Joseph Messina
**** ********* *****, ****** ****, IL 60477
Home 708-***-**** / Cell 708-***-**** / Email: **********@*********.***
Objective To obtain a full-time job as a Stationary Engineer.
Profession Building Engineer
al History (November 2009 - December 2010)Elysian Hotel, 11 East Walton St. Chicago,
IL - Building engineer assisted in the operation and maintenance of
assigned equipment in building and power plant of a 188-room hotel, 60
unit condominiums, 11,000 square foot Spa, 3 restaurants, and 2 kitchens.
Maintenance includes heating and air conditioning, refrigeration,
electrical, plumbing, carpentry, painting, locksmith, kitchen equipment,
swimming pool maintenance. Assisted in the operation and maintenance of
building systems listed below.
Building Engineer
(July 2008 - July 2009)
Hotel Burnham, 1 W. Washington St., Chicago, IL - Building Engineer
assisted in the operation and maintenance of assigned equipment in
building and power plant of a 122-room hotel with plumbing, electrical,
carpentry, painting, concrete, carpet installation and repair, TV
installation and repair, wallpaper repair, and Locksmith doors, locks, and
key repair. Maintained 2-pipe chilled water system and 180-volt electric
heat in hotel rooms. Assisted in the operation and maintenance of
building systems listed below.
Trainee Engineer
(February 2006 - June 2008)
Embassy Suites Lakefront, 511 N. Columbus Dr., Chicago, IL - Trainee
Engineer assisted in the operation and maintenance of assigned equipment
in building and power plant of a 455-room hotel with plumbing, electrical,
carpentry, TV installation, wallpaper, 2-pipe chilled water system, and
180-volt electric heat in hotel rooms. Assisted in the operation and
maintenance of building systems listed below.
Trainee Engineer
(April 2005 - October 2005)
Golub and Company, Chicago, IL - Trainee Engineer assisted in the
operation and maintenance of assigned equipment in building and power
plant.
Building Systems:
Air Handling Units, York - 11 (10, 15, 20, 40, 50 HP); Air Volume Units,
Variable, Titus - 30
Boilers, Bryant - 3 (150,000 BTU's each)
Chilled Water Pumps, Bell and Gossit - 8 (15, 30, 130, 150 HP)
Chilled Water Pumps - 2 (20 HP, 480 Volt, 47/23.5 AMP, 3 PH, Marathon
Motor)
Chillers, Carrier - 3, Refrigerant R134A (800 tons each)
Circulating Water Pumps - 7 (3/4, 1.5 HP); Condenser Water Pumps - 3 (50
HP), Bell and Gossit
Coolers, Bohn/Heatcraft - 3, Refrigerant 404A; Cooling Towers, B.A.C. - 3
Dishwasher, Hobart / Dectron Unit
Exhaust Fans, Basement, Kitchen, and Bath (3 HP, 1725 RPM, H2-60, 230/460
Volts, 8.2/4.1 AMPS,
Baldor/Magnatex Motors)
Exhaust Fans, Green Heck - 4 (1/2, 1/3, 3/4, 7.5 HP); Exhaust Fans, York -
2 (25, 40 HP
Fan Powered Boxes, Titus - 55; Fire Pump, Hubbell (100 HP, 116 AMPS, 460
Volts)
Gas Booster - Spencer 20" Herneth (1 HP, 3/60/3500 RPM, 460 Volt, 1.9 AMP)
Hot tubs (12-1500 Gallon)
Hot Water Boilers, Teledyne Laars Gas Fired
Hot Water Heaters, Luchin VAR Gas (1, 2 HWH, 1,435,000 BTU Input, Relief
Valve - 150#, 120-180 degrees F, Comb. Air - 1.4-1.7 WC, Draft 02-07 WC,
Gas Pressure 5 WC, - Min. 10 WC Max, Regulator Side-3.5 WC-4WC)
Hot Water Pumps, Bell and Gossit - 5 (15, 50 HP; Hot Water Pumps, High
Zone/Low Zone
Hot Water Storage Tank (940 Gal., Relief Valve RIV-101019, 750,000 AGA
Rating)
Ice Machines, Hoshizaki - 21 / Ice Storage Bins, Follett - 3; Ice
Machines, Manijowoc - 3
Jade convectional ovens
Motor, Magnatek (AHU 1.2.3., 230/460 Volt, 19/9.5 AMP); Pump, Jockey (3
HP, 4 AMPS, 460 Volts)
Recirculating Pump, Low Zone (2 HP, 3450 RPM, 3 phase, 46 Volt)
Sewer Ejector System, Metropolitan Duplex (460 Volt, 1 HP, 3 phase, 2.4
AMP, 1735 RPM)
Steamers, Vulcan - 2 / Steamers, Groen - 2
Sump Pumps, Comed, Duplex 1735, and Elevator 4 (2.4 AMP); Metropolitan (2
Motors, 460 Volt, 1 HP, 3 phase)
Swimming pool (18,000 gallon); Voltage (110 and 220)
Water Pressure Booster System, Metropolitan Domestic (25 HP, 3500 RPM)
License/ City of Chicago Stationary Engineer's License (April 2008)
Education CFC Certified Type I and II (July 2011)
Illinois swimming pool operators certification (March 2011)
International Union of Operating Engineers Local 399, Chicago, IL (August
2004 - Present)
Courses completed:
Boiler Class Electricity
Class
Heating and Air Conditioning I Heating and Air
Conditioning II
Testing and Balancing HVAC Controls
Facilities Maintenance
Victor J. Andrew High School, Tinley Park, IL (Diploma May 2004)
References available upon request.