Tinley Park, Illinois ***** Phone 815-***-****
E-mail *************@*****.*** Paul E. Hinderman
Objective To secure a position as a Project manger/Planner where my
experience of over twenty years with an industry leading
company will be utilized.
Work History
Commonwealth Edison ~ 1988-2010
2007 - 2010 Senior Engineer/Project Manager
. Facilitate customer meetings to define project scope and
verify project requirements.
. Accountable for planning entire scope of project
objectives mainly: cost, time, material, material
availability, and quality.
. Schedule crews according to capability to perform jobs
accurately
. Hold initial meetings with customer then prepared cost
estimates, contracts, and construction schedules using
Excel.
. Responsible for monitoring job site before, during, and
after job is complete
. Constantly monitor both work and material to ensure the
proper procedures and optimum quality is being achieved
. Ensures adequate parts inventory and manage maintenance
parts, their availability while always keeping within
budget
. Responsible for continuously introducing new and
changing safety processes and ensuring a safe working
environment for the maintenance crews and supervisors
. Ensures that all work is performed to the quality
standards set forth by the company and that any
modifications are done to the approved standards.
. Responsible for monitoring the daily incoming work and
adjusting schedule to get optimum performance from
maintenance crews including long range planning
. Act as a leader and go between to ensure proper
relationship between management and union employees
. Maintain excellent written and oral skills to properly
manage the day to day work while constantly monitoring
the incoming work for any chance to introduce cost
effective changes to the schedule
. Participate in annual training programs that ensure up
to date understanding of all practices and procedures.
. Responsible for the protection of company assets.
Monitor audit of inventory on hand, making sure both in
stock and materials on trucks are tracked appropriately.
. At completion of projects create reports giving an
overview of customer needs and company solution
. Assure that inventory and material are restocked to the
required standards of the material team.
. Proficient in Excel, all Microsoft processes, Passport,
Maximo, Autocad
2001 - 2007 Work Management/Inventory Planner
. Responsible for attending daily meetings to screen
incoming work, take work in a designated area and place
it in the schedule accordingly.
. Responsible for scheduling crews to perform planned
maintenance according to abilities, screening crew
members and maintaining all employee files
. Interface and collaborate with Work Management, Supply,
Operations, and Engineering to identify and resolve
customer needs.
. Provide direction to the Maintenance Departments for
corrective maintenance repairs, predictive maintenance,
preventive maintenance and the execution of
modifications and projects.
. Determine procedures, drawings, equipment, estimated
time, materials and specialized labor required to
perform planned work packages.
. Prepare work packages for work to be performed by the
respective maintenance departments to insure that the
maintenance is performed in a safe, reliable, and
efficient manner, in compliance with the QA manual,
company policies, procedures, and applicable codes and
standards.
. Responsible for totaling time and hours for payroll on a
weekly basis and entering into Passport, as well as
making any adjustments and verify receipt by corporate
payroll.
. Responsible for conducting interviews and screenings for
possible crew members according to abilities
. Responsible for dealing with grievances and follow up
according to procedures laid out in both the union and
Comed handbook. Documenting and ensuring that any
disciplinary actions are properly carried out.
. Perform random checks on crews to make sure that they
are following proper procedures including proper dress
and safety gear
. Identify, coordinate and schedule any training that is
needed for crews under my management.
. Ensure Technical Service associates are trained and
required certifications are obtained.
. Recommend and execute strategies for completing annual
programmatic maintenance and improving maintenance
completion within Operations.
1988-2001 Design Drafter/Tech Electrical Engineering Department
. Design Draftsman utilizing board, Autocad (10 years),
and SAP
. Create blue print drawings for construction
. Design complete Comed substations including building
layouts and equipment placement
. Wiring from schematics
. Design one-line diagrams and relay panel layouts
. Create cable tables
. Prepare final drawing packages for construction issue
. Update as-built/record work drawings after construction
. Senior designer of Comed Concept Substation which is a
substation completely constructed off-site and set in
place
1985-1988 Olympic Body Building, Inc. Tinley Park, Illinois
. Owner, Operator
. Coordinate complete day to day activities for the
business
. Personal trainer
. Competitive body builder
. Sports Enthusiast
Education
. Western Carolina University, Cullowhee, North Carolina
. South Suburban College, South Holland, Illinois
. Graduated Tinley Park High School, Tinley Park, Illinois