Post Job Free
Sign in

Engineer Project

Location:
Houston, TX, 77095
Posted:
September 28, 2010

Contact this candidate

Resume:

Home: 281-***-**** ****

Virginia Water Lane

Cell: 281-***-****

Houston, Texas 77095

Email: ****.*****@*****.***

Jeff Yeley

General Experience: Senior Project Controls Specialist, Software Developer,

and College Instructor.

Software skills: Microsoft Windows 95/98/NT/2000/XP/Vista/Windows 7

operating systems, Microsoft Office Professional 2003 (Outlook, Word,

Excel, PowerPoint, Access, Front Page, Publisher), VBA Programming, MS

Visual Basic, MS Visual Basic.Net, MS Visual C++, MS Visual Studio,

Microsoft SQL Server, MS-SQL, MS Visual Foxpro, Microsoft Project,

Primavera, SAP, HTML, Common Lisp, AutoCAD, AutoLisp, Visio, QuickBooks,

Erwin Data Modeler, Linux Operating System, Linux Servers, Solomon

Accounting, and "DOS".

Experience

2005 - 2010 WS Nelson

Houston, TX

. Project Controls Lead on six Front End studies of ExxonMobil Chad

projects.

WS Nelson, on loan to ExxonMobil Production Company, US Projects

Group Houston, TX

. Developed a database program and procedures to produce consolidation

cost reports on a monthly basis for upper management. The program

produced progress reports for 64 individual AFE projects valued in

excess of $100 million. The recovery efforts included both onshore

facilities as well as offshore platforms repairs due to damage by

hurricanes Katrina and Rita.

. Developed, implemented, and updated the client's intranet website to

display the hurricane recovery projects cost reports, photos,

schedules, and other relevant project information including an

executive summary.

. Developed a SAP user interface program that produced SAP project cost

reports without modifying SAP or the client's accounting system. This

program tracked 316 active projects producing 1,000 reports (AFE

Detail, Invoice WBS Listing, and an easy to read one line per purchase

order report per project).

. Developed and implemented a standardized AFE project report tool.

This was developed in Microsoft Excel using Visual Basic Applications.

This tool was integrated with the SAP Data mentioned above to allow

the Project Managers to import and sort the Purchase Order and Non-

Purchase Order cost data into any format they prefer in order to

better understand the project costs. This report was submitted to

upper management on a monthly basis.

. Lead Project Controls Engineer on the Mississippi Canyon 280 platform

hurricane recovery project.

. Lead Project Controls Engineer on the South Pass 89 platform hurricane

recovery project.

. Developed and implemented a Microsoft Access Field Construction Cost

Tracking and Forecasting Database Program. The program consisted of

two parts (Home Office and Field). This allowed the TFC (Technical

Foreman-Construction) to input all construction cost information by

Purchase Order, Face Approved Invoice or company credit card into the

database on a daily basis. The program tracked ExxonMobil labor,

contract labor, field purchased materials, daily plans, daily

progress, downtime, issues and concerns, painting, rentals, seven day

planner and safety information. This data was uploaded to the "Home

Office" version of the program. The "Home Office" version imported

the data from each of the "Field Versions" from all projects across

the United States. Management (both project and upper management) was

then able to examine all active projects. The "Home Office" version

imported the SAP data. This SAP data was exported to each of the

"Field Versions" at the various jobsites. The cost forecasting module

was a key feature of the program.

. Developed and implemented a "Small Project" cost tracking program

using Microsoft Excel and Visual Basic for Applications. This program

was used on the $5 million or less size projects. It include a

simplified scheduling and SAP cost data import routine to allow the

project manager to track and forecast total project costs.

. Lead Cost Engineer on the Mobil Bay Plant Consolidation project.

2003-2005 ITT Technical Institute

Houston, TX

Instructor

Computer Aided Design / Drafting (CAD) using AutoCAD, AutoCAD Map and

Autodesk Mechanical Desktop.

2002-2003 Technip Offshore Inc.

Houston, TX

Senior Cost Controller

. Responsible for all Cost Control activities on the Kerr-McGee Red Hawk

Project. This is a first of its kind Cell Spar Production Facility that

was a lump sum project and involved five different Technip Offshore

Business Units.

2001-2002 Technip USA

Houston, TX

Senior Cost Engineer

. Responsible for all Cost and Schedule activities on Lump Sum and

Reimbursable Natural Gas Processing Plants from Home Office Engineering

through Field Construction.

2000-2003 Houston Community College System

Houston, TX

Adjunct College Instructor

. Computer Programming

2000-2000 IT Development

Houston, TX

Manager of Operations

. Manpower planning, sales forecasting, cash flow analysis, profitability

analysis, and corporate budget development. Established all Accounting

procedures and corporate "Code of Accounts." Developed in-house timesheet

program. Developed Human Resource Policies and Handbook.

1991-2000 Jacobs Engineering Group

Houston, TX

Software Developer - Computer Aided Engineering Department

. Developed the Vendor Document Control System (VDCS2). This program

tracked, controlled and reported the status of all Vendor Documents.

. Zyqad Process Engineering Program. Developed rules for knowledge

bases in Common Lisp using the Zyqad Object-Oriented Database.

Supervisor of Development - Computer Aided Engineering Department

. Piping & Instrumentation Diagram Extraction Program (PIDX). This

AutoCAD program contained the following major modules: Piping Line List,

Piping Valves (extraction and automatic feed to the MICROPIPE Materials

Management Program), Specialty Items List, Tie-In List, and Instrument

Module (reports and interfaces to United Engineering's "IN" Instrument

Database Program).

. Specifications Translator (SpecTran). A Jacobs "Master Specifications

Set" maintained inside the MICROPIPE Material Management System. The Spec

Translator then generated all required specification files necessary for

the CADPIPE ORTHO & ISO program from the MICROPIPE master.

. Piping Translator (PipeTran). This program reads the AutoCAD CADPIPE

ISO program bill of material file and creates a file that is directly

readable by the MICROPIPE Material Management Program.

CITGO Program Management Team

. Lead Cost Engineer on the Program Management Team. This five-year, $1.2

billion expansion project in the Lake Charles, LA. Refinery, contained 70

individual projects valued at $2 million to $350 million. The Program

Management Team was responsible for the overall schedule and cost

performance.

1986-1991 Jacobs Applied Technology

Orangeburg, SC

Project Controls and CAD Manager

. Key individual responsible for development and operation of

Engineering Automation Systems (including CAD) as well as the management of

all project control activities for the company, including: initial scope

definition and planning of work, cost control system implementation,

schedule development, and monitoring of all project control reports (cost

and schedule) to ensure that the actual expenditures were consistent with

the earned value of progress achieved.

. CAD Manager responsibilities included management of all aspects of

CAD operations, including maintenance of systems, technical support, and

development of specialized software needs and training of CAD operators.

. Working in conjunction with the Vice President of the Process Systems

Sector developed the Advanced Construction Technology Expert System (ACT),

an artificial intelligence computer program designed to give expert advice

to project managers and process engineers in determining the applicability

of ACT to their process projects.

1983-1986 Orangeburg-Calhoun Technical College

Orangeburg, SC

Adjunct Instructor AutoCAD

1981-1986 Fluor-Daniel

Houston, TX

Senior Cost Engineer

. Provided consulting services to Eastman Kodak's Rochester, New York

photographic film processing plant project in the People's Republic of

China.

. Supplied estimating & information system consulting services for

various ARAMCO, Saudi Arabian Royal Commission, and Shell Oil projects

while living in Saudi Arabia. Developed labor distribution system,

developed office estimating program, accounting, and cash flow programs

that accommodated ten different world currencies.

1980-1981 Fruco Engineers

St. Louis, MO

Lead Cost Engineer

. Performed cost control and estimating activities during the design and

construction of industrial projects.

1976-1980 Davy-McKee

St. Louis, MO

Cost Engineer

. Responsible for complete project costs, including monitoring all cost

data, trending analysis, quality analysis, and forecasting the total

projected final cost during all stages of the design and construction of

petrochemical projects.

1974-1976 Alden E. Stilson

Columbus, OH

Estimator

. Prepared engineer's estimates for municipal civil/sanitary and industrial

manufacturing projects.

Education 1974 Ohio University

Athens, OH

. Bachelor of General Studies



Contact this candidate