GREGORY BYRON
BRANCHBURG, N. J. 08876
********@***.***
RESUME
OBJECTIVE:
Seeking a challenging, responsible, and rewarding position in the
facilities maintenance field. I will utilize a solid background of
experience and expertise for a position which offers a stable career
environment with opportunities for growth and advancement.
EXPERIENCE:
Offering comprehensive practical professional experience and expertise in
the following areas of responsibility:
* Supervising facilities maintenance personnel on all levels, ability to
motivate, and work well with all crafts to meet completion dates;
* Working in all phases of multi-craft installation in both construction
and maintenance;
* Handling tough jobs, and meeting deadlines, in all kinds of work;
* Investigation and troubleshooting problems on all levels;
* Estimation, Planning and Scheduling;
*Ordering Material and Tools and Billing;
*Safety
STRENGTHS:
Excellent communications, organizational, and analytical skills, able to
motivate and interact with people on all levels, highly self motivated and
self disciplined, can complete complex assignments on time, thorough and
precise in attention to detail work, solid background in all phases of
maintenance work, tireless worker, dependable and diligent.
EDUCATION:
Union County College Associates Degree 1980
Montclair University Bachelor of Arts 1982
EXPERIENCE HIGHLIGHTS:
July 12, 2008 to December 18, 2009, Facilities Supervisor/Planner, K-11
Area Maintenance, Merck / Schering-Plough Corp. Global Engineering
Services, Global Supply Chain, Kenilworth, NJ
June 12, 2007 to July 12 2008, Maintenance Supervisor, K-2 Maintenance,
Manufacturing and R&D, Schering-Plough Corp. Kenilworth, NJ
March 27, 2007 to June 12, 2007, Electrical/ Hvac Maintenance Planner,
Schering-Plough Corp. Summit, NJ
June 12, 2006 to March 27, 2007, Multi-craft Mechanic / Electrician,
Schering-Plough Corp. Summit, NJ
1980 To 2006, Journeyman Electrician / Electrical Supervisor/
Superintendent, Facilities Maintenance Supervisor Spencer Electric Co.
Inc., Somerset, N.J., 08873
(Project Highlights)
2006 Electrical, control and alarm installation of new high sulfur top
load hydraulic platform at BP truck loading rack, Carteret, N.J.
Electrical and control installation for new dolphin capstan at BP dock
facilities.
2005 Electrical and control installation of Lubrizol gasoline and ethanol
blending process at BP truck loading rack, Carteret, N.J.
Electrical and control installation of Lubrizol low sulfur fuel oil
lubricity additive process at BP truck loading rack, Carteret, N.J.
Electrical installation of new 4160v aerial feeder to step down 480v
transformer for pumps at new 100,000 barrel storage tank 96. Installation
of new starters for motors and controls all piping and subfeeders, BP
Terminal Carteret, N.J.
Electrical, control and alarm installation at new waste water plant, Kinder
Morgan Inc. Terminal, Carteret, N.J.
New plant wide fiber optic cabling installation, KMI Facility, Perth Amboy,
N.J.
2004 Terminal security systems upgrade including lighting, cameras, gates
and alarms as per Homeland Security at BP terminal, Carteret, N.J. Worked
with Navco Systems.
Installation of new tank dike, intrinsically safe, sump pump systems at BP
Terminal,
Carteret, N.J.
2003 Upgrade of Storage tank high level alarms and Varec gauging systems .
BP and KMI. Terminals, Carteret, N.J.
New BP office computer intranet networking systems installation, cat5e
cabling and equipment hook up. Carteret, N.J.
2002 Electrical installation of Accuload and TAS intergrated plc controlled
truck loading system at BP Terminal . Carteret, N.J.
2001 Installation of all electrical systems for barge loading including
vapor recovery system at BP-Amoco dock cell#6.
2000 Construction of new 4160v substation at Amoco dock facilities,
Carteret, N.J.
1999 Installation of plant wide Pyrontronics fire alarm and evacuation
system, Amoco Terminal,
Carteret, N.J.