CURRICULUM VITAE
NAME: Mojtaba Darziani Azizi DATE OF BIRTH: 13 SEP1976
PROFESSION: Electrical Engineer
YEARS WITH FIRM: 11 NATIONALITY: Iranian
POSITION IN FIRM: Team Leader Electrical Engineer
PROPOSED POSITION ON TEAM: Senior Electrical Engineer
KEY QUALIFICATIONS:
Design, contract administration and site installation of electrical plant
for hydro, thermal power plant; petrochemical; refinery and natural gas
compressor station. Computer services including programming, data base
design and maintenance, data acquisition and control, systems design.
Calibration of instrument devices, preventive and corrective maintenance.
Loop checking of field devices to distributed control system (DCS), well
oriented in foundation field bus instrument, logic control/interlocking
(power & control) system. Familiar in all drawing and designing of
documents related to instrument functions such as: connection list, cause &
affect, safety matrix, P & ID, generator, excitation system and machine
performance tests. Familiar in protection relay: REG316 ABB, REL216 ABB,
MICOM, SEPAM, SIEMENS including test and setting calculation. Planning
scheduling and organization of electrical and instrument teams. Using the
MMS (maintenance management system) of works order development, design
engineering of power and instrument system.
Recent relevant assignments include:
Senior Electrical Engineer, Magwagwa hydro power plant,
February 2011 - Ongoing, Kenya
Team Leader Electrical Engineer, Tana hydro power plant,
October 2009 - January2011, Kenya
Team Leader Electrical Engineer, Jam gas compressor station,
March 2008 - September 2009, Iran
Team Leader Electrical Engineer, MES hydro power plant, (phase2) June
2007 - September 2008, Iran
Team Leader Electrical Engineer, Baniyas thermal power plant
June 2006 - May 2007, Syria
Team Leader Electrical Engineer, Karun 3 hydro power plant
September 2005 - May 2006, Iran
Senior Electrical Engineer, Aromatic 4, petrochemical plant
July 2002 - August 2005, Iran
Electrical Engineer, MES hydro power plant, (phase1)
February 2000 - June 2002, Iran
EDUCATION:
Bachelor of Engineering (Electrical), University of Water and Electricity,
Tehran 1999
Class 2
Professional Membership:
Graduate Member, Institution of Engineers, Iran
Other Training:
Aerial distribution workshop
Aerial transmission line workshop
Substation components workshop
Underground distribution workshop
EXPERIENCE RECORDS
FARAB, Hydro power plant main contractor; JKT, Petrochemical partnership
companies; Moshanir
September 2004 - Ongoing; July 2002 - August 2004; February 2000 - June
2002
Team Leader Electrical Engineer; Senior Electrical Engineer; Electrical
Engineer
Design, contract administration and site installation of electrical plant
for hydro, thermal power plant; petrochemical; refinery and natural gas
compressor station. Calibration of instrument devices, preventive and
corrective maintenance. Loop checking of field devices to distributed
control system (DCS). Familiar in all drawing and designing of documents
related to electrical and instrument function. generator, excitation system
and machine performance tests. Familiar in protection relay: REG316 ABB,
REL216 ABB, MICOM, SEPAM, SIEMENS including test and setting calculation.
Planning scheduling and organization of electrical and instrument teams.
Using the MMS (maintenance management system) of works order development,
design engineering of power and instrument system.
Magwagwa hydro power plant, Nairobi office, Kenya
Client: SMEC Intewrnational
Senior electrical and control engineer. Feasibility study and detail design
of the Magwagwa multipurpose dam and hydro power plant development project
on Sondu River. (February 2011- ongoing)
Tana hydro power plant, Sagana, Kenya
Client: Ken Gen
Team Leader Electrical and Control Engineer. Tana phase 2 is a new power
station design to produce up to 25 MW of power. And 2 substations: 66 KV
and 33 KV. Contract administration and site installation of electrical
plant: 2*32 MVA and 1*25 MVA step up transformer. Installation and
commissioning of 11 KV switchgear and 0.42 KV dry type transformer and LV
panels. Redesign drawings (Because of variances): circuit diagram, cable
connection, control I/O list, MV switchgear and diesel generator logic
diagram, DCS, generator auxiliary panels, interface between power station
and substation. Modification to auxiliaries and DCS panel. Conduct all
commissioning and machine performance tests. Loop checking of field devices
to control room and automatic start/stop test. (October 2009 - January
2011)
Jam gas compressor station, Iran
Client: Central locales oil
Team Leader Electrical and Control Engineer. Tender review and negotiation
of contract for phase 6,7 and 8 petrochemical plant. Installation of all
electrical and instrument devices for 4 units, SIEMENS turbine and
compressor: MV- LV switchgear and transformer, diesel generator adjustment
of PCV (pressure control valve), MOV (motorized valve), control valve or
actuator valve. Calibration of all instrument devices with analogue and
digital signals. Loop check and valve sequence check. Preparation of design
drawings (electrical and control systems) and test procedure. Including
calculation of protection parameters. (March 2008 - September 2009)
MES hydro power plant (Phase 2), Iran
Client: IWPC (Iran Water and Power Company)
Team Leader Electrical and Control Engineer. Review of tender documents and
drawings including redesigning of interface drawings and as-built design.
Installation, testing and commissioning of 4X 250 MW hydro power plant,
including 12 single phase step-up transformers (15.75KV/400KV) and SF6
400KV bus duct. Ppre-commissioning and commissioning of auxiliaries and LV-
MV systems. Loop check, signal check, logic and sequence check. Generator
and distribution line protection relay check. Generator and excitation
performance evaluation and machine efficiency tests. (June 2007 -
September 2008)
IWPC, Iran
Client: IWPC
Electrical Engineer. Preparation of tender documentation and contract
assessment and award of contract for the supply and installation of plant
and auxiliaries for 4X250 MW hydro power plant. (August 2007 - September
2008)
Banias steam power plant, Syria
Client: Ministry of Energy
Team Leader Electrical and Control Engineer. Planning, scheduling and
organization of electrical teams. Pre-commissioning and commissioning test
for all electrical, instrument and equipment including compliance with
technical specifications. Conduction of generator and excitation system
test, machine performance test and substation enerjization. (June 2006 -
May 2007)
Karun3 Dam and hydro power plant, Iran
Client: IWPC
Team Leader Electrical and Control Engineer. Review of tender documents and
drawings including redesigning of interface drawings and as-built design.
Installation, testing and commissioning of 8X 250 MW hydro power plant,
including 24 single phase step-up transformers (15.75KV/400KV) and SF6
400KV busduct. Ppre-commissioning and commissioning of auxiliaries and LV-
MV systems. Loop check, signal check, logic and sequence check. Generator
and distribution line protection relay check. Generator and excitation
performance evaluation and machine efficiency tests. (September 2005 - May
2006)
Aromatic 4 petrochemical plant. Iran
Client: Iran petrochemical company
Senior Electrical and Control Engineer. Installation and commissioning of 6
process zones for production of aromatic petrochemical material including
programming of control process. Loop checking of field devices to
distributed control system and function checks. Hart type instrument and
foundation fieldbus, conduction of functional tests of process
instrumentation and control devices. Sequence tests, logic
control/interlocking (power and control) system. Vendor assist for system
package test. Performed fault finding for various instrument devices.
Authorized to work in a hazardous area. (July 2002 - August 2005)
MES Hydro Power Plant (Phase 1), Iran.
Client: IWPC
Electrical Engineer. Consultancy services for installation and
commissioning of 4X250 MW hydro power plant. Site supervision for all
electrical and instrument equipment. Coordination of contractor to ensure
adherence to the contract document. Review of supplied equipment and
recommendation of areas of improvement. Supervision of commissioning of
electrical plant. (February 2000 - June 2002)
OVERSEAS ASSIGNMENTS
Syria, Kenya
LANGUAGES AND DEGREE OF PROFICIENCY
English: reading, writing and speaking - well
Persian: reading, writing and speaking - excellent
Date 3 June 2011
Signature of Staff Member
PAPERS
Effect of the fluctuation of the use of active and reactive power by
consumers on the network voltage. November 1999. Organized by the
university of Tehran, Iran.