Reginald A. Winfrey *** Columbia Place
Torrance, CA. 90501
HM: 310-***-****
CELL: 310-***-****
*******@*****.***
Work summary & Qualifications:
I currently have over 13 years of experience in the scheduling field. I have worked as a Program Scheduler for several fortune 500
companies. I am knowledgeable of EVM (Earned Value Management) processes and I have worked with cost analysts to implement
EVM processes as it relates to scheduling. I have successfully implemented Integrated Master Schedules created from Integrated
Master Plans for a majority of my career. Commercial programs that I have supported include DIRECTV, Sirius Radio, and XM
Radio. Government schedule support includes NASA’s SOFIA (Stratospheric Observatory for Infrared Atmosphere) program, Global
Hawk UAV (Unmanned Air Vehicle), and different navigational systems for the United States Navy. Customers whom I have provided
joint schedule support include: Lockheed Martin, BAE Systems, and Raytheon in Texas.
Professional Experience:
BAE Naval Shipyard 12/10 to Present
Production Scheduler
Primary production scheduler for the USS Princeton Guided Missile Carrier. Provides s chedules and plans production work orders
to support master production schedule. Attends production status meetings for each product line to ensure that schedules are
accomplished or rescheduling is correct and complete. Provides production status to management. Analyzes impact of incoming
Engineering Change Orders.
NASA, Dryden Flight Research Center, Edwards AFB, CA (Contract) 11/09 to 07/10
Master Scheduler
Primary focal point and lead scheduler for Program Managers to develop, integrate, maintain and analyze plans for schedules that
support program requirements for the SOFIA (Stratospheric Observatory for Infrared Atmosphere) Program at NASA’s Dryden
Aircraft Operations Center in Palmdale. Duties include provision of detailed schedules or program office master schedules using
scheduling tools i.e. MS Project. Responsible for producing various schedule analyses such as CPM (Critical Path Methodology),
EVMS (Earned Value Management) formatting views, IMP (Integrated Master Plan), IMS (Integrated Master Schedule) and charts
created through the use of Milestone Professional. Primary schedule support for the Global Hawk UAV (Unmanned Air Vehicle)
program at Dryden Flight Research Center at Edwards AFB. Worked directly with the Project Manager, Payload Systems Lead, and
Aircraft Crew Chief to construct the GRIP schedule for the Global Hawk project.
DRS Technologies, Inc., Cypress, CA. 12/06 to 07/09
Master Scheduler
Primary focal point for Program Managers to assist in the development, integration, maintenance and analysis of plans and schedules
that supported specific program requirements. Responsible for creating detailed schedules or program master schedules using
scheduling tools i.e. MS Project. Assisted in implementing methods such as IMP (Integrated Master Plan)/IMS (Integrated Master
Schedule) which was instrumental to the introduction of EVM (Earned Value Method). Conducted various analyses such as CPM
(Critical Path Methodology). Ensured weekly status meetings were conducted.
Boeing, Long Beach, CA. (Contract) 05/06 to 12/06
Master Scheduler
Primary focal point for Project Managers to assist in creating schedules derived from discrepancy reports regarding the C 17 Aircraft
Program. Responsible for schedules in the CMS (Configuration Management System) packages to be viewed at weekly IPR’s. Focal
point for all management directed schedule projects. Provided slides for monthly scheduling briefings to department manager.
Implemented weekly schedule statusing for Program Managers and Engineering Leads.
Los Angeles Unified School District in Los Angeles, CA. (Contract) 03/06 to 05/06
1 of 2
Reginald A. Winfrey 703 Columbia Place
Torrance, CA. 90501
HM: 310-***-****
CELL: 310-***-****
*******@*****.***
Master Scheduler
Primary focal point for building and maintaining of all the IMS schedules. Developed fully integrated network schedules while
using best practice for implementation of schedule techniques used for construction of schools, LAN Systems, and WAN Systems for
public schools throughout the Los Angeles. Assisted in creating a standard network scheduling format.
Northrop Grumman in Los Angeles, CA. 02/05 to 10/05
Master Scheduler
Primary focal point for building and maintaining the IMS (Integrated Master Schedule). Developed full integrated network schedules
while using best scheduling practices for implementation and deployment of EVMS (Earned Value Management System). Provided
weekly status to IPT (Integrated Product Team) Leads.
Sargent Fletcher in El Monte, CA. 09/04 to 02/05
Master Scheduler
Primary focal point for IMP (Integrated Master Plan) and IMS (Integrated Master Schedule) initiation. Focal point for all
management directed scheduled projects. Responsible for building and maintenance of the IMS. Provided weekly & monthly status
updates for external customers. Ensured that forecast status was briefed to all IPTs and Program Managers. Active participant in IBR
(Internal Baseline Review) process. Implemented “Best Practices” scheduling document.
Raytheon Space and Airborne Systems, El Segundo, CA. 11/03 to 07/04
Senior Scheduler
Responsible for weekly presentation of schedule status. Primary focal point for IMP (Integrated Master Plan) and IMS (Integrated
Master Schedule) initiation. Responsible for building and maintaining IMS schedules. Provides weekly & monthly status for EVMS.
Ensured that forecast status was briefed to all IPTs and Program Managers.
Northrop Grumman Navigational Division, Woodland Hills, CA. 04/02 to 10/03
Master Scheduler
Responsible for building, maintaining, and statusing schedules used in the production of navigational instruments for the Department
of Defense Aircraft through the use of MS Project. Focal point for all management directed scheduled projects. Provided briefings on
a weekly basis to technical management to address performance to plan and schedule status. Performed Critical Path Analysis.
Boeing Satellite Systems, El Segundo, CA. 05/00 to 10/01
Product Group Scheduler
Responsible for the implementation and maintenance of 20 schedules to be updated on a weekly basis. Responsible for building and
maintaining Aerospace Programs schedules through the use of MS Project for Boeing Electronics Product Group and Supply Chain
Management. Provided briefings to technical management to address performance to plan vs. actual schedule status for assigned
schedules.
Bowne of Century City, Los Angeles, CA. 05/99 to 04/00
Administrative Assistant/Scheduler
Responsible for maintaining active schedules of all jobs in progress with the use of MS Project. Facilitated the continual flow of
communication regarding account and client contacts the use of BMS (Bowne Marketing System). Assisted Sales representatives in
the job quote process which included the submission of proposals for potential contracts. Coordinated all meetings, special events
and travel for Sales Representatives and clients.
2 of 2
Reginald A. Winfrey 703 Columbia Place
Torrance, CA. 90501
HM: 310-***-****
CELL: 310-***-****
*******@*****.***
Raytheon Information Systems, El Segundo, CA. (Contract) 08/97 to 11/98
Business Analyst/Master Scheduler
Developed and maintained detailed schedules through the use of MS Project for Space
Satellite Programs. Analyzed work request for impact on current schedules integrated into
production schedules and ensured proper schedule traceability form a Integrated Master
Plan (IMP) though the Integrated Master Schedule (IMS). Conducted weekly meeting
status.
Computer Skills:
MS Project (2003 & 2007), MS Project Server, MS Project Link, Primavera 3e, MS Suite (Word, Excel, PowerPoint, Access),
Milestone Professional, Boeing E.S.S. (Enterprise Scheduling System), Windows Explorer, Lotus Notes, Internet
3 of 2