Post Job Free
Sign in

Construction Electrical

Location:
Spring, TX, 77386
Posted:
November 17, 2010

Contact this candidate

Resume:

Russell W Page

**** ******* **.

Spring, Texas **386

Home phone 281-***-****

Cell phone 832-***-****

Objective: To obtain a position that allows me the opportunity to use my

knowledge and skills that I have acquired in my 20 plus years in the

commercial, residential and restaurant construction industry to contribute

to reaching specific company goals and targets.

Qualifications: I have had extensive on the job training with heavy

equipment such as track hoes, front end loaders, back hoes, bulldozers,

forklifts, man lifts, uni-loaders as well as concrete removing equipment.

I have also worked with multiple tower cranes during large operations.

Employment

2003- Present- Linbeck Inc. Assistant Field Superintendent/General

Carpenter

foreman. Projects with the company consisted of M.D.

Anderson/ Proton Therapy Center. Houston, Texas Rice

University/ Baker College Remodeling and Renovation. Rice

University: 10 story Collaborative Research Center.

Responsibilities include supervising and coordinating daily

construction operations consisting of concrete form work

including columns, walls, concrete footings, grade beams,

etc. and carrying out a daily behavior based safety program.

Responsibilities also included purchasing materials and

renting equipment.

2003- 1-800 Handyman. Supervisor of Field Operations.

Responsibilities included planning and coordinating daily

projects for crews if 15 to 20 men. Projects were

preventative maintenance tasks, carpentry, drywall,

painting, basic electrical and plumbing, fixtures, fencing,

siding, decking, tile, cabinets, countertops and moderate

remodeling.

1999-2002- RWP Construction Specialties Owner. Responsibilities

involved remodeling and renovation, basic electrical,

carpentry, plumbing, fixtures and installing tile,

countertops, doors, windows, concrete walkways, driveways,

drywall etc.

1996-1999- Gramdale Inc.- Asst. Supervisor of Preventative

Maintenance. Responsiblilities included supervising preventative

maintenance of 21 restaurants involving carpentry, drywall,

plumbing, fixtures, doors, appliances, tile restoration,

painting and installing store front signage as well as 2 new

restaurant build-outs.

1994-1995-Manhattan Construction Company Journeyman carpenter.

Responsibilities included working as a journeyman carpenter

during the construction phase of the Houston Metro /bus Barn

Maintenance facility completing concrete form work, walls,

columns, trenches, driveways, curbs, doors, metal enclosures,

hardware fixtures and painting.

1995 - Linbeck Inc. Journeyman carpenter. St. Joseph Hospital.

Resp0onsibilities included carpentry concrete form work and

rebar reinforcement of structures. Projects included poured in

place concrete with walls ranging from 6 to 8 feet thick and 12

feet high.

1990-1994- Self Employed Carpenter. Responsibilities included

small remodeling jobs, door installation, tile, drywall basic

electrical, plumbing, sidewalks, window installation, fencing,

decks, patios concrete replacement, interior remodeling, custom

trim and painting.

1989-1990 Pepper Lawson Construction. University of Houston Four

Story Science Building. Responsibilities included concrete form

work, rebar construction, wall forms, column forms, safety

cables, metal enclosures, concrete underground enclosures.

1988-1989 Cahaba Construction Inc. Houston Intercontinental

Airport terminal C. responsibilities included concrete

construction from the ground up spread footings, columns, walls,

slabs, pavement construction and various other concrete

carpentry form work.

1987-1988 Robert E Mckee Inc. - South Texas Waste & Water

Treatment Plant. Responsibilities included constructing

concrete reinforced enclosures built to treat waste water, walls

slabs, columns, sidewalks, driveways and other concrete

carpentry.

1986-1987- Manhattan Construction Inc. Houston Lighting & Power

Phase I. Responsibilities included concrete carpentry form work

which involved architectural concrete structures.

1984-1986- Linbeck Inc.- Thornwood Professional building.

Responsibilities included concrete carpentry work and a transfer

to IBM Computer Research to complete similar duties.



Contact this candidate