Post Job Free
Sign in

Engineer Maintenance

Location:
674
Posted:
November 06, 2010

Contact this candidate

Resume:

Luz M. Quintana Box **** Manati P.R *****

***- ***-****

***.*********@*****.*** [pic]

CAREER PROFILE

Experience in Process Computer, Equipment, Metrology (Calibration

Coordinator for The Puerto Rico Division Calibration Coordinator ),

Maintenance Engineer, Maintenance Superintendent, Electronic and

Communication Supervisor, General Maintenance Supervisor, Manufacturing

System Supervisor. Additional experience in instructing, including college

level. Assure compliance of the above positions with all policies from

internal and external regulatory agencies such as GMP'S, OSHA, FDA, ISO,

EPA, DEA, ASME, NEC, NFPS. Proven experience with training, establish

standards, support new products development, approve investigations.

Ability with development documentation such as procedures. Major strengths

include strong leadership, able to take proper and quick decision goods

interpersonal relationship excellent communication skills, competent,

strong team player and attention to detail. Responsible is always willing

to help. Proactive and analytical abilities to problem solving. Able to

manage all aspects regarding to phase out or transition environment.

Committed for compliance in all regulated environment and supervisory

skills including hiring, termination, scheduling, training, payroll and

other administrative tasks. Thorough knowledge of current manufacturing

practices and a clear vision to accomplish the company goals. Computer and

Internet literate. Results-oriented, high-energy, hands-on professional,

with a successful record of accomplishments.

Rewards And Recognitions

. Silver Award- Abbott Global Pharmaceutical Operations- Oustanding

Performance and Lasting Contribution on consistent Service to Quality

Area -2007

. "Mujer de Avanzada en Puesto No tradicional"- Departamento de

Mantenimiento de Upjohn PR

. "Reconocimiento por la labor como Superintendente de Mantenimiento-

Gerente de Ingenier a y Mantenimiento - Cyanamid Agricultural P.RJulio,1992

. "Esp ritu de Sacrificio y Dedicaci n" -"Abbott Hospital Plant 1996

. "Semana de La Mujer Profesional- Conferencia La Mujer Puertorrique a en

un Puesto No Tradicional -Colegio Marista El Salvador P.R "

. Productivity Tesis- Performance Matrix - Increase Productivity of the

Electronic Coordinator and Gain Employee Symbol Award. 1987

Abbott 1992-May13

Hospital-Pharmaceuticals 2010

Chemical and Fermentation

Barceloneta Plants APL

Maintenance (Metrology ) Engineer APL 2007-To may

III 13 2010

Maintain and operate the metrology calibration analysis in accordance with

the department's standard operating policies and local and corporate

metrology guidelines and procedures. Approve calibration and maintenance

engineering documents for laboratory scientific and manufacturing

Engineer's APL . Review procedures as technical editor. Evaluate new

metrology policies from corporate and implement the procedures applicable

to the metrology system in P.R. Train incoming engineers and computerize

Calibration Program. Maintain follow up and tracking system to ensure CAPA

actions, approve out of tolerance. Investigation and extension requests

reports for APL were closed in a timely manner

Accomplishment-Complied and provided all the requested documents and

procedures in a timely and a safe manner with no significant quality system

failure or observation during the last 11 audits.

Luz M. Quintana Page 2

[pic]

. Maximized new metrology (calibration) and preventive maintenance

program implemented by the go live date resulting in a continuous

basis services, paper less, real time data, increasing the

documentation manage and reducing the risk to incur in an error.

. Registered new products (Kaletra and Lopinavir Project) in the

calibration program. Kaletra completion 3 month before due date.

. Maintained follow up and tracking system ensuring CAPA actions and

extension requests reports were closed in a timely manner and were

properly justified to meet Division and Corporate requirements.

Manufacturing System Supervisor Abbott Pharmaceuticals 2005- 2007

Chemical and

Fermentation Plants

Administer mechanical integrity program (Predictive Maintenance),Stock

Room, calibration program for chemical, fermentation and pharmaceutical

assure Regulatory and Compliance functions within an FDA Regulated

industry.

Accomplishment

. Achieved the compliance of the stock Room Metrics which includes cycle

count, stock Out, obsolete parts, calibration program metrics

administration - calibration clerts and bad actor.

. Reduced the critical equipment failure and the Chem/Fer/Pharm plants

by 25% due to proper administration of mechanical integrity program.

. Reduced by 5% the steam loss in fermentation j/chemical plants by the

steam traps Monitoring Program.

. Completed Calibration on time 99 %.

. Perform calibration streamlining project for fermentation and

pharmaceutical plants resulting in total savings per year of $95,056 for

fermentation plant and $19,296.85 for manufacturing area and a Cal Alert

reduction of 50%.

General Maintenance Supervisor Abbott Pharmaceuticals 1996-2005

Barceloneta, PR

Participate in the decision maker in the problem solving process of the

mechanical, instrumentation, electricity and electronics areas. Ensure

proper installation, preventive maintenance, and repair of instrument and

electrical equipment. Maintain follow up and tracking system to ensure

CAPA actions and Extension Requests Reports were closed in a timely manner.

Accomplishment

. This project was implemented in Pharmaceutical plant by my initiative.

. Developed Electrical Tagging project "Best in Class" minimizing

troubleshooting repair time in electronic technician personnel.

. Improved work life quality and safety on the day to day work.

. Facilitated lock -out tag out on the day to day work.

. Updated drawings and are located at API Engineering Department. This

project was implemented also in Jayuya P.R and Chicago Plant.

Senior Equipment Engineer Abbott Hospital 1992-1996

Barceloneta, PR

Implement a wide variety of engineering solutions to increase equipment

availability, increase net operating rate, and achieved standard and

acceptable production rates. Responsible for project management activities

such as planning, schedule, supervision and capital budgeting control for

departmental projects.

Luz M. Quintana Page 3

[pic]

Accomplishment

. Completed the project management activities to install stock room

facilities, out of Abbott Barceloneta Plant.

. Complied with all the regulation in a time frame of one month during

hospital Plant, phase out.

Maintenance Superintendent Cyanamid Agricultural 1989 -1992

Manati,P.R

Responsible for accomplishes the production of optimum predictive,

preventive and corrective maintenance services according to chemical

utilities, pharmaceutical and production schedules at optimum quality,

safety, minimum cost and in compliance with applicable government

regulations and company policies. Participate in the decision maker in the

problem solving process of the mechanical, instrumentation, electricity

fabrication, piping and electronics areas.

Electronic Supervisor II The Upjohn 1982-1989

Manufacturing

Barceloneta, PR

Responsible for the preventive maintenance, repairs, calibrations,

recommendation and improvement of all electronic equipment of the plant

including production, analytical, communication and computers equipment.

Responsible to prepare and control directly and expense budget of $350,000

Accomplishment

. Manage confidential project, to monitoring controlling substance access.

Install monitors, card reader as per target date.

Process Computer Engineer Union Carbide Caribe 1978-1982

Inc.Ponce P.R.

Accountable of working in the application of Process Control to the

computer. Maintain and upgrade existing process computer applications to

satisfy the production Unit needs. Provide training on document action

computer control, engineering calculations and other special program using

advanced mathematical programming techniques. Perform trouble shooting

activities to the process control applications to satisfy the production

unit needs.

Education

MBA Industrial Management Master

Interamerican University of Puerto Rico

B.S.E.E. Science of Electrical Engineering

Agriculture & Mechanic Arts College U.P.R

Formal training

Formal training and hand some experience in the followings areas:

Management, Maintenance, Process Control, Productivity, Budget, Computer,

Project Management, Quality



Contact this candidate