Chad M. Perkins *** Congress Street, Charleston, SC 29403
**********@*****.***
Professional Summary – Accredited General Contractor with 5+ years of relevant industry
experience. Specialize in Project Management and possess strong leadership skills.
Experience: Dooley Mack Constructors Charleston, SC
Estimator/Project Engineer November 2011- Present
Lead estimator in bidding multiple projects simultaneously ranging from 700K - 1.5 million.
Prepared, coordinated, and organized all asp ects of the pre-bid process for various project
types. Responsible for coordinating with all subcontractors of the 16 CSI divisions to assure
estimate scope completeness for all trades. W ould review and prepare project durations for
project estimates.
Review and prepare all bid documents for submission to project owner. Responsible for all
project estimates using Timberline Estimating Extended software, Earthworks software and
personal takeoffs templates.
Carolina Safety Consultants/ Pattillo Construction Charleston, SC
Safety Coordinator/Project Supervisor March 2011- November 2011
Safety Coordinator for the construction of the BOEING IRC Facility located in Ladson, SC.
Coordinated, managed, and consulted safe work practices of multiple trades for the duration
of the construction process of the Boeing fabrication facility in compliance, and exceeding
OSHA construction standards. Reviewed subcontractors jobsite/job specific safety plans prior
work beginning onsite to ensure safe work methods and procedures. Consulted with project
managers, superintendents, and foremen to ensure safe daily work activities.
Maintained a perfect safety record with no recordable accidents throughout the construction
duration. Gained valuable project experience with all CSI divisions for field coordination and
job implementation. Maintained daily work logs of construction activities.
Pompano Masonry Inc. Charlotte, NC
Project Manager/ Estimator February 2010- March 2011
Estimated turnkey masonry projects, acquired and negotiated job terms/contracts with
various major general contractors for masonry projects ranging from 250K- 10M. Managed
multiple masonry projects simultaneously while estimating numerous new projects.
Responsible for maintaining and assembling project submittals, LEED documentation, PO’s,
RFI’s, generating change orders, project PM correspondence and management, materials
and equipment procurement, quality control and project documentation, managed various
third tier subcontractors, project closeout documents and warranties.
W on multiple hard bid/public opening bid turnkey masonry projects by less than a 3% margin.
Nunn Construction Inc. Colorado Springs/Gunnison, CO
Project Engineer March 2009- September 2009
Project: New LEED Gold Rated Student Union for Western State College valued at over $32
Million dollars.
Coordinated, implemented, and maintained quality control plans for following trades: Stucco,
masonry, precast, exterior steel, rough openings and windows, exterior and window blocking,
hardscapes, and landscapes.
Managed multiple daily field activities, and maintained historical docu mentation for project
completion stages.
Page 1 of 2
C. F. Evans Charleston, SC
Assistant Superintendent June 2008- January 2009
Composed, implemented, and maintained construction schedule to manage multiple
subcontractors for high paced multifamily construction projects.
Performed daily safety inspections for site safety, maintained historical documentation and
project progress with daily logs.
Composed punch lists for interiors and exteriors to maintain Quality Control and managed
work completion in multiunit buildings.
Performed Field Estimates and quantity takeoffs, managed material ordering and tracking in
multiunit construction.
Brasfield and Gorrie Atlanta, GA
Summer Intern May - August 2006 and 2007
W orked directly with Project Managers and other interns in the pre-bid
stages of multiple commercial construction projects to prepare bid documents.
Communicated with suppliers and subcontractors to coordinate work schedules and punch
list deadlines.
Estimated building quantities based on construction drawings ; prepared and organized
informative charts to communicate quantities.
Communicated with city officials to obtain permits, site addresses, and utility information.
Chandler Construction Services, Inc. Greenwood, SC
November 2006 – January 2007
Project Intern
Assisted in the preparation of payment applications by collecting field measurements,
quantifying percent complete, and verifying stored materials.
Reviewed construction drawings, completed quantity surveys and prepared purchase orders.
Education: Clemson University Clemson, SC
B.S. Construction Science and Management May 2008
Minor- Business Administration
3.3 cumulative GPA
The Citadel- The Military College of South Carolina Charleston, SC
Masters of Project Management Anticipated May 2013
Trident Technical College- AutoCAD Certificate (May 2012) Charleston, SC
Accreditations LEED Accredited Professional- June 2009,
& Skills: General Contractors License for North and South Carolina- June 2010
AutoCAD, On-Screen/Plan Swift Quantity Surveying program, Cost Works estimating program,
Suretrak Project Scheduling program, Project buyout/closeout, Earthworks, Estimating Extended.
Honors &
Activities:
NCMCA Masonry Contractors Certification Program, Oct. 2010
Certified Associate Constructor by American Institute of Constructors (AIC)
Completed OSHA 30 Hour Training
Certified in First Aid Training (May 2011)
Certified in Blood Pathogen Training (May 2011)
Maintained Life Scholarship throughout four years at Clemson
Active member of Clemson Constructors Guild
Member of Kappa Sigma Fraternity
Studied Abroad in Australia - Fall Semester 2006
Page 2 of 2