Post Job Free
Sign in

Electrical Control

Location:
Round Lake, IL
Posted:
December 05, 2012

Contact this candidate

Resume:

NIMAL JAYASINGHE

**** ******** ***.

SKOKIE, ILLINOIS 60077

TEL: (Home) 847-***-****

(Mobile) 847-***-****

SUMMARY OF EXPERIENCE

Over 25 years of Electrical Design experience associated with the design

and implementation of electrical power distribution systems for electric

utilities, industrial facilities, chemical plants, nuclear and fossil

power generating stations. My experience also encompasses substation

engineering design, associated with relay and line upgrades, SCADA

systems, and related relay control and protection projects. And

experience encompasses electrical substation and transmission facilities

voltages including 12KV, 34.52KV, 69KV, 138KV, and 345KV.

I was responsible for performing and supervising electrical design work

associated with a wide range of electric power generation projects,

substation and transmission projects, and electrical distribution systems

associated with large industrial facilities including both power

generation, steam generation, and co-generation facilities.

WORK HISTORY:

MIDDOUGH INC. August 2011 - November 2011

Holland, Ohio

Senior Electrical Designer

. Provided engineering and design support for Installation of new PLCs

in different area Control

Centers in the BP Husky plant in Toledo Ohio. Issued plan drawings and

panel schedules for the PLC's.

. Field verified many Panel Circuits at various Switch Rack Power Panels

and provided updated Panel Schedules for the purpose of supplying

power to various instruments.

. Conducted Plant walk-downs to complete all electrical inspection for

installation of safety beacons

and sensors for the rapid evacuation of Plant personnel and visitors.

. Designed and issued overhead and above ground conduit plans for the

installations of Beacons

Sensors.

. Incorporated the use of AutoCAD and many Windows software applications

such as Microsoft

Office Professional Windows, Microsoft word, Microsoft Access and

Microsoft Excel.

PCI MANAGEMENT & CONSULTING COMPANY August 2008 - May 2010

Schaumburg, Illinois

Senior Electrical Designer

. Provided engineering and design support for various system protection

and substation projects including the village of Chatham, main

substation at Chatham, Illinois. Also provided relay and line upgrade

for 34.5KV and 138KV Power Distribution Systems. Created Relay Panel

and Control Panel drawings, Relay and Control Schematic & Wiring

diagrams for Protection and Control of

the Substation. Produced One Line and Physical Layout drawings

when needed.

. Provided engineering and design support for Luftkin Bio-Mass energy

project, in Luftkin, Texas. Created single line and schematic diagrams

for various Switchgear and Motor Control Centers. Produced three lines

Current and Potential diagram for 138KV/ 13.8KV GSU Transformers.

Provided Switchyard Physical Arrangement drawings by the Power

Generating area. Produced many Physical Layout drawings including

Underground Conduit layout drawings. Created bill of material, station

equipment specifications and wiring schedules.

. Incorporated the use of AutoCAD & Microstation and many Windows

software applications such as Microsoft Office Professional Windows,

Microsoft word, Microsoft Access and Microsoft Excel.

AMERICAN ELECTRIC POWER COMPANY May 2008 - August

2008

Columbus, Ohio

Electrical Designer

. Provided electrical design for many relay control and protection

projects including RTU installations

For voltages 12 KV thru 345KV.

. Provided electrical design for point to point wiring and inter panel

wiring and layouts of relay panels and substation control panels.

. Prepared schematic, wiring diagrams, motor control center diagrams,

and power distribution for power generation projects.

. Provided engineering and design support for various system protection

and substation projects including relay & line upgrade and Physical

drawing changes.

. Incorporate the use of AutoCAD & Microstation and many Windows

software applications.

AMBITECH ENGINEERING May

2007 - April 2008

Downers Grove, Illinois

Senior Electrical Designer

. Involved in the Modification and Upgrades of Sulfur Recovery Unit at

Exxon Mobil

Plant in Joliet Illinois. Created new Junction Boxes, Conduits and

Cables connecting various new and existing Instruments such as

Electrical control elements, Pressure switches, Limit Switches,

Temperature elements, Solenoids etc. Designed home run conduits and

cables to the control center at the Mic building.

. Provided Electrical Design, working with client's Recommendations of

Panel Layout and showing proposed device locations with the help of

Piping Isometric drawings.

. Performed Field Walk downs, to the Sulfur Recovery Unit., and various

instrument

locations. Located sites for new Junction Boxes and various

Instruments.

. Issued Bill of Materials. Provided detailed Scope of work report, Turn

around and Pre turn around Reports.

. Incorporated the use of Microstation & many Windows software

applications.

PATRICK ENGINEERING

September 2006 - May 2007

Lisle, Illinois

Electrical Designer

. Provided Electrical Design Support for Underground Duct Bank &

Overhead Power Distribution system for voltages ranging from 12KV thru

345KV for Commonwealth Edison Company's, Chicago North Office.

. Created Electrical Design of power distribution diagrams for

residential and commercial

Customers of city of Chicago. Produced electrical and fiber

transmission and distribution

Map diagram for the city.

. Performed field walk down to various site locations.

. Incorporated the use of AutoCAD and many Windows software

applications.

QUALITECH ENGINEERING

March 2006 -September 2006

Chicago, Illinois

Senior Electrical Designer

. Involved in the modification and upgrade of Selenese, Schreveport and

Welsh

Substations in Texakarna, Texas.

. Replaced and upgraded existing DC panels, Relay and breaker control

panels for 345KV

And 138KV lines. Schematic and wiring diagrams were revised or new

diagrams were designed as needed. New junction boxes were added as

needed. New cables were added to all panels and junction boxes.

Created new cable list and material list to all substations.

. Was involved in the TSS 80 Pontiac Substation 138KV SCADA RTU

replacement and

Annunciator removal project for Commonwealth Edison Company.

. Make design changes on schematic and wiring diagrams for tripping

connections. Also did Design changes on transformer bus and phase

shifter drawings.

. Revised conduit and cable table listing drawings.

. Incorporated the use of Microstation.

Jacobs Engineering July 2005 - February

2006

Indianapolis, IN

Electrical Designer

. Responsible for lighting specifications, conduit and cable trays, MCC

schedules, issuing electrical load lists, material take-offs, and

power plan drawings showing transformers and fan locations.

. Involved in the boiler upgrade project for Eli Lilly Company.

. Setup new 15kV substation with 1500kVA rated transformers, two new

motor control centers, numerous lighting and power distribution

panels.

. Produced detailed drawings of lightings fixtures.

. Developed power and lighting plans, single-line, schematic,

connection, and control wiring diagrams.

. Designed and developed detailed grounding drawings for the load center

and the pipe/cable tray.

. Incorporated the use of AutoCAD.

SARGENT & LUNDY Oct. 2004 - May 2005

Chicago, Illinois

Electrical Designer

. Responsibilities include designing Wiring Diagrams for PLC upgrade for

Lower Colorado River Fayette Power Project in Austin, Texas. Voltage

range for Control Wiring from 24V DC, 125V DC and120V AC. Power Source

were From MCC or the Load Center or other external source.

. Upgrade included many modifications of the PLC Rack Arrangements and

new Wiring Design for various Conveyor Systems, Unit Three Thickener

System, Flocculent System, Filter Feed Pumps, Thickener Under Flow and

various other Devices. Incorporated the use of Auto-Cad 2002.

ENERGY ENGINEERING Oct. 2001 - August 2002

Woodridge, Illinois

Electrical Designer

. Responsibilities include creating Physical and Wiring Diagrams for

Substation, Control, Meter

and Computer buildings.

. Designing Conduit layout and wiring for Lighting Receptacles and

switches. Creating Area Classification Drawings. Incorporated the use

of Microstation and AutoCAD.

. Design and development of Piping and Instrumentation Drawings for

Natural Gas Pipe Line Companies.

RAYMOND PROFESSIONAL GROUP INC. Oct. 1997 - August 2001

Chicago, Illinois

Electrical Designer

. Electrical Engineering Design Team Member; Designed Electrical Wiring

and Schematic Diagrams for Commonwealth Edison Fossil Power Stations

at Collin and Will County.

. Projects include Turbine Control, Unit 5FD & ID Fan Cooling System,

High Pressure Service Water Pumps, Stamet Feeder and Cyclone Air Flow

modification. Submitted Transmittals and Drawing Schedules for

Construction & Demolition Projects.

. Produced I/O Designation Drawings for Bailey Termination Cabinets,

Produced Single Line and Wiring Block Interconnection Diagrams for

Turbine Control and Instrumentation, Documented Cable Schedule and

Tabulation. Involved in walk down and Inspection on sight locations.

. From January 1999 to March 2001 worked for Commonwealth Edison

Company's System Protection Department at Willow Brook. Assisted in

various System Protection and other Substation Projects, Including

Digital Fault Recorder, Audio Tone Cabinets and Transformer Relay and

Line Upgrade for 138/ 345kv & 34kv Lines. Designed and developed SCADA

diagrams for many substation projects.

. Performed walk downs and inspections at various substations.

Incorporated the use of AutoCAD.

KRACK CORPORATION January

1994- June 1996

Franklyn Park, Illinois

Electrical Designer

. Responsibilities include designing schematic and point to point wiring

diagrams for refrigerant systems.

. Acted as liaison between the plant Personnel and the engineering

design team related to design matters.

. Designed control panels and equipment layout for Refrigerant Systems

used in food processing plants and Cold storage rooms in supermarkets.

. Sheet metal fabrication for control panels. Implemented programs to

standardize control schematic diagrams according to customer

specification and utilizing time saving methods. Incorporated the use

of AutoCAD.

RAYTHEON ENGINEERS Oct. 1990 - November 1993

Downers Grove, IL

Electrical Designer

. Enhancement of wiring and physical drawings for supervisory control

and data acquisition (SCADA) Project, Commonwealth Edison Company

Fossil substations. Designed point to point wiring diagrams, single

line diagrams.

. Provided Electrical Design working with client's Relay Recommendations

and/or marked prints of Schematics showing Protection and Control

Logic; Panel Layout showing proposed device locations; One-Line

Diagrams showing Breakers, Transformers, CTs, PTs, etc.

. Performed the Design of Field Wiring, Remote Terminal Units (RTU),

Digital Fault Recorders (DFR) and SCADA Units inside an electrical

substation.

. Created Cable Diagrams and Charts. Created Removal and Addition sets

if required. Prepared Final Construction Sets. Prepared Material

Lists.

. Incorporated the use of AutoCAD.

AMBITECH ENGINEERING Jan. 1988 - September

1990

Glen Ellyn, IL

Electrical Designer

. Designed and developed Power Distribution and Lighting wiring and

layout Diagrams for Commercial and Industrial buildings. Produced Bill

of materials and Fixture schedules etc.

. Designed cable tray and conduit layouts, support drawings and

electrical wiring diagrams.

. Performed field walk down for electrical, piping and instrumentation

installation design for Quantum Chemicals Corporation in. Reviewed and

issued wall penetration drawings. Client companies; petrochemical and

oil refineries.

JOHNSON & JOHNSON PRODUCTS Jan. 1985 - December 1987

Electrical designer

. Designed and developed equipment layout for control panels for

conveyor systems. Designed ladder logic diagrams for programmable

controller system for conveyors.

. Walk down analysis and inspection. Preparation of bill of material.

. Responsibilities were developing layout & wiring diagrams for control

panels; designed & drafted control schematic diagrams and Point to

point wiring. Diagrams.

. Producing pneumatic control diagrams.

. Preparation of bill of materials.

EDUCATION:

NORTHEASTERN ILLINOIS UNIVERSITY

Chicago, IL

Bachelor of Science: Major - Physics 1985

WRIGHT JUNIOR COLLEGE

Chicago, IL

Associate of Science: Major - Engineering 1979

TECHNICAL PROFICIENCY:

. Proficient in many Windows software applications such as Microsoft

Office Professional Windows, Microsoft Word, Microsoft Excel,

Microsoft Access; Programmable Controller, Auto Cad and Micro Station.

. Proficient in many Electronic Test Equipment includes Power Supply,

Wave Form Generator, Volt Meter, Amp Meter & Oscilloscope.



Contact this candidate