Sam Moosavi, P.E.
Argyle, Texas 76226
**********@***.***
Objective Provide engineering services and develops my electrical
engineering skills, advancing my career in electrical design, project
engineering, and project management.
Summary I am a Graduate Electrical Engineer with fifteen years
experience in engineering low, medium, and high voltage power systems,
and construction management. I have managed projects in the substation,
industrial/environmental, commercial, and telecommunications industries.
Industrial experience includes the design and development of
one line diagrams, three line diagrams, schematics, wiring diagrams,
relay selection, and modification of physical layout for 230kV to 500kV
substations. Designing municipality water and wastewater power systems
consisting of pump stations, chemical buildings, thickening buildings,
sludge dewatering buildings, blower buildings, control buildings,
electrical buildings, administration buildings, clarifiers, vaults from
15KV to 480V service, communication, and duct bank routing for entire
plants.
Commercial experience includes
project management and complete designs for medium and low voltage power
distribution for a variety of high and low-rise office buildings, hotels,
mixed use facilities, hospital, medical building, retirement home,
assisted living, data center, schools, university, department stores,
churches, Shopping center and infrastructures.
Problem solving and providing
innovative ideas are my major strengths, as I am a quick learner and
adapt well to different environments. I am process oriented, pro-active,
and enjoy working in a team environment while operating with detail and
system level perspectives.
Professional
Licenses Texas: #91910
Oklahoma: #21370
Nebraska: # E-13209
Experience System Associated Inc, TX (JUN 1 2009
to Present)
800 WEST AIRPORT
FREEWAY,SUITE#611
IRVING TEXAS 75062
Project Manager& Project Engineer:
The following are examples of tasks
performed in projects:
. I did design Electrical power distribution including all aspects of
commercial facilities.
. Project management for various projects including coordination
between MEP disciplines, clients and contractors.
. I did design circuitry, calculating loads, voltage drops and short
circuit calculations. Sizing wires, breakers and motors for
electrical and mechanical equipment and lighting design.
. I did Coordinating applications of electrical equipment and
materials with manufacturers and representatives.
. Producing study reports and cost estimates for clients.
. Responding to RFI's and reviewing submittals.
. I have Knowledge and understanding of NEC, IECC and NFPA codes.
. Conducting site surveys, attending meetings and completing punch
lists
. Complete medium and low voltage power distribution system design
for commercial facilities including high rises, upscale resorts,
hotels, and condos, universities, call centers, and concert halls.
. Project management for various projects including coordination
between MEP disciplines, clients and billing.
. I did Coordinating applications of electrical equipment and
materials with manufacturers and representatives.
. I did energy code reports using COM check.
. Traveling for surveys, meetings and punch lists.
. Producing complete electrical specifications for projects
Dashiell LLC. Bedford, TX
(April 25- 2008 - Feb-28- 2009)
Electrical Engineer& Project
Engineer
2350 airport FRWAY,
Bedford Texas, 76022
The following are
examples of tasks performed:
(Contract by MRI. Inc. to
full time position)
The following are examples of tasks performed:
. Design and develop the concept ional design for fire alarm and
security system.
. Develop relay Panel layout per PECO standard.
. Design and develop the L&P one line Diagram. Performed Load
calculation for AC/DC Panels, Panel KAIC rating and Panels
arrangement in control room.
. Utilizing vender equipments drawing for DC schematic connection such
as 230KV breaker, current transformer ratio, circuit breaker alarm
contact,aux contact switch "a" & "b", trip coil1,and trip coil2.
. Developed Dc schematic on 230 KV substation utilized SEL311L, SEL
421, and SEL 352 Relay.
. DC schematic on 230kv base on approved single and three lines
diagram Utilizing SEL 421, as primary relay, SEL 311C as
backup relay, SEL 352 for breaker failure, and SEL387Z for bus
protection.
. Removed wave Traps on Phase A, Phase B, and wave traps, existing
carrier control primary and backup transfer relay panels. Develop Dc
schematic SEL311l, SEL 421, and SEL 352 breaker failure for
replacing existing system.
. Utilizing vender equipments drawing for DC schematic connection such
as 230KV breaker current, CT,CCVT, and MOD.
. Equipment Wiring connection from Yard electrical devices to
Marshalling Cabinet.
. RTU layout and develop the SCADA analog, status and control points,
SCADA system schematics and input point data utilizing the HarrisD20
with communication interconnection with SEL
2020.
. Provide the communication control topology between the
communications SEL2020, and protective relays.
Gupta & Associates, Inc. Dallas, TX (May, 05 - April-2008)
Electrical Engineer&
Project Engineer
13626 Gama Road
Dallas Texas 75244
(Contract by Gupta &
Assoc. Inc. Self-Employee)
The following are examples of tasks performed in wastewater project:
. Responsible to design plant Medium to low voltage substation from
13.8kv to 480v system.
. Design electrical power distribution for Pump stations, Lift
stations with backup power.
. Responsible for preparing electrical distribution system from
12.47kv to 2400v, 12.47kv to 4160v, 12.47kv to 480v through
distribution pad mounted transformer to feed MV & LV MCC.
. Responsible for preparing single lines for MV & LV switchgear,
backup generators, to feed entire pump station and partial plant
service entrance, coordination with utility company transformer,
and calculate and sizing plant internal transformers, and MV & LV
Motor control center(MCC).
. Developed design Narrative, cost estimates, construction
inspections and performance tests during final stage of projects.
. I was Responsible to preparing electrical distribution system
from480/277v to 208/120v through distribution dry type transformer.
. Performing short circuit analysis, motor starting studies,
Protection relay setting calculations & coordination curves using
SKM software.
. Preparing electrical equipment specifications and reviewing vendor
shop drawings.
. Preparing equipments layouts, schematics & wiring drawings.
. Design Multilin 469 motor protection and Multilin 750 for feeder
protection.
. Review and design area classification drawings such as: grounding
design, lighting design, fire alarm, security system, Electrical/
PLC interface diagram, cable tray, power layouts/plans & heat
tracing design review and support field construction.
. Preparing project cost estimation, and bid analysis during bid
period.
. I have Knowledge of industry codes and standards (IEC, NFPA, ANSI,
IEEE, NEMA).
. Design and development of electrical systems for the waste water
and raw water projects listed below:
. Project engineer and project management
. Performed load flow study using power world simulator ver.8.0. up
to
Maximum total 37 buses study.
Reed, Wells, & Benson, Inc. Dallas, TX (Nov.,2004 - March, 2005)
(Contract by Reed, Wells, & Benson, Inc. Self Employee)
. Performed Power Systems Studies with Power System Analysis
software using SKM (DAPPER/CAPTOR) program on critical power
generator/ups paths for Telecom Company in Dallas.
. Performed short circuit calculations and time-current
coordination among breaker devices in order to achieve
maximum circuit protection consistent with electrical service
and recommended protective device settings.
. Perform all electrical engineering functions data, and power
system modeling, short circuit current studies, protective
device coordination studies.
Tectonic Engineers, Co., Dallas, TX (June, 2002 - August, 2004)
Project Manager/Electrical
Engineer
. Planned and designed engineering projects with complex
features.
. I did Laid-out drafting work, and Perform engineering studies
and computations.
. Preparing reports and making presentations to management, and
supervising installation and construction.
. Equipment selection and electrical design development on
various types of equipments including transformers, medium
and low voltage switchgear, protective relays, generators,
power cabling, main tie main, and grounding systems.
. I was in charge of Multi-million dollar Dallas Independent
School District projects.
. I did design electrical power distribution for High-rise and
low-rise Marriott Hotel projects.
. I did electrical power modification distribution to
Wastewater projects.
Turner Engineers, Inc., Dallas, TX (FEB. 2000 - May, 2002),(July,1996 -
Feb.1999)
Project Manager/Electrical
Engineer
. Responsible for the analysis and design of Electrical systems
while coordinating with host architectural firms, builders
and city planners, during design and construction.
. I did Performed electrical load analysis, load assessment,
equipment selection, system design, and preparation of
electrical specifications.
. I was Responsible for managing projects from initial design
through construction.
. Visit the construction site every two weeks to check the
progress of project.
. Responsible for providing construction assessment fee base on
site visit for the owner every month.
. I design Multi-million dollar hospital renovation and design
utilizing medium voltage for service entrance and substation
to feed the hospital.
. Call center, Plano school district, Fire station, police
center, shopping mall.
. Movie Theaters, Department Stores, HEB grocery including
central market.
. Renovation and modification of University of Texas at
Arlington.
. Data center, Telecommunication room and clean room.
C.C.R.D Partner Engineers, Inc., Dallas, TX (Sept., 99 - Jan., 00)
Electrical
Design Engineer
. Developed the Electrical Single Line Diagrams; performed
Short Circuit, power quality, Power System studies to ensure
appropriate equipment ratings and power system performance.
. Multi-Million hospital Renovation design voltage for service
entrance and substation to feed the hospital
. Performed breaker Coordination Studies and breaker setting,
developed motor control and generator back up system.
. Worked with the Project Team to develop the electrical
documentation details drawings and working with Electrical
Equipment Suppliers and internal procurement organization to
develop major electrical equipment order specifications.
. Designed main tie main Electrical systems with generator back
up power for critical power and life safety for hospital.
Carter & Burgess, Inc., Fort Worth, TX (March 99 - Aug., 99)
Electrical Design Engineer
. Responsible for designing medium 13.2kv S&C switch gear in
distribution plant.
. I did Worked with multiple engineers and CADD disciplines to
ensure quality control.
. I have Perform field surveys to verify as-built conditions
and code compliance.
. I have Perform short circuit and device coordination studies.
. Designed and develop the lighting design and control
schematic.
Education MSEE and BSEE in Electrical Engineering from
University of Texas at Arlington
BSAE in Aeronautical Engineering from University of St.
Louis at St. Louis, Missouri.
Airframe and Power plant Licensed by Federal Aviation
Administration.
Technical Skills AutoCAD 2000, Micro station, Load Flow, Microsoft
Excel, Microsoft Word, Math CAD, SKM "POWER SYSTEM COORDINATION", and
familiar with ETAPS.
References -Todd Oliphant Senior Engineer
Associate (UL) 469-***-****
- Don Penick
Application Engineer Eaton Group 817-***-****
- Rodney Welch P.E.
Elec. Principle at Aguirre Roden 972-***-****
-Robert Williams P.E.
Chief Elect at NTWM. 972-***-****
-Kasi Tallapaneni P.E
Chief I&C at Gupta 817-***-****
-Brian Eisenrich P.E.
Project manager at Parsons 817-***-****
Work status US CITIZEN