ANTONIO LASHAWN COBIN
**** ******** **** ******** *****, Virginia 22443
Home: 804-***-****
Email: *************@*****.***
Objective: To advance in the field of engineering and survey; to acquire
extensive knowledge and expertise; and to successfully utilize acquired
knowledge in practical applications.
Overview SURVEYOR/CREW CHIEF
Over 10 years experience on heavy industrial projects
including:
? Bridges ? Alta
? Gps
? Railroads ? Asbuilt
? Waste Water
? Highways ? Tree Topo
Treatment Plants
? Chemical Plants ? Tunnel
? Landfill Survey
? Power Plants ? Mortgage
Survey
? Subdivisions ? Boundary
Survey
? Route Surveying ? Hydro
Areas of ? Trimble 5600 w/ Remote
Expertise ? Trimble S6
In the following ? Trimble SCS 900 Software
equipment ? Geodimeter 600 w/ Remote
? Topcon 800 w Remote
? Sokkia Sets 3110, 3E, 5E, 3B
? Dini Digital Level
? Topcon Gps w/ Glonass
? Trimble R8
? Trimble Pro XH & Pro XR
? Ranger
? Recon
? Nomad
? TDS Survey Pro
Professional Fluor-Lane Consultants 2009 -
Experience Present
SURVEYOR/ CREW CHIEF
U.S Interstate 495 Hot Lanes Project
Scope of Project: Survey to accommodate the
addition of four HOV lanes (two each direction).
The 1.6 billion dollar project spans the
Northern Virginia corridor of the the state of
Virginia.
Duties include: Laying out bridges, roads, sound
walls, drainage, waterlines overhead signs, etc.
2008-200
9
SURVYOR/ CREW CHIEF
As needed and part time surveying and surveyor
assistant work on various projects for multiple
supervisors.
CORNERSTONE SURVEYING & ENGINEERING 1998-200
7
SURVEYOR/ CREW CHIEF
? Responsible for running 2 and 3 man crews for
achievement of project objectives including
quality, safety, deadlines and project
completion.
? Lead surveyor on new construction of the
Daniel Island Waste Water Treatment Plant in
Daniel Island, South Carolina
Arthur Ravenel Bridge Construction
Scope of project: Bridge construction of the 640
million dollar Arthur Ravenel Bridge in
Charleston, SC. It is the tallest cable bridge
in the northern hemisphere.
Duties included: Staking out pilings, setting
pier caps, Stake out on and off ramps, setting
barges out on river to perform concrete
pourings, stake anchor bolts, and performed
quality control, etc.
CSX Columbia Rail Extension Project
Scope of project: Railroad Extension in
Columbia, South Carolina
Duties included: staking centerline of rail in
the newly proposed easement, setting concrete
columns as the rail crossed several creeks and
rivers, etc.
DAVIS & FLOYD ENGINEERING
INSTRUMENT TECHNICIAN
Conway/Myrtle Beach Highway Construction
Scope of project: Surveying for new 32 mile
by-pass highway construction from Conway, SC to
Myrtle Beach, SC
Duties included: Daily setup and orientation of
various surveying equipment, surveying and slope
staking on and off ramps, staking and setting
concrete columns, staking centerline and
calculating offsets.
Education & MACEDONIA HIGH
Qualifications
? Osha Certification
? CPR Certification
? JLG operator certified
References & Supporting Documentation Furnished Upon Request