Curriculum
Vitae
BALTAZAR A. OBIDOZA
Mobile: 050*******
Home: 074-***-****
E-mail: abhotu@r.postjobfree.com
NAME : BALTAZAR A. OBIDOZA
POSITION DESIRED : ELECTRICAL ENGINEER /
MAINTENANCE ENGINEER
WORK EXPERIENCE
Electrical Quality Inspector
June 24, 2008 to Present
Emirates Trading Agency, Mechanical and Electrical Division.
Business Bay, Dubai
Duties and responsibilities
. Inspect Electrical Works for Proper implementation
and in conformance to
the Electrical Method of statement.
. Insures that all electrical works are in
conformance with DEWA regulations.
. Maintains records for Inspection request,
Provides IR numbers.
. Coordinates with Consultant concerning inspection
and Clearances
Electrical Engineer, Bays water Tower
April 25, 2007 to June 24,2008
Emirates Trading Agency, Mechanical and Electrical Division.
Business Bay, Dubai
Duties and Responsibilities :
..
. Responsible in the proper implementation of electrical
works on the
Project and insures the timely delivery of complete works
Inspect project to verify completed works and prepares
list of incomplete
works to be undertaken.
. Inspects proper installation of the following;
1. Electrical Cables
2. Trunking works
3. Cable tray installation.
4. DB installation.
5. Meager testing and correct colour code if wires
installed
6. Conduit fixing on slab for different electrical services
such as Power, Lighting and switches, emergency lights,
telephone and low power and Fire alarm.
7. Buss Bar Installation.
. Prepares Inspection request of works completed and submits it
to the MEP coordinator.
. Coordinates with the Main contractors concerning MEP
installation.
. Coordinates with main Contractor and subcontractors
concerning work requirement.
. Prepares request for Grid clearance and Boarding clearance
. Prepares request for Materials needed at the Project.
. Prepared Quantity Estimates for Materials Needed at the
Project.
. Inspects materials delivered to establish conformance on
Make and specification as per the Project Requirement.
. Prepares Material Inspection request for Consultants approval
of materials delivered at the site.
. Coordinates with Suppliers concerning project requirements
Electrical Site Engineer. Tower B, Executive towers
September 3, 2006 to April 25, 2007
Emirates Trading Agency, Mechanical and Electrical Division.
Executive Towers at Business Bay, Dubai
Duties and Responsibilities :
. Responsible in the proper implementation of electrical
works on the
Project and insures the timely delivery of complete works
Inspect project to verify completed works and prepares
list of incomplete
works to be undertaken.
. Inspects proper installation of the following;
8. Electrical Cables
9. Trunking works
10. Cable tray installation.
11. DB installation.
12. Meager testing and correct colour code if wires
installed
13. Conduit fixing on slab for different electrical services
such as Power, Lighting and switches, emergency lights,
telephone and low power and Fire alarm.
14. Buss Bar Installation.
. Prepares Inspection request of works completed and submits to
the MEP coordinator.
. Coordinates with the Main contractors concerning MEP
installation.
. Prepares request for Grid clearance and Boarding clearance
Engineer II/Facilities and Maintenance Engineer
July, 1990 to Current
LIVECOR : Maharlika Project
Baguio City
Duties and responsibilties
. Inspects all section of the building including immediate
premises to determine areas for improvement/maintenance
/repair and Proposes Repairs and Improvement.
. Prepares plans, Electrical designs, specifications,
scope of work required and Acted as consultant for the
preparation of specification required for the repair,
servicing and other improvement of the project. ( Plans on
the Following; Electrical, Civil, Mechanical, Sewage and
Drainage system.
. Undertakes Electrical inspection before, during and
after works and
prepares report and design for the repair of other
LIVECOR Projects
. Supervise Electrical Installation of the Complex and
other Projects of
LIVECOR
. Incharge in the Proper Upkeep of the Building, Building
Facilities and Property.
. Monitors Security and Janitorial Services for the Proper
delivery of services as per specified in the Contract.
. Prepares Bid documents for the hiring of Security and
Janitorial Services.
. Prepares Bid Documents for Contract out works.
. Incharge in the Timely and Adequate delivery of Building
Utilities such as Power and Light, Water and Signal
. Consults with tenants concerning technical evaluation of
Electrical, Sanitary, architectural, mechanical plans
submitted by tenants for the purpose of stall improvement,
installation, repair and construction .
. Supervises construction works undertaken by Contract
agencies.
. Supervises Maintenance Personnel for effective and
efficient work
. Provides Maintenance schedule for the Complex facilities,
equipments and the Buildings
. Undertakes mechanical and electrical repairs.
. Verifies and inspects, certifies completion of
construction, installation and services rendered by outside
parties/agencies per specification of contract and or
purchase of job order concerning maintenance.
. Identifies and requisition of supplies, tools, equipment,
needed to render efficient maintenance, services.
. Led a team of Personnel to make sure that the proper
maintenance /operation of all building equipments namely;
1) One unit 235 KVA generator set
2) 2 units 5 hp. 3phase water pump
3) unit 3 hp, 3 phase water pump.
4) 1 unit 20 hp. Submersible pump
5) 2 units 5 hp submersible sump pump.
6) 2 units 3 hp submersible pit pump
7) 1 unit 10 hp. Jockey pump
8) 1 unit 50 hp fire pump
9) 2 units 5 hp. Blower system.
10) 1 unit 10 hp blower system.
11) 34 units roll up doors
12) Circuit breakers
13) alley lights
14) Paging system.
15) Vehicle ( land cruiser)
16) 6 units, 167 KVA, 23000 volts Transformers
17) 2 units dishwashing machines.
18) 2 units 50 gallons, water heater.
19) Ducting system.
20) Office equipments
. Made sure that there is an adequate daily supply of water
and electricity and the proper operation of the paging
system, telephone system, sewer and drainage system.
. To check electrical billing submitted by general services
before forwarding it to accounting.
. Controls and monitor materials for maintenance and repair of
the complex.
. Coordinates with other agencies such as Utility companies
and other Government agencies
Building Maintenance officer.
May, 1989 to July, 1990
LIVECOR, Maharlika Project
Baguio City
Duties and responsibilties
. Prepared Electrical designs, Scope of work and cost
estimates for the improvement of spaces for rent or repair
of the Complex 3 Phase Power and Lighting System.
. Prepared Civil works, Plumbing works, Carpentry works
designs, scope of work and cost estimate for the repair and
improvement of the Complex
. Supervised the proper implementation of repair and
improvement of the Complex in Electrical, Civil, Mechanical,
Plumbing and Carpentry works
. Under took major electrical and mechanical repair of the
building.
. Monitors and supervises the proper maintenance, repairs
and improvements undertaken on of the following equipments
and Building Facilities.
1) Generator set
2) Water pumps
3) Sump pumps
4) Pit pumps
5) Fire pumps
6) Jockey pumps
7) Blower motor and blower system
8) Roll up doors
9) Circuit breakers
10) Alley lights
11) Paging system
12) Vehicle( Land cruiser)
13) Building electrical system
14) Telephone system
15) 6 units 167 KVA, 23 KV Transformers
16) Circuit Breakers and Electrical Protective Devices
. Undertakes daily inspection of water and electrical supply,
paging system, telephone system sewer line and drainage
system and undertakes repair if needed.
. Prepares Budget proposal for the Building Maintenance uses for
approval of Finance Department.
. Undertakes daily inspection of water and electrical supply,
paging system, telephone system sewer line and drainage
system and undertakes repair if needed.
. Performs such other functions/duties assigned by higher
supervisor
Assistant Building Administrator
June 1988 to May, 1989
Strategic Investment Development Corporation
Maharlika Livelihood Center
Baguio City
Duties and responsibilities:
. Have been task to inspect all section of the building
including immediate
premises to determine areas for improvement/maintenance
and repair. And
to prepare report and recommendations to improve or
repair
areas/facilities found to be defective.
. Prepares Electrical designs containing Transformer layout,
Circuit breaker lay out, Load schedules and specifications,
Scope of work and cost estimates for the improvement or repair
of the Complex 3 Phase Power and Lighting System.
. Prepared Electrical Design/estimates and Scope of work for the
Fastfood Area with 32 stalls, Dishwashing area with heaters.
. Prepares Civil works, Plumbing works, Carpentry works
designs, scope of work and cost estimate for the repair and
improvement of the Complex
. Supervises the proper implementation of repair and improvement
of the Complex in Electrical, Civil, Mechanical, Plumbing and
Carpentry works
. Have been in charge in the monitoring compliance of tenants
with the building rules and regulations.
. Identified and requested supplies, tools, equipments needed to
render
efficient services.
. Supervised the proper performance of Janitorial and Security
Services
. Led and Supervise the Proper and efficient delivery of
services/repairs of
Maintenance personnel
. Made sure that Utilities such as water, electrical system,
paging
system, telephone system, sewer and drainage system are
in working
conditions
. checked electrical billing submitted by the general services
section before forwarding it to accounting .
. Provided individual water and electric meter to tenant s who
are paying on flat rate basis.
. inspected, verify and certify completion of construction,
installation and services rendered by outside
parties/agencies
per specification of contract and or purchase job order
concerning maintenance.
. Performed other functions which may be delegated or assigned
from Time to time.
Industrial Electrician
May, 1986 to June, 1988
Borromeo Engineering,
Kayamg st. Baguio City
. Has Undertook Electrical wiring installation of contracted
Residential and Industrial establishments such as Texas
instruments, Hospitals and Laboratories.
. Undertook repairs of Electrical Equipments such as motors,
Dishwashing Machines and other electronic/electrical
equipments.
OTHER PROFESSIONAL SERVICES RENDERED
. Supervised the installation of wiring system for 32 units
Fast Food stalls.
. Supervised the installation of 3 units 167kva/23 kv
transformers.
. Supervised the dismantling and transfer of 3 units
distribution transformers.
. Supervised the load balancing of a Commercial complex.
. Supervised the Installation of addressable Fire alarm system.
. Supervised the installation of Paging system.
. Supervised the Installation of 2oo pair inhouse telephone
system.
. Electrical Design for Both Power, Lighting and Signal for
a 15 storey School
and Library building with 3 Phase power source
. Electrical Design for a 2 Commercial Building having 3
Phase Power source.
. Design and Implementation of Electrical power and lighting
of at least 20
Residential Houses.
. Design of Telephone system for a commercial complex
. Installation of Signal Enhancement Omni Directional
Antennas (43 units)
. Design of Building Ventilation system
OTHER SKILLS
Proficient in the use of Microsoft Word, Excel, Power Point, Internet
Explorer., electronics,
Knowledge in Civil works such as Rebars, Carpentry, plumbing and Masonry
Knowledge in Mechanical works, Report writing and Document Preparations
such as Bid documents for Janitorial and Security, Bid Documents for work
to be undertaken by contractors. Driving skill
PERSONAL REFERENCES:
Date of Birth : January 6, 1960
Place of Birth : Baguio City,
Philippines
Sex / status ; Male, / Married
Language/ Dialect: : English, Tagalog and
Ilocano
UAE Address : Al Rigga St. Deira, Dubai
UAE Tel. Numbers : 050-***-****
Philippine Address : 32 Upper Fairview, Baguio City,
Philippines
Philippine Tel No : o74- 445-5666
EDUCATION & QUALIFICATIONS
1990 Passed Board exam for Electrical Engineer/ Licensed Electrical
Engineer
1986
Saint Louis University
Completed my Bachelor of Science in Electrical Engineering
1980
Baguio Electronics and Technical Institute
Completed my Certificate in Communication Technician
1977
Saint Louis Boys High School
High School Diploma