Post Job Free

Resume

Sign in

Electrical Engineer

Location:
2600
Posted:
March 30, 2011

Contact this candidate

Resume:

Curriculum

Vitae

BALTAZAR A. OBIDOZA

Mobile: 050*******

Home: 074-***-****

E-mail: abhotu@r.postjobfree.com

NAME : BALTAZAR A. OBIDOZA

POSITION DESIRED : ELECTRICAL ENGINEER /

MAINTENANCE ENGINEER

WORK EXPERIENCE

Electrical Quality Inspector

June 24, 2008 to Present

Emirates Trading Agency, Mechanical and Electrical Division.

Business Bay, Dubai

Duties and responsibilities

. Inspect Electrical Works for Proper implementation

and in conformance to

the Electrical Method of statement.

. Insures that all electrical works are in

conformance with DEWA regulations.

. Maintains records for Inspection request,

Provides IR numbers.

. Coordinates with Consultant concerning inspection

and Clearances

Electrical Engineer, Bays water Tower

April 25, 2007 to June 24,2008

Emirates Trading Agency, Mechanical and Electrical Division.

Business Bay, Dubai

Duties and Responsibilities :

..

. Responsible in the proper implementation of electrical

works on the

Project and insures the timely delivery of complete works

Inspect project to verify completed works and prepares

list of incomplete

works to be undertaken.

. Inspects proper installation of the following;

1. Electrical Cables

2. Trunking works

3. Cable tray installation.

4. DB installation.

5. Meager testing and correct colour code if wires

installed

6. Conduit fixing on slab for different electrical services

such as Power, Lighting and switches, emergency lights,

telephone and low power and Fire alarm.

7. Buss Bar Installation.

. Prepares Inspection request of works completed and submits it

to the MEP coordinator.

. Coordinates with the Main contractors concerning MEP

installation.

. Coordinates with main Contractor and subcontractors

concerning work requirement.

. Prepares request for Grid clearance and Boarding clearance

. Prepares request for Materials needed at the Project.

. Prepared Quantity Estimates for Materials Needed at the

Project.

. Inspects materials delivered to establish conformance on

Make and specification as per the Project Requirement.

. Prepares Material Inspection request for Consultants approval

of materials delivered at the site.

. Coordinates with Suppliers concerning project requirements

Electrical Site Engineer. Tower B, Executive towers

September 3, 2006 to April 25, 2007

Emirates Trading Agency, Mechanical and Electrical Division.

Executive Towers at Business Bay, Dubai

Duties and Responsibilities :

. Responsible in the proper implementation of electrical

works on the

Project and insures the timely delivery of complete works

Inspect project to verify completed works and prepares

list of incomplete

works to be undertaken.

. Inspects proper installation of the following;

8. Electrical Cables

9. Trunking works

10. Cable tray installation.

11. DB installation.

12. Meager testing and correct colour code if wires

installed

13. Conduit fixing on slab for different electrical services

such as Power, Lighting and switches, emergency lights,

telephone and low power and Fire alarm.

14. Buss Bar Installation.

. Prepares Inspection request of works completed and submits to

the MEP coordinator.

. Coordinates with the Main contractors concerning MEP

installation.

. Prepares request for Grid clearance and Boarding clearance

Engineer II/Facilities and Maintenance Engineer

July, 1990 to Current

LIVECOR : Maharlika Project

Baguio City

Duties and responsibilties

. Inspects all section of the building including immediate

premises to determine areas for improvement/maintenance

/repair and Proposes Repairs and Improvement.

. Prepares plans, Electrical designs, specifications,

scope of work required and Acted as consultant for the

preparation of specification required for the repair,

servicing and other improvement of the project. ( Plans on

the Following; Electrical, Civil, Mechanical, Sewage and

Drainage system.

. Undertakes Electrical inspection before, during and

after works and

prepares report and design for the repair of other

LIVECOR Projects

. Supervise Electrical Installation of the Complex and

other Projects of

LIVECOR

. Incharge in the Proper Upkeep of the Building, Building

Facilities and Property.

. Monitors Security and Janitorial Services for the Proper

delivery of services as per specified in the Contract.

. Prepares Bid documents for the hiring of Security and

Janitorial Services.

. Prepares Bid Documents for Contract out works.

. Incharge in the Timely and Adequate delivery of Building

Utilities such as Power and Light, Water and Signal

. Consults with tenants concerning technical evaluation of

Electrical, Sanitary, architectural, mechanical plans

submitted by tenants for the purpose of stall improvement,

installation, repair and construction .

. Supervises construction works undertaken by Contract

agencies.

. Supervises Maintenance Personnel for effective and

efficient work

. Provides Maintenance schedule for the Complex facilities,

equipments and the Buildings

. Undertakes mechanical and electrical repairs.

. Verifies and inspects, certifies completion of

construction, installation and services rendered by outside

parties/agencies per specification of contract and or

purchase of job order concerning maintenance.

. Identifies and requisition of supplies, tools, equipment,

needed to render efficient maintenance, services.

. Led a team of Personnel to make sure that the proper

maintenance /operation of all building equipments namely;

1) One unit 235 KVA generator set

2) 2 units 5 hp. 3phase water pump

3) unit 3 hp, 3 phase water pump.

4) 1 unit 20 hp. Submersible pump

5) 2 units 5 hp submersible sump pump.

6) 2 units 3 hp submersible pit pump

7) 1 unit 10 hp. Jockey pump

8) 1 unit 50 hp fire pump

9) 2 units 5 hp. Blower system.

10) 1 unit 10 hp blower system.

11) 34 units roll up doors

12) Circuit breakers

13) alley lights

14) Paging system.

15) Vehicle ( land cruiser)

16) 6 units, 167 KVA, 23000 volts Transformers

17) 2 units dishwashing machines.

18) 2 units 50 gallons, water heater.

19) Ducting system.

20) Office equipments

. Made sure that there is an adequate daily supply of water

and electricity and the proper operation of the paging

system, telephone system, sewer and drainage system.

. To check electrical billing submitted by general services

before forwarding it to accounting.

. Controls and monitor materials for maintenance and repair of

the complex.

. Coordinates with other agencies such as Utility companies

and other Government agencies

Building Maintenance officer.

May, 1989 to July, 1990

LIVECOR, Maharlika Project

Baguio City

Duties and responsibilties

. Prepared Electrical designs, Scope of work and cost

estimates for the improvement of spaces for rent or repair

of the Complex 3 Phase Power and Lighting System.

. Prepared Civil works, Plumbing works, Carpentry works

designs, scope of work and cost estimate for the repair and

improvement of the Complex

. Supervised the proper implementation of repair and

improvement of the Complex in Electrical, Civil, Mechanical,

Plumbing and Carpentry works

. Under took major electrical and mechanical repair of the

building.

. Monitors and supervises the proper maintenance, repairs

and improvements undertaken on of the following equipments

and Building Facilities.

1) Generator set

2) Water pumps

3) Sump pumps

4) Pit pumps

5) Fire pumps

6) Jockey pumps

7) Blower motor and blower system

8) Roll up doors

9) Circuit breakers

10) Alley lights

11) Paging system

12) Vehicle( Land cruiser)

13) Building electrical system

14) Telephone system

15) 6 units 167 KVA, 23 KV Transformers

16) Circuit Breakers and Electrical Protective Devices

. Undertakes daily inspection of water and electrical supply,

paging system, telephone system sewer line and drainage

system and undertakes repair if needed.

. Prepares Budget proposal for the Building Maintenance uses for

approval of Finance Department.

. Undertakes daily inspection of water and electrical supply,

paging system, telephone system sewer line and drainage

system and undertakes repair if needed.

. Performs such other functions/duties assigned by higher

supervisor

Assistant Building Administrator

June 1988 to May, 1989

Strategic Investment Development Corporation

Maharlika Livelihood Center

Baguio City

Duties and responsibilities:

. Have been task to inspect all section of the building

including immediate

premises to determine areas for improvement/maintenance

and repair. And

to prepare report and recommendations to improve or

repair

areas/facilities found to be defective.

. Prepares Electrical designs containing Transformer layout,

Circuit breaker lay out, Load schedules and specifications,

Scope of work and cost estimates for the improvement or repair

of the Complex 3 Phase Power and Lighting System.

. Prepared Electrical Design/estimates and Scope of work for the

Fastfood Area with 32 stalls, Dishwashing area with heaters.

. Prepares Civil works, Plumbing works, Carpentry works

designs, scope of work and cost estimate for the repair and

improvement of the Complex

. Supervises the proper implementation of repair and improvement

of the Complex in Electrical, Civil, Mechanical, Plumbing and

Carpentry works

. Have been in charge in the monitoring compliance of tenants

with the building rules and regulations.

. Identified and requested supplies, tools, equipments needed to

render

efficient services.

. Supervised the proper performance of Janitorial and Security

Services

. Led and Supervise the Proper and efficient delivery of

services/repairs of

Maintenance personnel

. Made sure that Utilities such as water, electrical system,

paging

system, telephone system, sewer and drainage system are

in working

conditions

. checked electrical billing submitted by the general services

section before forwarding it to accounting .

. Provided individual water and electric meter to tenant s who

are paying on flat rate basis.

. inspected, verify and certify completion of construction,

installation and services rendered by outside

parties/agencies

per specification of contract and or purchase job order

concerning maintenance.

. Performed other functions which may be delegated or assigned

from Time to time.

Industrial Electrician

May, 1986 to June, 1988

Borromeo Engineering,

Kayamg st. Baguio City

. Has Undertook Electrical wiring installation of contracted

Residential and Industrial establishments such as Texas

instruments, Hospitals and Laboratories.

. Undertook repairs of Electrical Equipments such as motors,

Dishwashing Machines and other electronic/electrical

equipments.

OTHER PROFESSIONAL SERVICES RENDERED

. Supervised the installation of wiring system for 32 units

Fast Food stalls.

. Supervised the installation of 3 units 167kva/23 kv

transformers.

. Supervised the dismantling and transfer of 3 units

distribution transformers.

. Supervised the load balancing of a Commercial complex.

. Supervised the Installation of addressable Fire alarm system.

. Supervised the installation of Paging system.

. Supervised the Installation of 2oo pair inhouse telephone

system.

. Electrical Design for Both Power, Lighting and Signal for

a 15 storey School

and Library building with 3 Phase power source

. Electrical Design for a 2 Commercial Building having 3

Phase Power source.

. Design and Implementation of Electrical power and lighting

of at least 20

Residential Houses.

. Design of Telephone system for a commercial complex

. Installation of Signal Enhancement Omni Directional

Antennas (43 units)

. Design of Building Ventilation system

OTHER SKILLS

Proficient in the use of Microsoft Word, Excel, Power Point, Internet

Explorer., electronics,

Knowledge in Civil works such as Rebars, Carpentry, plumbing and Masonry

Knowledge in Mechanical works, Report writing and Document Preparations

such as Bid documents for Janitorial and Security, Bid Documents for work

to be undertaken by contractors. Driving skill

PERSONAL REFERENCES:

Date of Birth : January 6, 1960

Place of Birth : Baguio City,

Philippines

Sex / status ; Male, / Married

Language/ Dialect: : English, Tagalog and

Ilocano

UAE Address : Al Rigga St. Deira, Dubai

UAE Tel. Numbers : 050-***-****

Philippine Address : 32 Upper Fairview, Baguio City,

Philippines

Philippine Tel No : o74- 445-5666

EDUCATION & QUALIFICATIONS

1990 Passed Board exam for Electrical Engineer/ Licensed Electrical

Engineer

1986

Saint Louis University

Completed my Bachelor of Science in Electrical Engineering

1980

Baguio Electronics and Technical Institute

Completed my Certificate in Communication Technician

1977

Saint Louis Boys High School

High School Diploma



Contact this candidate