for along 2

years.

MCSE engineer

Ms Office (word, excel, access), AutoCAD & Ms project

Driving licenses Active

Experience 15 yrs

English writing & spoken Excellent



Contact this candidate