Objective: Challenging career in project management/cost estimation to

employ my expertise with potential growth.

Career Summary: Asst. Project Manager, Office Engineer and Cost Estimator

with more than 7 years of experience performing cost estimates and value

engineering for residential, commercial, and transportation projects,

including rail, roadways, bridges, and ports. Familiar with all aspects of

cost engineering, with experience in performing cost analyses; preparing

submittal packages, quantity take-offs, organizing billing processes; and

overseeing subcontractor requisition. Has an experience in preparing as-

built, maintaining document control and various logs for submittal,

materials, production quantity, drawings and RFI. Also review project

drawings and specifications, perform quality assurance/quality control

(QA/QC), and coordinate between multiple disciplines to meet construction

schedules.

Personal Skills:

. Routine Office Engineering, Project Management and Cost Estimating.

. Organizational, analytical & technical skill.

. NYSDOT Office Engineer's Manual.

. Plan and schedule review.

. Quantity take off, surveys and change order analysis.

. Document control system.

. Field inspection to comply with the contract documents.

. Project Management and Administration on construction project.

. Project Coordination and Implementing Schedules.

Technical Skills: Cost Estimating, Cost Management and Project Controls,

AutoCAD 2009, NJTA CapEx,

MS Project, Primavera P3, SureTrak 3.0 and MS Office 2007.

Software: - eCMS - Web-based construction management software provides real-

time information along with financial applications and productivity tools.

The productivity feature monitors job costing; personnel; operations;

equipment and construction project management. eCMS allows viewing

information online for production report, payroll, billing, service request

purchasing and inventory.

Deltek Sema4 - Sema4 was most flexible software for managing construction

management and engineering profession. The software offers a complete

solution to time, billing, accounting and project management needs.

Clearview- InFocus Software - Project Management, Marketing, and Accounting

Software.

HCSS - HCSS specializes in construction estimating and field management

software for heavy highway construction.

Experience:

Top - Ranked, highly regarded client responsive professional engineering,

survey and construction management Firm - As an Asst. Project Manager /

Office Engineer responsible for review and processing submittals - shop

drawing, material and catalog cuts, review monthly payment requisition to

clients for accuracy and budget constraints, Verify actual costs against

estimates, Review construction change orders and process computer records.

Prepare sub- consultant agreement on time and keep track of insurance

certificates, review sub-consultants costs, change orders and payment

requisitions, perform cost evaluation and bid analysis of various for Essex

county project, Estimate take off quantity using unit-cost approach and

developed the detail cost estimated from plan sheets and verified with bid

quantity. Also assist with construction contract management, compile

construction close-out documents under supervision of Director of

Construction, prepare As-Built quantity and drawing based on Inspector's

report for various items, provide construction inspection services as

required, review construction inspection (CI) personnel time sheet reports

for accuracy, maintain & monitor CI personnel's certification matrix & log,

assist CI personnel for the review of daily reports and construction

payment estimates. Assist marketing department in researching and preparing

new opportunities for construction management and inspection services.

(05/09 - Present)

D'Annunzio & Sons, Inc. - Asst. PE / Cost Estimator / Office Engineer -

(07/04 - 03/09)

12 Final Improvements, Carteret, NJ - This $80M project included excavation

and backfilling with Grade A and Grade B material, demolition of an old

utility building and construction of a new utility building, construction

of additional toll booths, and a new bridge with new ramps and piers. The

project also consisted of redesigned roads, retaining walls, streetscape

walls, new intersections, and utility relocation and installation.

PANYNJ SIRR North Connection to Chemical Coastline (Elizabeth, NJ) - This

$40M project included excavation, pile driving, bridge construction with

new piers and abutments, bridge pier rehabilitation, removal of existing

railway track and installation of new railway track, and new road work with

drainage and guide rails. The project aims to connect rail service between

Staten Island, NY, and the nation's rail network through Elizabethtown, NJ

and to enable the shipment of international cargo containers, municipal

solid waste, and other industrial freight currently transported by truck

thru new railway line.

PANYNJ New Wide Load Truck Parking Area (Goethals Bridge in Elizabethtown,

NJ) - This $2.25M wide load truck parking lot project in Elizabethtown, NJ

included excavation, backfill, grading paving, and lighting of the site.

As cost estimator provided take off quantities and cost estimates for

concrete and steel structures, piers, abutments, roadways milling - paving,

utilities, and site-excavation. Reviewed, prepared and maintained

submittals and utilities, and site-excavation. Compiled cost information

and prepared production reports by entering production quantities from

Forman's reports in cost system using eCMS software. I documented all extra

(T&M) work from submitting work orders to payment application and then

providing information on queries from auditors during audit for extra work

(T&M) audit report. In order to perform cost analysis actual costs were

determined using union labor wages with taxes, fringes and benefits,

equipment rental blue book rates for equipment rental cost, actual material

and subcontractor cost and then Verified against estimated cost

(quantities) for labor, materials, equipment, tax, insurance and

subcontractor's cost as project moves ahead.

As an Asst. Project Engineer / Office Engineer reviewed plans,

specifications and utility drawings. Prepared, reviewed and processed

change orders, payment requisition, submittal packages, and RFI's for

timely response and approval from engineers and owner. Ordered / Released

Materials for job site and ensured their availability with efficient

utilization. Prepared and maintained various logs for tracking shop

drawings, contract drawing and documents, submittals, RFI'S, change orders,

production quantity and material, pile driving logs as determined necessary

for a project completion on time within contracted budget and time.

Assisted in finalizing sub contractors by reviewing their bids and reviewed

and processed subcontractors work orders/change orders and their payment

applications. Acquired all close out materials including warranties, as-

built, and the final payment application on completion of work from sub

contractors. I was responsible for organizing and maintaining project

records per organization's record keeping procedure and reviewing foremen

report for proper coding, preparing and submitting field work order for

contract work and extra work as well. Maintain all underground utilities by

scheduling regular NJ One Call Mark out requests for construction area.

Periodic site walk to monitored jobsite construction progress and safety

issue supervising labors and subcontractors. Identified deficiencies and

expedite immediate corrective action and generated progress photograph on

job site. Physically measured as-built quantity prepared as-built drawings.

Created punch list for completed sections of the project and worked on

these items to be repaired then inspected to close out the project.

Parrello Inc.; Hopatcong, NJ - PANYNJ Howland Hook Marine Terminal Pavement

Rehabilitation, Howland Hook Marine Terminal, Staten Island, NY Asst.

Project Engineer - The scope of work in this $5M project included was

milling and paving around the weighing station and replacing the concrete

pads from entry to exit of the weighing station at Howland Hook Marine

Terminal.

As Cost Estimator Coordinated with multiple disciplines, suppliers, and the

client for quantity takeoffs, cost estimates, and value engineering.

Performed quantity takeoffs using CSI Format and prepared and summarized

estimates. Analyzed and performed cost analysis to assist PE in identifying

sub contractors. Performed cost evaluation of projects using HCSS Heavy Bid

for review.

An Assistant Project Engineer performed preliminary site investigation and

feasibility studies, reviewed drawings plans and specifications to develop

criteria on new work. Attended project site pre bid meetings, site tours

and post -bid reconciliation meeting as required. Reviewed, tracked and

processed submittals for materials and shop drawings to get approval on

time. Inspected, anticipated and coordinated the flow of construction in

order to meet projected schedule. Supported PE obtains bids from qualified

sub-contractors, oversee sub-contractors payment requisition, completing

the contract within schedule and on time and organized billing process for

clients and responded to their queries. (02/04 - 06/04)

Superior Consultants, Inc.; Brooklyn, NJ - Served as project inspector on

various projects throughout New York City. Executed compaction and

laboratory soil analyses and performed tests using a Nuclear Density Gauge

to determine adequacy of strength of foundation and asphalt. He performed

on-site inspection and QA/QC testing for concrete, mortar, and grout using

air entrap gauges and Flow Cone and Windsor tests probes. Inspected pile

driving and pinning, examined reinforced steel structures to conform to

design drawings, and inspected structural steel and joint welding using

torque range and Contour probes. (2/03 - 7/03)

Education: MS Construction Management; Stevens Institute of Technology,

Hoboken, NJ; GPA-3.90/4.0; (2004)



Contact this candidate