Post Job Free
Sign in

Engineer Engineering

Location:
Houston, TX, 77094
Posted:
June 01, 2011

Contact this candidate

Resume:

Address: Taylor Brook CT

Houston, Texas (*****)

Cell Phone: +994 (55) 5111238

E-Mail: ****.********@*******.***

Anar Khalilov

Objective I am a USA permanent resident (Green Card holder) and I am

planning to permanently move to Houston with my family in

July, 2011. Skills and experience that I gained working with

BP can make me a qualified candidate for Drilling Engineer

position in Houston, TX.

Professional December 2010 - Present BP Exploration (Caspian Sea)

Experience LTD

Drilling Engineer (ShahDeniz Wells Team - HPHT)

Provide detailed well engineering planning and assurance.

Analyze offset well history and problems encountered.

Developed drilling program (for HPHT well) and rig work

instructions reflecting procedures and problem mitigation for

each hole section.

Evaluate new drilling equipment and procedures to reduce cost

and increase drilling efficiency.

Prepare probabilistic well cost estimates and AFE.

Prepare risk assessment and mitigations (Loss circulation

strategy, wellbore stability, casing wear mitigation, hole

cleaning, wellbore strengthening technique, plan for

contingency casing strings).

Coach and train less experienced team members.

April 2009 - December 2010 BP Exploration (Caspian Sea)

LTD

Drilling Engineer (DDGG Subsea Wells Team)

Designed detailed drilling programs for subsea injector

wells.

Ensured that drilling program is in compliance with Company

policies, standards and procedures.

Interacted with reservoir, geology and production departments

for optimizing the well design.

Prepared Cementing Basis of Design for Chirag Oil Project.

Prepared contingency casing Cut & Pull (Slot Recovery)

program.

Annulus Pressure Build up analysis and mitigation plans.

Prepared end of well reports for the executed wells.

Prepared detailed risk assessment and shallow hazards

mitigations.

Identified and scheduled the long lead item equipment

procurement.

Provided engineering support throughout the operations phase

and ensured the proper implementation of drilling program:

Carry out full engineering analysis of the data obtained from

rig site

Perform engineering calculations (T&D, hydraulics, cementing

etc)

After action reviews / lessons learned

July 2007 - April 2009 BP Exploration (Caspian Sea)

LTD

Drilling Engineer (Chirag Platform Wells Team)

Planned drilling programs for ERD well, Sidetracks (Whipstock

and Cut & Pull) and assisted planning and execution of

Whipstock Conductor Driving Project (Deep Drive III).

Interfaced with other drilling/completion specialists,

reservoir development team, operations personnel and HSE as

required to ensure drilling activities are consistent with

well objectives.

Prepared and maintained lessons learned database and EOW

reports.

Offset well data review. Casing design and casing seat

selection.

Conducted pre-spud meetings with the crew.

Physically witnessed readiness of critical equipment prior

mobilization.

March 2006 - July 2007 BP Exploration (Caspian Sea)

LTD

Offshore Drilling Engineer (Chirag Platform Wells Team)

Provided onsite drilling engineering calculations (Torque and

Drag Hydraulics, Cementing Volumes, Pipe Tally, etc).

Wrote daily drilling reports (DIMS).

Participated in developing rig action plans.

Conducted pre-spud meetings.

Assisted in preparation of End of Well Reports.

Education 2003 - 2005 Azerbaijan State Oil Academy

MS Degree in Construction of Offshore Oil & Gas Facilities

Petroleum Engineering Department

1997 - 2001 Azerbaijan State Oil Academy

BS Degree in Construction of Offshore Oil & Gas Facilities

Petroleum Engineering Department

Skills Languages:

Azerbaijani - Native

English - Fluent

Russian - Fluent

Computer & Software Skills:

MS Windows and Office Applications: Excel, Word, Power Point,

Project, Visio.

Landmark Drilling Applications: Open Wells (DIMS), Well Plan,

Stress Check, C-Wear, Compass, and Crystal Ball -

Probabilistic Time & Cost Estimation tool.

Technical HPHT for D&C

Training History Engineering Excellence with Well Plan

Managing Hole Problems

IADC WellCAP Drilling Well Control

Casing Design (Chevron Texaco)

Completions Design

Drilling Fluids (Chevron Texaco)

Drill String Design & Failure Prevention (Chevron Texaco)

Casing Running Master class

Environmental Management for D&C

Heriot Watt Reservoir Engineering 1 (Heriot Watt University)

Sand Control

Heriot Watt Production Technology 1 (Heriot Watt University)

Fishing and Sidetrack Operations (Chevron Texaco)

Heriot Watt Petroleum Geoscience (Heriot Watt University)

Drilling Engineering & Well Planning (Chevron Texaco,

Houston)

Heriot Watt Drilling Engineering (Heriot Watt University)

Drilling Practices (Chevron Texaco, Houston)

Directional Drilling & Surveying (Chevron Texaco)

Cementing Practices (Chevron Texaco)

References Available upon request



Contact this candidate