A. R. ROMERO
Phone: cell 760-***-**** home- 760-***-****
Email: ***********************@***.***
________________________________________________________________________
SUMMARY
Thirty years in Industrial Automation Market including Power, Mining,
Chemical De-militarization, Waste Treatment and Manufacturing with majority
of career spent in the field in a self directed capacity. Control Systems,
Instrumentation and Electrical. Exceptional commissioning background.
Specialization in System upgrades, design, implementation and migration
into operating facilities. System specification and vendor acceptance
testing.. System auditing to maximize performance and provide operational
integrity. Over ten years' experience in Power Plant Start-up and
Commissioning as well as Scheduled Maintenance, Daily Support, Outage
Support and System Analysis. Gas Turbine including but not limited to GE
LM5000, LM 6000. Full production as well as Peakers, and Coal Fire Plants.
Exceptional knowledge, 8 years' experience, with Emerson Ovation including
third party interfaces from serial to Ethernet drivers to OPC. Extensive
experience Bailey (ABB) and all Allen Bradley control products. Strong
background with Siemens Flex Plant, T-3000 and TXP, GE Mark V, Woodward
Controls, Cimplicity HMI, Foxboro DCS, Rockwell Controllogix, RSlogix 5000,
Wonderware, ASI(Actuator Sensor Interface), Fisher Prov-Vox, Modicon PLC
and Honeywell TDC. Network Administration. Strong leadership skills,
management, scheduling, and team development & training.
Advanced Service Solutions 11/02 to current Apple
Valley, Ca.
DCS Customer Support and Consulting
VIWAPA (client)
St. Thomas, Virgin Is.
Control System and Instrumentation support for Maintenance Outage. GE
Frame 5Combustion Turbine.
First Solar (client)
Tempe, Az.
Hired as consultant to audit and review Control Systems for current and
future Solar Field Projects. Ask to establish that use and implementation
of system as it relates Solar Energy Projects operation and data collection
was sufficient as it related to power generation.
PG&E (client)
Antioch, Ca.
Plant operations support
GE (client)
Mexico
Maintenance program at remote sites on GE LM6000's
Kennecott Copper RTZ (client)
Salt Lake City, Ut.
Control System Consultant
Review photovoltaic, state mandated, emergency freeway signing system.
Corrected design issues with the current system, provided recommendation
for implementation of reliable and efficient system.
Progress Energy (client) Richmond County Project
North Carolina
Control System Consultant
Factory acceptance Test and Audit for NERC-CIP Compliance. Critical Cyber
and Critical Asset Identification.
Progress Energy (client) Bartow Power Project
St. Petersburg, Fl.
Lead DCS Commissioning Engineer Client Representative
Lead DCS on a 15 month project for the commissioning of a 4X1 Combined
Cycle Power Plant for Progress Energy, replacing an existing facility.
Emerson Ovation for balance of plant. Siemens T-3000 CTG, Mitsubishi STG.
Responsible for all DCS related work and personnel including vendor
compliance.
Verification audit of NERC-CIP compliance. Managed Control System Staff
and supervised Instrumentation Group.
Black & Veatch (Grafton)
Emporia, Ka.
DCS Commissioning Engineer
Owner Rep. DCS support, Commissioning of a 600 Megawatt, Simple Cycle Power
Plant. Owner, Westar. Systems: BOP, GE Mark VIe. Plant had 3 GE7 FA's,
4 GE LM6000.
Mint Farm Energy Center (client)
Longview, Wa.
DCS Commissioning Engineer
1X1 Combined Cycle Power Plant. GE Turbines. Control System, ABB Harmony
and ABB Portal B. The plant had been shut down in a partial completion
stage for 5 years. Managed Control System staff and Instrumentation
Group. Established and implemented maintenance schedule. Managed vendor
compliance with state and federal safety regulations. Out-dated equipment
and system, missing data, and incomplete engineering have made this a
challenging project.
Constellation Energy (client) High Desert Power Project
Victorville, Ca.
DCS Engineer (Resident Engineer Client Rep)
Operational support and system analysis on 3X1 Combined Cycle Power Plant
including Water Filtration Plant. Westinghouse Ovation and Siemens Control
System. Auditing of original DCS Specifications and securing of vendor
compliance. Dailey monitoring of DCS operation to develop solutions to
remedy inefficiencies optimizing operation. Operator support and Data
Acquisition. Implement control system upgrades. Converted Siemens
interface from Modbus serial to redundant OPC. Configured Modbus interface
for Siemens Flex Plant optimizer. Including the specification, installation
and configuration of new cabinet of I/O required for the implementation of
Flex Plant. Performed plant engineering an all activities associated with
this project dramatically reducing client costs. Provided outage support
and scheduling for Controls and Instrumentation tasks. Maintenance
scheduling and implementation of controls, instrumentation and high voltage
for outage.
LADWP (client) Sun Valley Energy Center
Los Angeles, Ca.
Lead DCS Commissioning Engineer
.
LADWP Joint Venture Project, 2X1 combined Cycle Power Plant. Westinghouse
Ovation NT DCS. Project included twenty-one serial interfaces, and the GE
Ethernet GSM protocol for the CTG's and STG. Actuator Sensor Interface, for
motor control on a power project in the US.
Constellation Energy Group (client) High Desert Power Project
Victorville. Ca.
DCS Commissioning Engineer
3X1 Combine Cycle Power Plant. Ovation NT DCS System.
Calpine 05/01 to 11/02
Folsom Corporate Office
Folsom, Ca.
DCS Controls Engineer
Assigned for development and configuration of new DCS system to replace
current system on new facilities. Developed specifications for Vendor
Proposals. Evaluated proposed systems and presented final recommendation
for system selection. Recommendation of Westinghouse Ovation was
implemented. Provided system analysis, outage and maintenance support for
Sites as needed.
Delta Energy Center
Pittsburg, Ca.
Lead DCS Commissioning Engineer
3X1 Combined Cycle Power Plant. Complete responsibility for DCS Control
System. (Seimens TXP, ABB Bailey and Toshiba Tosmap). Commissioned 3
Siemens Westinghouse 165 MW combustion turbines and 1 Toshiba 300 MW steam
turbine. Including but not limited to identification, analysis and
solutions for control applications, installation, testing, compliance,
vendor accountability and operator training. Responsible for Controls
support staff and Instrumentation. Scheduling, training and team building.
Los Medanos Energy Center
Pittsburg, Ca.
DCS Commissioning Engineer Client Representative
2X1 Combined
cycle power Plant. Vendor accountability and specification compliance.
Testing and commissioning. Analysis and solution implementation for
process control system.
.
10/99 to 05/01 ABB (Bailey)
Wickliffe, Ohio
08/97 to 08/98 Bailey (ABB)
Controls Engineer
System Engineering on Control Systems for Power Generation Plants. Factory
and Field testing. Application and software. Project auditing for Systems
Integration and installation for future contracts. Commissioning and field
audits.
PROJECTS:
Babcock Wilcox: Office engineering. Saba project.
Pakistan
Entergy, Baxtor Wilson: Office, audit and filed.
Vicksburg, Ms.
Entergy, Gerald Andrews: Office, audit and field
Greenville, Miss.
Dubai Electric and Water Authority: Office, testing and field.
United Arab Emirate
Support services on various Egypt projects.
Fluor Daniel 08/98 to 10/99
Batu Haju, Indonesia
Lead Controls Engineer
Two Billion dollar mining project in Indonesia. Grass roots project.
Included all support plants such as power generation, water filtration
systems and port facilities DCS, PLC, NT, Bailey Controls. System design,
check out, installation and start-up. Bailey NT Conductor. Managed
Controls and Instrumentation Field Staff. Developed and implemented
instrumentation training program.
Independent 11/96 to 08/97
Forteleza De Minas, Brazil
Controls System Consultant (Nickel Mine)
Contracted directly to client for the express purpose of development and
definition of control system. Foxboro DCS with networked PLC's. Vendor
accountability, compliance with engineering, budgets, and scheduling.
Direct involvement with design, testing and system integrity. Training and
development of Control System staff. Managed 32 staff members, including a
group of in-house Engineers as well as provided the direction and defined
the expected schedule of results for Engineering staff at vendor
development and testing center. Delegated field assignments, conducted
disciplinary meetings, gave performance reviews. Implemented a "Team-work-
group", system that enabled staff to more efficiently perform project tasks
by providing each group with a staff member proficient in a specific
discipline.
Bowen Engineering 01/92 to 11/96
Salt Lake City, Ut.
Kennecott Smelter/Refinery Modernization
Smelter:
Controls Engineer
Completed refinery and was then assigned to the Flash Smelter as a Controls
Engineer for Start-up and Testing. Smelter was a large Fisher DCS control
system with networked PLC's.
Project Automation Specialist
Upon completion of the Smelter was retained as a Project Automation
Specialist to manage a Contract Controls Engineering group designated to
work with the Kennecott Control System Transition Team defining and
completing quality and reliability improvement projects.
Refinery
Controls System Test Engineer
Copper Refinery material handling, Tank House, Steam plant, and Precious
Metals facilities.
EG&G Defense Materials Inc
Tooele, Ut.
Control System and Instrumentation Specialist
Start-up engineer for the new chemical weapons disposal plant for the Army
Corp of Engineers. First plant of its kind in the Continental U.S.
Geneva, Steel 06/91 to 01/92
Orem, Ut.
Control System and Instrumentation Specialist
Installation and start of new X-Ray System and equipment for Environmental
improvement project.
Aptus 01/91 to 6/91
Arognoite, Ut.
Controls and Instrumentation Technician
The commissioning and operation of a new Waste Incinerator facility owned
and operated by Westinghouse. Installation, pre-commissioning, testing,
start-up and operating maintenance. Responsible for environmental
compliance documentation.
Procter & Gamble 1981 to 1991
Control System Technician
Dallas, Texas
Soap manufacturing plant. Project support, operations maintenance program,
automatic process control system upgrades, installation and maintenance.
Control System and Instrumentation Technician
Long Beach, Ca.
Provided daily support services. Supervised a Technical Installation Team
responsible for all in house modernization, upgrades and systems
replacement. Project manager installation and conversion projects.
Utilities Engineer
Responsible for providing reliable supply of plant utilities, including
high and low pressure steam, process water, compressed air and
refrigeration systems in a seven day a week around the clock operation.
Commissioning of first wood fire powerhouse.