Tianmu Jia
*** ********* *****, ********, ** ****4. (909)- 528- 7321.
Email:*********@*****.***.
EDUCATION
Master of Science, Civil Engineering (Geotechnical)
University of California, Los Angeles, Graduated: 06/15/2012
AWARDS/CERTOFOCATIONS
Excellent Student of Beijing University of Civil Engineering & Architecture, 2009-2010
First- Class Merit-based Scholarship,2009-2010
Third-Class Merit-based Scholarship,2008-2009
Third-Class Merit-based Scholarship,2007-2008
Winner's Prize for Structure Bearing Capacity Competition,2008-2009
Recognition Award for Engineering Calligraphy Competition,2007-2008
RELEVANT COURSES
Advanced soil mechanics, Advanced Cyclic and Monotonic Soil Behavior
Advanced Foundation Engineering, Slope Stability and Earth Retention Systems
Geo environmental Engineering, Numerical Methods in Geotechnical Engineering
Environmental Engineering, Earthquake Ground Motion Characterization
Steel Structure, Probability and Statistics for Engineers
Concrete Structure, Civil Engineering Construction
Civil Engineering Economics, Construction Project Budget
Road Engineering Construction, Underground Engineering Construction
Construction Management
SKILLS
Computer experience:
. Microsoft Office: Word, Excel, Power Point
. AutoCAD, SAP (Structure Analysis Program), Matlab, Slide5.0, FLAC
Communication/Organization Skills:
. Excellent writing skills, experience in writing technical lab reports
. Fluent oral skills
WORK EXPERIENCE
Assistant Designer (Intern)
Tong Cheng Fan Hua Architec&Eng CO.,Ltd Beijing, China
05/2010 - 07/2010
. Assisting designers in layout design and drawing works using SAP
and AutoCAD
. Completed the structural design for a residential condominium
building and a number of AutoCAD blueprints within two month
period
Assistant Constructor (Intern)
4th Engineering of Beijing Municipal Construction Group, China
07/2010 - 10/2010
. Aided Project Manager in construction site management and
relevant operational technique support
. Made grooves and poured concrete for ground
. Installed gantry cranes
. Monitoring shield machines.TBM(Tunnel Boring Machine)
. Built charging rooms and concrete mixing plants
. Finished the construction of subway station superstructures in
Beijing
VOLUNTEERING EXPERIENCE
Volunteer, International Association of Chinese Geotechnical Engineers.
2011-Now
Volunteer, Young Volunteers Association
2008-2009
. did voluntary works in the national library
. served in the Federation of the Disabled
Volunteer, Zhiren Association
2007-2008
. helped neighborhood committees to conduct census
RESEARCHS AND PRACTICES
. Research on Soil Mechanics, Engineering Geology etc,
2008-2010
. Project of The analysis of nonlinear earthquake resistant factors of
large-scale substructure in Beijing and appropriate measures,
2008-2010
. Graduation Project: Design of Deep Foundation Pit. (Support pattern,
Dewatering pattern, Box foundation design)
10/2010-06/2011
. Project of Slope Stability and Earth Retention Systems: Contract for
Geotechnical Engineering Study, Undisclosed Site, Hillside, California
02/2012-03/2012
. Project of Numerical methods in Geotechnical engineering: The
behaviors of beams
and piles on nonlinear elastic foundations
05/2012-06/2012