Post Job Free
Sign in

Project Manufacturing

Location:
961
Posted:
November 18, 2010

Contact this candidate

Resume:

Giancarlo Negroni Bigles (Lic. #*****) ****************@*****.***

Urb. Rio Hondo 2 AH28 Calle Rio Humacao, Bayamon, PR 00961 Tel. #

787-***-****

Profile Engineering Support with 2+ years of experience with Hamilton Sundstrand in

aerospace electronics manufacturing and 1+ with McNeil Consumer & Specialty

Pharmaceuticals.

Fast learner. Ability to work complex projects from concept to completion &

support phase.

Customer-oriented individual with strong leadership and communication

capabilities.

Organized, highly motivated and out-of-the-box problem solver. Proven

ability to work individually or as a team-player, multitasking individual.

Attention to detail.

Skilled in Relentless Root Cause Analysis tools, knowledge of Lean and Six

Sigma, 3P, VSM, TPM, QCPC, DMAI2C and Mistake Proof. Fluent in both English

and Spanish languages.

Computer literate trained in AutoCAD, C++, CorelDRAW, P-Spice, Assembly,

Microsoft Office Suite (including Project), MatLAB, PLC, JDE, MRP and SAP

systems.

Relevant Experience & Accomplishments

2005-2008 Engineering Aid/Manufacturing Engineer

Hamilton Improve WIP flow via increase in machine utilization rates and reduced

Sundstrand materials loss.

Santa Isabel Effectively manage manufacturing for several Boeing 787 programs.

Train, supervise and evaluate assemblers on current and new 787 products.

PR Design Job Instruction Sheets (JIS), Routings (RTG), Bill of Material (BOM)

and component placement, bake, clean, and coating manufacturing processes

from design schematics.

Ensure proper equipment calibration and preventive maintenance.

Manage product transition tables to feed accurate new-production schedules.

Plan and schedule production depending on parts, equipment and personnel

availability.

Achievements:

$4 million in savings due to scrap & variance avoidance in manufacturing

processes.

Maintained WIP flow complying with aggressive production schedule &

2003-2004 demanding internal and external customer needs incl. feedback to design

McNeil engineers and product managers.

Consumer & Enabled processing improvement of 400 weekly boards and processed 45 First

Specialty Piece Validations on Surface Mount Technology (SMT) production line.

Pharmaceuti- Implemented fixed, variable setups and ACE to achieve setup related

cals reductions.

Las Piedras Exceeded team weekly goal of 40 JISs; refined and implemented manufacturing

PR processes.

Project Coordinator

Prior Experience

Project coordination within the manufacturing and utilities, cost

improvement projects, allocation of resources and follow-thru until project

completion:

- Lighting Systems Retrofit including insect traps and occupancy sensors

for $100k in power and HVAC savings.

- Nitrogen Dispensing System Cryogenic Improvement for $11k savings

- Low Voltage 2500KVA Transformers Replacement to avoid related power

failures.

- TEAL project Laser Power Conditioner, Compressed Air Systems Dryer and

Sequencer, Boiler System and Low Voltage Transformer IQ/OQ, Commissioning

Validations & protocols.

- Bio-Diesel Fuel Alternative Study (with University of Puerto Rico-RUM).

- Manage Chance Control, DCRs and redline documentation.

Achievements:

Upwards of $100k cost-reduction savings and equipment updating.

Education B.S.E.E, Electrical Engineering University of Puerto Rico - Mayaguez

Community CIAPR Member - good standing, SAP ERP Solution Consultant, Knowledge of 21

Involvement CFR Part 11, FDA and FAA regulations, OSHA Construction Safety & Health

Consultant Lic.# 600278410. Honorably Discharged from the United States Air

Force, Lifeguarding/CPR experience. Department of Commerce - Census Bureau



Contact this candidate