Post Job Free
Sign in

Mechanical Project

Location:
Vienna, VA, 22181
Posted:
November 30, 2012

Contact this candidate

Resume:

MOHAMMAD AKBAR NOWROUZ

***** ***** **** ( Vienna, VA ( 22181

Home :703-***-**** ( Email: abgf7d@r.postjobfree.com

CAREER PROFILE

Mr. Nowrouz has over 27 years of experience in the design of mechanical and

plumbing systems for new construction projects as well as renovation and

tenant improvement projects. As senior project designer, Mr. Nowrouz has

been responsible for load calculations, equipment selections, design and

layout of heating and air conditioning systems, ductwork and piping layout,

design and layout of plumbing and fire protection systems, and office

standard HVAC and plumbing details for more than 40 million square feet of

projects.

Technologically skilled in the following software: AutoCAD, Revit,

Microsoft Office Suite

Citizenship: Duel citizenships from United States and Afghanistan

Member: ASHRAE

EDUCATION

Amani High School, 1971 - Kabul, Afghanistan

Kabul University, Faculty of literature 1972 - 1976 - Kabul, Afghanistan

Afghan National Army, 1976 - 1977- Kabul, Afghanistan

Political Asylum to the US, - 1979

Heath Institute of Technology, 1980 - 1984 San Francisco, California

DIPLOMA: Piping/Mechanical Design

Ariana Afghan School, 1986 - 1996 Annandale, Virginia

PROFESSIONAL EXPERIENCE

Dewberry Company April

1985-

September 2012

Senior Mechanical/Plumbing Designer

Fairfax, Virginia

WFT Engineering, Inc.

September 2012

Mechanical/Plumbing Designer

Gatesburg, Maryland

. Responsible for the design of mechanical and plumbing systems for

commercial office buildings, tenant interiors, cafeterias, conferencing

centers, classrooms, and computer rooms

. Duties performed include HVAC load calculations, equipment selection,

design and layout of HVAC systems, specification editing, and overall

project coordination with other trades

. Extensive experience in the creation of HVAC and plumbing system

details

. Specialized in plan and sectional views showing spatial relationships

of mechanical/electrical/plumbing systems particularly within building

central plant/penthouse.

. Coordinated the design of mechanical systems with electrical, plumbing,

structural, and architectural trades during the design and construction

of all projects

. Reviewed shop drawings and submittals and performed field reviews

during construction phases of core and shell buildings and tenant

interiors

CURRENT/PAST PROJECTS; WASHINGTON, DC METRO AREA

Office Buildings

1812 North Moore - Rosslyn, VA

. 600,000 SF, 35 Stories, commercial office building with provisions for

retail/restaurant tenants and 5 story below grade and 4 story above

grade parking. LEED Platinum anticipated.

City Center - Washington DC

. 500,000 SF, commercial office building with provisions for

retail/restaurant tenants and below grade and above grade parking.

LEED Platinum anticipated.

Square 54 - Washington DC

. 500,000 SF, commercial office.

Waterview - Corporate Executive Board - Arlington, VA

. 625,000 SF, 21 story corporate headquarters interior project including

office space, conference rooms, tiered classrooms, cafeteria, client

dining, data/IT facilities with standby power, UPS and supplemental

chiller systems, and fitness center.

4100 North Fairfax Drive - Arlington, VA

. 260,000 SF, 13 stories of commercial office space and retail shops. 965

ton chilled water central plant, floor VAV air handling units,

constant volume fan powered boxes, 7000 amp, 480 volt electrical

distribution system.

One & Two Freedom Square - Reston, VA

. 900,000 SF, 18 stories, 700,000 SF garage.

U.S. Customs Service - Springfield, VA

. 200,000 SF

One & Two Reston Overlook - Reston, VA

. 450,000 SF

Residential/Mixed Use

City Center DC Parcel 3 & 4 - Washington, DC

. 560,000 SF 11 stories, residential apartment building with provisions

for retail/restaurant tenants and 4 story underground parking garage.

LEED Certification anticipated.

Waterview - Corporate Executive Board - Arlington, VA

. 30 story, 136 unit condo, 154 room hotel, 350,000 square feet high-rise

mixed use project.

Tenant Improvement Projects

Corporate Executive Board - Arlington, VA

. 625,000 SF, 21 story corporate headquarters interior project including

office space, conference rooms, tiered classrooms, cafeteria, client

dining, data/IT facilities with standby power, UPS and supplemental

chiller systems, and fitness center.

Dulles Discovery 1 - Dulles, VA

. 375,000 SF government office building including cafeteria, computer

facility, fitness center, and conferencing.

General Dynamics Corporate Headquarters - Falls Church, VA

. 154,000 SF facilities including conference and dining center.

General Dynamics Hanger - Sterling, VA

. 2,000 SF facilities including conference office.

Promontory Financial Group - Washington DC

. 42,000 SF

Virginia Tech Research Institute - Washington DC

. 95,000 SF

Promontory Financial Group - Washington DC

. 42,000 SF

Cisco Systems - Washington, DC

. 1,000,000 SF

One Franklin Square - Washington, DC

. Various tenants totaling 670,000 SF.

KPMG at Tysons II - McLean, VA

. 220,000 SF

One & Two Democracy Center - Bethesda, MD

. Various tenants totaling 200,000 SF.

CURRENT/PAST PROJECTS; AFGHANISTAN

CLASS VIII MEDICAL STRAGE FACILITY - Kabul, Afghanistan (Medical

Distribution Center)

. Wall mounted electrical forced air unit heaters, baseboard heaters,

construction completed in 2006.

WAREHOUSE 11 HAZARD MATERIALS - Kabul, Afghanistan

. Class II, IV, VII Logistic Supply Depot, split system air conditioning

units, suspended electric forced air cabinet unit heaters,

construction completed in 2008.

ANCOP PROJECT (Police Training Compound) - Nengarhar, Afghanistan

. Evaporative cooled central air handling units with gas fired heat

. Compound included barracks, cafeteria, prison, guard rooms, and

restroom facilities

. Construction Completed, 2008



Contact this candidate