Post Job Free
Sign in

Project Manager Engineer

Location:
Clovis, CA, 93619
Posted:
June 10, 2011

Contact this candidate

Resume:

RAFAEL G. GONZALES

**** ****** ***. ******, ** **619

***/***-****

********@*****.***

OBJECTIVE

A position as Outside Plant Engineer

RELATED EXPERIENCE

• Design, manage and implement construction of System Integration,ISP,OSP

FTTP/Copper projects

Manage and implement construction of Next Generation Network (Copper and

Fiber Optic) projects, CELL site construction

• Manage and implement construction of ISP, System Integration, HSPA and

Wimax projects

• Installed and maintained Ericsson and Alcatel switch

Professional Profile

• Highly organized and dedicated, with a positive attitude

• Able to handle multiple assignments under high pressure and consistently meet

tight deadlines

• Have excellent, oral, written and interpersonal communication skills

• Thrive on working in a challenging environment.

EMPLOYMENT HISTORY

Project Manager/Consultant for FOC and cell site projects, Ragon Ventures Corp.,

Manila Phils., 2007 to present

• Advised the client on best methods in implementing the construction of the OSP

involving civil works, Fiber and copper cable laying and cell site construction

• Perform project cost analysis, budget review and make the necessary

recommendation

Field/Design Engineer, WELLSCO INC., California Office Sept. 2007 to Dec. 28, 2008

• Conduct Site Survey and take measurements of existing Outside Plant

Facilities,Design new path or route for the Feeder and FTTP cabling.

• Check and verify Right of Way, inspect and survey existing substructures and

design new path or route for substructures.Come up with materials take off.

Service Technician, Hamilton Pacific, Pasadena, Ca. 2003-2004

• Install and maintain banking equipment such as ATM, Alarm system,

CCTV system and other related equipment.

Service Technician, Red Hawk Industries, Ontario, CA. 2001-2003

• Install and maintain banking equipment such as ATM, Alarm system,

CCTV system and other related equipment.

Project Manager Ragon Ventures Corp., Makati, Philippines 1997-2001

• Responsible for the overall integrity of the OSP/ISP, System Integration

implementation and construction

• Responsible for the management of budget, materials, equipment, labor and

scheduling needed to meet deadlines of project delivery

• Coordinate with clients regarding change orders and changes in design

• Responsible for the documentation, preparation of as built plans and immediate

acceptance of projects

• Supervise Engineers during construction

Project Engineer/OSP/ISP/SYSTEM INTEGRATION, Alcatel Phils., Makati, 1990-1997

• Responsible for the equipment selection,site survey, staking, planning and

designing of cable distribution, equipment room layout and commissioning of

equipment

• Estimate materials, equipment, manpower and budgetary requirements for the

successful implementation of the designed projects

• Oversee the implementation and construction of OSP/ISP, System Integration

making sure that it meets the standard, timely delivery and quality of work as

planned

• Prepare documentations, as built plans and oversee acceptance of project

Sales and Applications Engineer, TCTI Phils., Makati Phils. 1988-1990

EDUCATION

Bachelors of Science Degree in Electronics and Communications Engineering, 1988

Mapua Institute of Technology, Manila Philippines

COMPUTER SKILLS

AutoCad, Microsoft Word, Excel



Contact this candidate