Post Job Free
Sign in

Engineer Design

Location:
Aurora, IL, 60506
Posted:
May 18, 2011

Contact this candidate

Resume:

JAMES F. BELL

**** ********* ****

West Chicago, IL. 60185

312-***-****

**********@*****.***

SUMMARY

CAD engineering and design with extensive technical experience in:

Microstation and AutoCAD (2D and 3D)

Transportation Design

Civil Design

Utilities Design

Cellular Design

Telecommunications Design

PROFESSIONAL EXPERIENCE

THE Partnership, Newark, NJ.

2010

Joint Venture - Parsons Brinckerhoff, AECOM and STV (ARC Tunnel Project:

Trans Hudson Express Passenger Rail Tunnel)

CAD Engineer

Signals, communications, traction power, overhead contact system; systems

integration, submittals and training

. Signals: Designed track circuits, insulated joints, wayside signals,

signal bridges; CIL houses, high single and high double cases, vaults,

communication huts, cable trays, cable troughs and underground cables.

Located switches and crossovers (#15 and #20 turnouts). Created detailed

plans of typical signals, cases, vaults, signal/communication cable

trays/troughs; control lines and aspect charts. Total number of

interlockings was eleven and total number of switches was ninety-six.

. Communications: Identified both demolition plans and new location plans

for CCTV (fixed and pan-tilt-zoom), public address speakers, access

control, TVM, various types of phones (PP, PIT, BL and maintenance), as

well as; fire alarm system equipment for the new ARC Tunnel platform at

Frank R. Lautenberg Station (Secaucus). Assisted in the maximum CCTV

coverage exhibits for NJ Transit in all the tunnels and at Manhattan 34th

Street station.

. Traction Power: Created equipment layout plans and cross sections

consisting of substations, transformers, switchgear, switch heaters,

wayside embedded conduit/duct bank runs and communication/electrical huts

at key interlockings.

. Overhead Contact System: Supported designs by locating foundations and

poles system wide.

. Systems Integration: Created system architecture interface schematics

for Frank R. Lautenberg Station, Twelfth Avenue fan plant, Dyer Avenue

fan plant, 33rd street fan plant; 35th Street plant, Manhattan 34th

Station, as well as; tying ARC Tunnel interfaces to the Portal Bridge

over the Hackensack River.

. Finalized submittals for both internal review and NJ Transit review (60%

level).

. Trained and assigned design tasks to college interns.

. Created general notes and symbols sheets, key plans, plan and profile

sheets, cross sections, cut sheets and typical details. Adhered to design

standards set by project management team and utilized numerous reference

files from other pertinent disciplines within "THE Partnership" via

'nesting' for all production to minimize interference.

. Customized Microstation V8 2004 Edition 'workspace' to accommodate

customized pull down pallet tools and symbol/cell libraries for design

team consistency.

T-Mobile, Downers Grove, IL.

2009

Cellular

CAD Engineer

Cellular switch sites central region

. Created and maintained sixteen switch sites using AutoCAD 2008 for the

entire central region. Each site consisted of equipment floor plans,

fiber ducts, cable trays, batteries; bus duct, auxiliary framing,

security, grounding, single line diagrams and power plans.

DB Sterlin Consultants, Inc., Chicago, IL.

2008

Engineering

CAD Designer

AT&T U-verse sites within City of Chicago limits

. Designed new AT&T VRAD site plan details. Plans consisted of existing

ROW, back of curb, sidewalks, buildings; fences, light poles, signs,

trees, locality map, job summery and utilities. Utilities consisted of

fiber optic cables, utility poles, water, sewer; gas, electric, manholes,

catch basins and inlets.

. Customized Microstation V8 2004 Edition 'workspace' to accommodate

customized pull down pallet tools and symbol/cell libraries for design

team consistency.

Patrick Engineering, Lisle, IL.

2005-2008

Utilities and Civil

CAD Designer

Substations, 3D cofferdam and 3D natural gas well model

. Designed substations for AEP, ComEd, First Energy, PG&E and OG&E using

AutoCAD 2006, GTX, Microstation V8 2004 Edition/XM and I/RAS B. Plans

consisted of single line and 3 line wiring diagrams, grounding detail,

switches, transformers, MOAB, RTU and SCADA.

. Designed a 3D model of a cofferdam using Microstation XM to protect

future erosion of pillars for Interstate Route 64 Wabash River Bridge.

Created an animated sequence model of the cofferdam. The Patrick team

then used this model by giving a presentation to IDOT showing how the

phasing of the project would commence.

. Created a 3D PDF surface model and cross sections for 86 natural gas

wells by compiling approximately 2000 points varying in depths up to 8100

feet deep which had up to 36 different elements/materials by using

Microstation XM and InRoads. Wells are located in the state of Colorado.

. Customized Microstation V8 2004 Edition 'workspace' and ProjectWise to

accommodate customized pull down pallet tools and symbol/cell libraries

for design team consistency.

Parsons Brinckerhoff, Chicago, IL.

2004-2005

Transportation

CAD Designer

Switch heaters, pedestrian crossings and high speed rail upgrade

. Designed switch heater controls and indications at several control points

on the Metra Electric District Line to prevent build up of snow and ice.

. Designed 3 new pedestrian crosswalks for the new Metra National Street

station in Elgin between B35 and east Elgin control points.

. Designed several railroad crossings by upgrading them from a 2 gate to a

quad gate configuration to accommodate 110 mph train operations.

AECOM (DMJM+HARRIS), Chicago, IL.

2002-2004

Transportation

CAD Designer/Network Administrator

Railroad extension, new stations, new switch yard, switch heaters; proposed

track alignment, preliminary engineering and highways

. Finalized Microstation files for bid set submittals on the Metra Union

Pacific West Line extension from Geneva to Elburn. Design was a 6 mile

triple track design including 1 highway over pass, 1 highway under pass,

2 new stations and a new switch yard.

. Designed gas fired switch heaters and backup generators throughout Metras

service territory to prevent build up of snow and ice. In 2004 (per the

request of Metra), I continue work on this task as a consultant to AECOM

while being part time at Parsons Brinckerhoff.

. Created track alignments with plan and profile sheets, aerial photos and

cross sections for the proposed Metra Star Line. Plans were a part of a

study evaluating the feasibility and alternative analysis to implement

the proposed commuter rail service from Joliet to O'Hare International

Airport.

. Created an underground profile of the existing city sewer lines at

Chicago Union Station consisting of highest points of survey for track

clearance. The main focus on this project included track beds being

rebuilt due to having sunk becoming unstable over numerous years of

service.

. Updated plan and profile sheets. Design for IDOT was the IL. Route 47

improvement project whereby widening the highway from 2 lanes to 4.

. Upgraded and maintained Microstation V8, GEOPAK and Windows XP on all CAD

workstations. Server backup both full weekly and incremental daily.

Advanced Surveying and Mapping, Batavia, IL.

2001-2002

Cellular

CAD Designer

Surveys and engineering packages for cellular sites

. Designed A.L.T.A. surveys and traditional boundary surveys for Nextel,

Sprint, Cingular Wireless, PrimeCo; Crown Castle and Spectra Site.

Surveys consisted of monopole cellular towers, equipment shelters, ice

bridges, utility easements; access easements, proposed lease sites, co-

location lease sites, existing lease sites, contour lines, boundaries,

ties to boundaries, bearing and distances, azimuths, benchmarks, square

footage, deeds, legal descriptions, quadrangle, magnetic north,

buildings, roads, sidewalks, water and dimensions.

. Designed engineering packages for Nextel. Packages consisted of site

plan, earthwork, pavement, grading plans; site details, structural notes,

equipment enclosure buildings with foundations, tower details, tower

foundation detail, antenna mounting details, utilities, grounding plans

and electrical details.

LTK Engineering Services, Chicago, IL.

1993-2000

Transportation

CAD Manager/Network Administrator

CAD operations management, light rail transit substations, transit

stations, 3D animation and computer networking

. Managed 15 CAD designers daily ensuring work was accurately completed to

meet client specifications on the CTA Green Line rehabilitation and the

CTA Harrison Curve projects.

. Designed CTA substation schematics for the CTA Green Line rehabilitation

project.

. Designed track layouts and parking facilities for the proposed Metra 93rd

Street station.

. Created a 3D animation for Septa by designing an ADU for the existing

light rail cab cars.

. Upgrade computers, wide area network and implemented ltk.com internet e-

mail via ccMail SMTP gateway.

Bruce G. Moffat, Chicago, IL.

1991-1993

Author and Historian - Transportation

CAD Consultant

Historic track alignments (publisher CERA)

. Designed track layouts and station locations throughout the Chicago

Transit Authority's history. Designs are a part of Mr. Moffat's 306 page

book; 'The "L". The Development of Chicago's Rapid Transit System, 1888-

1931'.

SYSTRA Consulting (LSTS), Chicago, IL.

1991-1993

Transportation

CAD Technician

Interlockings, overhead catenary and RAILSIM marketing material

. Designed track and signal configurations for Metras Ogilvie

Transportation Center rehabilitation, Chicago Northwest Junction

rehabilitation and the bi-directional signaling system rehabilitation on

the Union Pacific North Line.

. Designed B-12 interlocking for Metras new North Central Service to

Antioch.

. Designed overhead catenary for trolley bus routes on Mission Street in

San Francisco CA.

. Created marketing video highlighting RAILSIM software.

. Setup CAD workstations for a new office in Jacksonville FL. (client CSX).

AT&T, Schaumburg, IL.

1989-1991

Civil

CAD Technician

Civil maps and dBase interface

. Designed civil maps to include lot dimensions and parcel information for

various cable television providers.

. Setup Microstation to export parcel information to dBase IV.

EDUCATION

College of DuPage, Glen Ellyn, IL.

1988-1990

2 year program studying CAD by learning Intergraph/Microstation (2D and

3D).



Contact this candidate