Post Job Free
Sign in

Project Manager Engineer

Location:
Milwaukee, WI, 53223
Posted:
December 05, 2010

Contact this candidate

Resume:

Reginald B. Howard, P.E.

**** *. **** **, *** ***

Brown Deer, WI 53223

414-***-**** *********@*********.***

Energy MANAGER/program manager

Objective: To utilize over 20 combined successful years of full life cycle

project development to assist a progressive firm with managing and

developing their energy programs.

Summary

Over 20 combined years of successful full life-cycle project development,

project engineering, energy audits, construction management and business

development in an architecture and engineering environment, aviation,

manufacturing, and renewable energy market. Licensed PE in Wisconsin.

Currently working as the Sr. Project Engineer & Project Manager for

American Energy Consultants, Inc (AEC) where I am responsible for over

seeing all aspects of wind farm development and photovoltaic systems

development. In addition, while working as the lead electrical engineer at

Graef, Inc, I was responsible for leading the joint design efforts with

Johnson Controls, Inc on a 1.2 MW PV Array system for MATC College in

Milwaukee that was connected to the grid at sub transmission level

voltages. The MATC PV project included power distribution design, SCADA

system design, PV Array performance monitoring, laying out fiber cables and

unit substation design. I am also trained on WinPro software to perform

wind analysis, noise studies, optimized wind turbine layout and wind farm

energy calculations. I have working knowledge of PV Watts and I'm familiar

with the operations of Solar Pathfinder equipment. I am an experienced

project manager who is capable of managing projects from concept through

construction. Furthermore, I am a power user of MSProject, MS Excel, MS

Word, AutoCad and Power Point. I have proven project management skills and

I am comfortable handling numerous projects simultaneous in high-pressure

and demanding environments.

Project Management

. Project planning, and Control

. Cost Benefit Analysis

. ROI

. Energy Audits

. Replacement Cost Analysis

. Strategic Planning, Risk Management, Cost Estimating & Scheduling

. Team Leadership and Supervision

. Supervisor and Construction Management

. Quality Assurance & Control

UTILITY SCALE RENEWABLE ENERGY SYSTEMS DESIGN & STANDARDS compliance

. Wind & Solar Site Assessments

. PV Watts Analysis

. Solar Pathfinder Operations

. PV Array Design

. PV Panel Selection

. PV String Monitoring

. SCADA Controls

. RTU Interfacing

. Fiber Cable Layout

. Wind Farm Feasibility Studies

. WinPro Wind Analysis

. WinPro Noise Analysis

. Wind Turbine Selection

. Optimized Wind Turbine Layout

. Collector System Design

. Unit Sub Station Design Layout

. Utility & Transmission Line Operator Coordination

. Interconnection Agreement Compliance

. Power Purchase Agreements (PPA)

. New Electric Service Coordination with Utility

. PV Inverter Selection - UL1741

. NEC 690-PV Design

. FERC - Interconnections Std

. NERC Stds

Work experience

American Energy Consultants, Inc. (Contract Engineering Services) Brown

Deer, WI

Sr. Project Engineer 12/2009 to Present

. Responsible planning, budgeting and organizing the renewable energy

department.

. Responsible writing new project proposals and cost benefit analysis

. Responsible for performing wind farm and PV array site assessments and

feasibility studies.

. Responsible for designing collector system for wind farms and

designing power distribution for PV Array systems.

. Responsible for SCADA system design and fiber cable layout.

. Provided design oversight for a PV array project with sub metering at

Dane County Airport.

. Responsible for negotiating power purchase agreements with utility and

transmission line operators

. Responsible for meeting interconnection requirements including sub-

metering requirements for grid connected renewable energy systems

. Responsible for negotiating power purchase agreements with utility

companies and transmission line operators

. Responsible for coordinating all new substations and switch yards

designs with utility company.

. Performed financial analysis to obtain ROI for wind farm projects and

new renewable energy projects

. Performed business development for commercial energy audit projects

and renewable energy projects.

. Responsible for working with land owners to negotiate lease

agreements.

. Responsible for assembling and managing construction teams to

construct wind farms and PV Arrays.

. Provide root cause analysis for problems that occur on construction

sites.

. Manage and supervisor all sub contractors and sub consultants.

Graef-USA, Inc. (Engineering Services) Milwaukee, WI

Electrical Practice Team Leader/Project Manager 6/2007 to 11/2009

. Provided planning, organizing, budgeting, staffing and oversight for

the electrical department.

. Responsible for leading the electrical distribution system design of

the 1.2 MW Grid connected PV Array system for Milwaukee MATC School

joint project with Johnson Controls. Also performed SCADA system

design and fiber cable layouts.

. Evaluated PV Array string monitor systems.

. Performed power loop load study for Manitowoc Crane to evaluate the

need to upgrade cabling and transformers for new building loads. Also

evaluated energy consumption from 1 year of previous utility bills.

. Performed utility load analysis for large customers to determine if

they qualify for primary power distribution vs utility own equipment.

. Performed a lighting energy audit at Harley Davison Factory that lead

to a new high efficiency lighting design that utilized electronic

pulse-start Metal Halide bi-level switching for which the customer

obtained energy tax credits.

. Responsible for designing field lighting for four soccer fields for

the Village of Howard in Greenbay, Wisconsin.

. Performed outdoor stadium lighting design for Howard Soccer Field in

Greenbay, WI.

. Coordinated the design of the unit substation for the MATC PV project

with the utility company and Midwest transmission line operators.

. Perform design review of a PV array project with sub-metering at Dane

County airport terminal building in Madison, Wisconsin.

. Provided oversight of designed team that evaluated Kalahari 1 million

sq. ft. resort project for primary electrical service.

. Responsible for coordinating new electrical service with utility

companies.

. Worked with WeEnergies on PV Array project to obtain easement use

approvals.

. Responsible designing SCADA control system for the 1.2 MW PV Array

Systems.

. Responsible for construction oversight and creating punch list for

electrical projects.

. Wrote a master plan for Froedtert Hospital Milwaukee campus to correct

JCAHO MEP deficiencies, to analyze MEP equipment condition and to

evaluate life cycle replacement cost at 10 facilities covering over 3

million sq. ft.

. Performed wind power plant training sessions for engineering staff.

. Performed Wind Power Plant Design training to engineering staff

members and corporate wide.

. Performed short circuit and coordination studies for emergency

generator systems.

. Responsible developing firm's capability in the renewable energy

markets including: wind turbines and photovoltaic systems.

. Performed business development in the energy, commercial building and

Airport markets.

. Managed and directed the electrical power distribution systems design

projects for industrial clients such as Bucyrus, Manitowoc Cranes, and

many other commercial clients and municipalities.

. Wrote electrical proposals for new commercial building design

including fire alarms, and lighting systems.

. Responsible for profit and loses of electrical group.

. Provided mentoring, and supervised subordinate engineers and contract

employees.

. Setup and ran the quality control program for the electrical group.

. Responsible for signing and sealing electrical drawings.

Advanced Building Design, DBA (Consulting MEP Engineering Services)

Orlando, FL

PC Power Systems, Inc,

Orlando, FL 6/04 to 6/2007

Sr. Project Engineer/Principal

Chicago, IL 7/01 to 6/2004

. Responsible for planning, organizing, and budgeting for the electrical

group.

. Provide engineering services to Architecture and engineering firms.

. Coordinated new electric service with utility company

. Performed business development tasks and work fee proposals for new

clients.

. Provided supervision to subordinate engineers and sub contractors.

. Provided electrical distribution design for various types of

commercial buildings including restaurants, medical centers, shopping

centers, and office buildings.

. Responsible for providing AutoCad drawings of power plans, receptacle

plans, interior/exterior lighting plans, photometrics, lightning

protection plans, and standby power systems for commercial and

industrial clients.

. Prepared electrical, mechanical and plumbing cost estimates for

installing standby engine generators.

. Performed engineering service to Argonne National Laboratory client in

Chicago, IL.

. Perform power quality and energy management survey.

. Planned, organized, scheduled, and coordinated all electrical

distribution engine generator installation work via a national network

of electrical sub-contractors.

. Negotiated with vendors on equipment prices and lead times.

. Worked with 2002 National Electrical Code and RS Means estimator.

Technisource, (Engineering and IT Consulting Services) Downers Grove, IL

Test Engineer Consultant 6/99 to-6/01

Advanced Photon Source, Argonne National Laboratory - DOE Client

. Responsible for developing requirements, writing tests plans, and

developing test cases.

. Responsible for leading a design team to develop a first-of-its-kind

prototype automated real-time PLC software testing system using the

following software tools: Vali/Test Pro, WinRunner, Test Director,

Programmable Industrial Control Simulation, Allen Bradley's RS-Logix

5, and General Electric's Ladder logic software.

. Successfully, led a project team to implement Vali/Test Pro testing

methodology and to rewrite a validation testing procedures that was

used to test a PLC-based critical personnel safety system for a

Department of Energy client.

. Successfully, led a project team to research and developed a prototype

"Automated Real-Time Test System" (ARTS) that automated software

testing for a GE 90-70 PLC-based personnel safety systems for a

Department of Energy client.

Federal Aviation Administration (Great Lakes Regional Office) Des Plaines,

IL

(Airport Facility Construction)

Electrical Engineer 9/91-3/99

. Worked on a design team with Architectures, civil engineers,

mechanical engineers and electrical engineers to design electrical

distribution systems, switch gear, interior & exterior lighting,

telephone systems, fire alarm systems, security systems, lightning

protection and emergency engine generator (E/G) systems for the

administrative building annex to the air traffic control towers (ATC)

based buildings throughout an 8 state region.

. Performed electrical inspections, energy audits, and power quality

surveys at airport facilities towers.

. Prepared site surveys and construction oversight inspections.

. Responsible for developing the engineering concept, writing the

specifications and preparing drawings for the development of a first

of its kind mission critical touch screen programmable logic

controller (PLC) based control system for approach lights at O'Hare

International airport.

. Responsible for leading and managing a team of construction

contractors to install the newly designed computer controlled

approached lighting system.

. Successfully managed, facilitated, and coordinated project meetings

between engineering staff, air traffic management, union

representatives and contractors during the development of the FAA's

first of its kind touch screen control system for approach lights at

O'Hare Control Tower.

. Developed drawings using Microsoft Viso, and AutoCAD. Worked with

National Electrical Code and RS Means estimator.

. Responsible for organizing and managing a power quality team of

experts that performed power analysis on sensitive electronic

equipment at O'Hare International new air traffic control tower.

Oneac Corporation (Power Conditioning Equipment Manufacture) Libertyville,

IL

Design Engineer 5/89 to 11/90

. Assist plant managers with the implementation of just-in-time

manufacturing.

. Designed, built, tested and maintained power protection filters for

fax machines, copy machines, and telephone lines in accordance with

Underwriters Laboratory (UL) standards 1449 and 1283.

. Tested filter products for UL compliance and wrote test reports for

submittal to UL for copier filter products.

. Responsible for leading a design team that cost reduced copier filters

by 13%.

Education

B.S., Electrical Engineering, Old Dominion University, Norfolk, VA

1989

Certificate in Business Management, University of Maryland, Far East

Division 1984

Associate of Applied Science, Electronics Technology, Community College of

Air Force 1984

Maxwell AFB, AL

Transmission & Distribution World University Online Courses

2010

. Transmission Line Protection

. Transformer Protection

. Power System Protection/Relay Coordination

. Power System Grounding

. Switchyard Configuration

Certificates

University of Wisconsin-Extension, Madison, WI

. Fundamentals of Wind Power Plant Design

. Protection of Industrial/Commercial Electric Power Distribution Systems

. Coordination Industrial/Commercial Electric Power Distribution Systems

. Effects of non-Linear Loads on Power Distribution Systems

EAPC

Grand Forks, North Dakota

WinPro Software (Wind Analysis & Wind Farm Design) 2010

Certificate

Professional Affiliations

Member of the Institute of Electrical and Electronic Engineers Power and

Computer Society

Licenses

Professional Engineer in Wisconsin

Licensed Private Pilot

Military

Served in the United States Air Force's 5th Combat Communications Group as

a Telecommunication Systems Maintenance Specialist.

PUBLICATIONS & PRESENTATIONS

. Co-authored White Paper "Automated Real-Time Testing (ARTS) for

Embedded Control Systems" The International Symposium on Product

Quality & Integrity, Conference January 28-31, 2001

. Authored White Paper "Automated Testing for Programmable Logic Control

Systems", STARWEST 2002 International Conference on Software Testing

Analysis, Conference November 4-8 2002

. Recognized in May 8, 1995 Electronic Engineering Times Magazine for

Touch Screen Work At O'Hare ATCT

References available upon request



Contact this candidate