Resume:

CURRICULUM VITAE

**,******** **** ******,

Grahalaya D Block,B flat,Gandhi Nagar,

Saligramam,Chennai.600014.

E-Mail ************@*****.**.**

Mobile: 996-***-****, 944**-*****.

RAJA GOPAL E.

Profession : Executive Engineer

(Municipal Engineer, Grade I (Retired))

Nationality : Indian

Area of Specialization :

•Construction of Multi storied RCC framed structures, Roads, Bridges, and Culverts.

•Investigation works and execution of water supply and drainage projects.

•Drilling of Deep bore wells in hard rock and sedimentary areas.

•Solid waste management,power generation technology

Proposed position on team : Chief Engineer /Project Engineer / Team leader

Key Qualifications : A Bachelor's degree in Civil Engineering. Post Diploma in

Town and Country Planning

Over 36 years of Professional Experience as CIVIL Engineering official.

19 Years of experience in Pattukottai, Ambattur, Golden rock, Tambaram, Athur, Panrutti,

Kathivakkam, Trichy, Tiruvarur. Worked as Municipal Engineer in Chidambaram, Karur and

Tuticorin Municipalities.in Tamilnadu.

All investigations made prepared all types of estimates for municipal school buildings,bus

stands,restaurants,commercial buildings,parks,swimming pools,Water Supply head works to

distribution systems including GIS investigation,selection of head works,connected buildings,erection of motors,laying works of power cable,construction of Generator room,laying from

pumping mains to RCC over head reservoirs,laying distribution pipes after verification of

corroded old pipe lines,including municipal town areas distribution of water supply to the

public.Having experience sin construction of electric Cremetoriums and storm water

channels,drains constructions. I am having knowledge and experience working with Microsoft

Word and Excel,Outlook,Access,Project, Powerpoint..Knowledge of rules,regulations,and testing

methods governing drinking water and the treatment and discharge of waste water without

odour..In all the projects monitered contractor's safety program Day to day construction progress

of works will be discussed along with junior level staffs and enlight en them for proper execution

without delay and achived major works in time schedule.Weekly meeting will be conducted along

with all junior level staffs and if any bottlenecks found the samne will be explained with Higer

officials,as per final decision within 2 weeks the same will be rectified before the end of every

month municipal meeting.Having best management practices and skills All municipal road works,

Bridges,Culverts, and separate pathways,Parking lots,Small road side parks,providing Fire

Hydrants, including in local,district roads,State highways,including National Highways coming

within the Municipal limits have been completed as per schedule,etc in a phased manner.For

every monthly District level Road Development including Traffic and Transporation and Water

Supply meetings conducted by the District Collector, attended promptly and explained about the

progress shown by me.During flood seasons and storm water overflow periods actions were

taken in a war footing manner and achived the goal in the respective Municipalities.At the same

time actions have taken to receive the grants for Drought Relief works and for Flood damages

from the Government and completed all the restoration of all roads,culverts works within the

stipulated time.In addition the entire area Street Lights maintained and for newly extended areas

as per Government norms new light fittings by extending street wiring works by the

electricans,foreman also supervised.Tree planting (seedlings)works every year within the

municipal limits,Parks,target achived.Burial grounds,Shandy sites,Bathing tanks also regularly

maitained in the interest of public of the town. Bar diagram showing the progress of works

prepared and shown with oral explanation to the Municipal Council meeting every

month.Preparation of progress reports for all works done then and there,weekly

bimonthly,monthly meetings conducted by collectors attened with photos showing the progress

with written reports..If any deviations from plans,specifications and standards reported to Distrct

Collector and to Department heads, symeltaneously.Having ripe experiences in zoning activities

when preparing Development and Master plans preparation as per Town and Country Planning

norms for future development of town,city roads developments with respect to traffic and

transportaion.In the Municipal Parks I extracted works to plants as per landscape architecture by

allocation and demarcation of each variety of flowering shrubs,crotton plants,small flowering

trees,children,youths play lots with playing instruments and for play field with walkway for Senior

Citizens.also.

17 Years of experience in TWAD Board,(Tamilnadu Water Supply And Drainage Board)

Urban Execution, HAPP(Heavy Alloy Penetrator Project), RWS,(Rural Water Supply) Project

Formulation divisions and in Trichy District Level Technical Cell, Collectorate Trichy.( under the

District Collector Direct Control)

Main Water Supply works execution involving GIS investigations,preparation of major project

reports along with all estimates,obtaining Technical Sanction from respective Department

heads,Government and then preparation of tender schedules as per World Bank

Norms,approval,tenders called for,final conclusions for work order through respective higher

officials concerned and works executed as per time schedule and achived goal to supply potable

water to the Municipalites and Rural Areas. Having sound experiences in all types of buildings,

traffic and transpotations by road development works,water supply works, waste water treatment

works execution,inspection with an emphasis on standards,specifications,codes and

regulations.For the Waste water (drainage) treatment,investigations of sewege,testing,estimates

prepared for Under Ground Drainage project including treatment plant.On obtaining technical

sanction,calling tenders,issuing work orders by the respective Heads of Department and by

Government, the works completed in time alloted to me.Able to organise work on computer

proficiency in Primavera. For Drought Relief and Flood damages due to storm water overflow

causing dammages,then and there estimated,inform to the higer authorities District

Collector,Chief Engineer,TWAD Board,and to the Government.For Drought Relief and Flood

relief works regular and urgent meetings conducted by Government,Managing Director,TWAD

Board,and Disrict Collectors concerned, atteneded and explained about progress and completed

all the works in time. Able to work and communicate well with others to the site conforms with

plans,specifications and standards.Experienced with materials,methods,practices,and

equipments used in the operation of modern water and waste water treatment systems.Having

practical knowledge in HVAC works,interior decoraion of works with modern design and finishing

works in Travellors Bungalows attached with Twad Board and offices.Having thorough knowledge

of Duct Air conditioning works,errection of 125 to 500 KVA Generator sets, Tranformers upto

1000 KVA installation works and other connected works as per IE Rules.All the power cables

instalation works from transformer yard to Main panel board as per Ie rules works extracted and

got the power supply and commisioned the water supply schemes.

One Year experience in Commissioner of Municipal Administration, Chennai as AEE / PA

to Superintending Engineer, assisted by scrutnising and modifying as per norms with respect to

QA and QC in Technical sanction of all estimates for all projects, major tender documents for

water supply and sewerage schemes Including Waste Water Treatment as per design aspects

relating to major Bus stands, Marriage /Community halls, Recreation centres and other Multi

storied commercial complex buildings on remunarative enterprise to augment the revenues to

Local Bodies ie for Municipalies, Town Panchayats including Restaurants,.formation of Parks and

play grounds for municipal schools,swiming pools and crematoriums.

Education :

• B.E (Civil Engineering)

(08/1978 to 12/1981, First Class, R.E.C Trichy)

• Post Diploma in Town & Country Planning

(1970, Central Polytechnic, Adyar)

• Diploma in Civil Engineering

(10/1964, Valivalam Desikar Polytechnic, Nagapattinam)

Service Record :

S. No. Designation Organization Period of Service

1 Municipal Engineer (Grade I) Tuticorin Municipality 07/2002 to 12/2002

2 Asst. Executive Engineer CMA Office Chennai 07/2001 to 07/2002

3 Municipal Engineer Karur Municipality 03/2000 to 07/2001

4 Municipal Engineer Chidambaram 03/1999 to 03/2000

Municipality

5 Assistant Engineer Tiruvarur Municipality 09/1998 to 03/1999

6 Assistant Engineer Trichy Collectorate 09/1993 to 09/1998

7 Assistant Engineer Tiruvarur TWAD Board 06/1993 to 09/1993

8 Assistant Engineer Thanjavur TWAD Board 08/1992 to 05/1993

(Urban)

9 Assistant Engineer Trichy PF 05/1991 to 07/1992

10 Assistant Engineer Trichy RWS 05/1989 to 05/1991

11 Assistant Engineer Trichy (Urban) 03/1988 to 05/1989

12 Assistant Engineer Trichy H.A.P.P 02/1986 to 02/1988

13 Assistant Engineer Trichy P.F 11/1985 to 02/1986

14 Assistant Engineer Thuraiyur P.F 05/1985 to 11/1985

15 Assistant Engineer Trichy P.F 06/1984 to 05/1985

16 Assistant Engineer Trichy (Urban Dn I) 02/1982 to 06/1984

17 Junior Engineer Trichy (Urban Dn I) 08/1981 to 02/1982

18 Junior Engineer Trichy Municipality 05/1978 to 08/1981

19 Junior Engineer Athur Municipality 01/1978 to 05/1978

20 Supervisor Kathivakkam 07/1975 to 01/1978

Municipality

21 Supervisor Panrutti Municipality 02/1975 to 07/1975

22 Supervisor Tambaram Municipality 06/1974 to 12/1974

23 Supervisor Golden rock Municipality 10/1973 to 06/1974

24 Supervisor Ambattur Municipality 05/1973 to 10/1973

25 Supervisor designated as Junior Pattukottai Municipality 10/1965 to 05/1973

Engineer

Professional Experience in Municipalities

For all Original & Maintenance works relating to roads, storm water drains, revetments,

retaining walls, culverts, bridges, schools and other commercial buildings Estimates, Plans

etc.prepared.Schedules for Tenders prepared,involved in calling for tenders for all the works.

Execution of all works by monitoring all sections labourors with keen coordination and arranged

for early completion as per schedule.

Special road works including cement concrete pavements for 1999-2000 and 2000-2001

have been executed in Chidambaram and Karur Municipalities and completed as per World Bank

norms.in time.PERT and CPM charts prepared then and there for every major projects and

produced during weekly,monthly review meetings.

I engaged in water supply, drainage, waste water treatment works including house service

connections in all the Municipalities.

Supervision of Head water works in the municipalities and major improvements in rejuvenation

works, studying corroded pipes portion, replacement where ever necessary to augment the

sources for water supply.For implementing Under Ground Drainage Schemes,all the preliminary

steps taken by me,Outline estimates prepared and got approved for taking up the project

proposals sent to Government for approval.Compost yard maintainence woprks,burial ground,wells for water supply tree planting done to aviod odour and to aviod environmental pollution due

to burning of dead bodies.

Storm water works undertaken in the Slum ares under my supervision. Street lights

works Parks also under my supervision.All the motor vehicles used for Public health section for

collection of rubbish,debris,sullage water collection lorries Engineering section materials and

water supply lorries, vanes,jeeps,cars used for various purposes also maintained under the

supervision for their day to day maintainence.

Executed improvements to Pumping main and distribution mains

Executed Drought and Flood relief works in the Municipalities as per construction schedule and

capable of determining potential delays to the projects.

Communicated any deviations from plans, specifications and standards to the Higer authorities

and got approval then and there.

TWAD Board

Urban Division – Trichy and Thanjavur

•In charge of Trichy Water supply improvement schemes – Trial run of 750mm Dia pumping

main, Head works improvements, Service reservoir constructions, laying of Distribution

mains.CPM and PERT charts prepared for every project,produced during works progress review

meetings by head of Departments as well as by the District Collector's works progress and

review meetings.

•Executed balance works for Lalapet W.S.S., Karur W.S.S, and Thanjavur W.S. Improvement

Schemes, the suction pipes,sluice vales,reflex valves have been changed and delivery lines

within Head work site and also.Transformer yard,new Generator set have been erected,power

cable works executed by me and improvement to Thanjavur Water Supply Scheme has been

effected and commissioned under my control..

• In Trichy Drainage Scheme I was engaged and executed all types of investigation of the omitted

gravity, pumping main, house service connections, manholes and left over. portions in the roads

for all the Pumping Station’s areas. During 8/81 to 6/84 and 3/88 to 5/89.

All the same have been rectified then and there by providing new man holes, gaps in HSC lines,

gravity mains and pumping mains have been executed by me after formalities with the approval

of the higher officials.The suction well,Grit wells were constructed,and the bottlenecks are

removed and Transformer yard works,power cable laying and erection of flow more pumps with

motors in Pumphouse in Thillainagar No4 block arranged for commissioning. in all other pumping

stations pending construction and completion of last man hole, suction well,collection of grit

chambers,Pump house in Block no 6 and interconnecting works completed under my

supervision. All the 6 Drainage Pumping stations were operated under my supervision all

sewerage water pumped to Main pumping station. Daily electricians,pump

operators,watchmen,grit removal persons will be informed through my junior officers for effecting

sewege disposal without stagnation at pumping stations during trial run period. Weekly meetings

attended by me along with officials at Superintending Engineer's office.Trichy and in some

monthly meetings at District Collector's office in connection with Trichy Drainage Scheme.

The flow tests were conducted in all the 6 pumping stations zones and up to Main

Pumping Station and pumping the entire collected sewege water towards head works situated at

Panchapur. All the gap works have been rectified then and there and made the scheme to fulfill

for good run, by me.

Near Trichy Collector’s Office, a Residential Colony called Raja Colony which was

completed omitted in Trichy Underground Drainage Scheme. The then District Collector and then

Superintending Engineer have instructed me to take up the challenging job in a meeting

conducted with the Local Administration Minister.

Accordingly the entire Raja Colony Residential area had been investigated by me by

taking levels, trial pits, L.S and C.S plans prepared, hydraulic designs prepared,3 types of

estimates have been prepared, by me.

Among the estimates prepared by me cost effective had been got approved and tenders have

been called for. The entire works from start to finish such as earthwork, gravity main laying

construction of manholes, flush tanks, ventilating shafts, HSCS, Collection well,Screen well

Pumping well and pumping main up to the main road Pumping Main, that leads to Block 5 Beema

Nagar Pumping station, had been executed by me.

Project formulation Division (Trichy)

•Attended investigation works, Leveling works, trial pits, preparation of LS & CS Plans and all

other relative plans and estimates prepared for Thuraiyur CWSS, Trichy W.S.S Improvements,

Pudukottai W.S.S and Karur W.S.S

The entire Cauvery River in Trichy up to 10 Kilometers from Kambarasampettai( ie

Trichy Municipal Corporation Water supply Head Works site) on either sides ie upstream

and downstream complete GIS and other surveys, trial bores having conducted under my

direct control and supervision for studying the sub soil strata,water table etc and finished

the survey in 2 months with team members in a recorded time, furnished the reports along

with plans, survey details and clarifications made with the Executive Engineer and as per

his guidance only all the survey details,plans, estimates prepared by our team for getting

approval for Combined Water Supply Schemes by the Government.The investigation of

River Cauvery basin survey taken for preparing CWSS for so many villages have been

discussed along with Engineering heads,Managing Director and with the joined meetings

held with the Government Secretaries for Municipalities,Rural Development,Finance and

with Chief Secretary. The meetings also attended with my team members along with

outline proposal estimates at Chennai. In the meeting itself the Secretaries have satisfied

with our reply when clarifying all matters about CWSS.

On the finalized survey records only so many Combined water supply schemes have been

evaluated( Ex) to Sivaganga municipality--CWSS to Ramanathapuram and way side

villages, estimates have been approved by Government, had the above schemes are

under use to the public.

R.W.S Division (Trichy and Tiruvarur) --- Rural Water Supply

•Investigation works for RWS schemes for the Panchayats in Thuraiyur and Uppliapuram unions

and in habitation of Patchamalai (Hills area) . Water supply works including construction of RCC

over head reserviors,erection of bore wells,laying of pumping mains to the wayside villages upto

branch reservoirs,and in the Town areas and from Service reservoirs distribution pipelines laid as

per my instructions during supervising the works In Hilly areas in some places pipelines laid and

in some acute places with special Rigs,bore wells erected through contractors and hand pumps

fitted for effecting water supply to the poor peoples in the habitations.

H.A.P.P Division (Trichy) Heavy Alloy Penetration Project

•It is a Defence Project. Executed with great involvement for Pilot Water supply and executed

bore wells in Forest area, Headwork’s and effected water supply through pumping main to the

Heavy Alloy Penetration project at Thiruvarambur. Responsible for Quality assurance and Quality

control for CI pipes supplied for work performed by others and for training and mentoring of junior

level staffs in the project.The entire works have been completed with TEAM spirit and completed

in a recorded time and water supply effected to the Project site.

District Level Technical Cell (Trichy)

DLTC was completely under the direct control of District Collectors in the respective districts.

Executed nearly 800 deep bore wells both in Hard rock and Sedimentary area in Trichy

Composite district through Trichy Collectorate Trichy. (Trichy, Karur, and Thiruvalluvar districts)All

the estimates prepared by me, got sanctioned, drilling Points selection decided after survey with

Geological Assistant and by me as per the selected locations in the habitations attached with the

villages in 3 districts, estimates prepared by me, got technical sanction, schedule for tenders got

approved,tenders called by Government .After finalisation of tenders, work order had been

issued by Head of Governments Heads. All the deep bore wells have been supervised by me

while drilling, errection of deep hand pumps and water supply effected in the habitations in 3

districts. Speeding up by engaging additional drilling plants RIGS explained to the contractor, and

engaged additional 3 more rigs to speed up the works. Every week, the District Collector

reviewed the progress of works. After seeing every month progress the District Collector

appreciated and give further instructions for early completion as per schedule.

Special Training

Short term course in Public Health Engineering – Anna University--Guindy, Chennai

•Integrated low cost sanitation training course – Tamilnadu Institute of Urban studies, Coimbatore

•Materials Management –Training Programme-- Anna Institute of Management---Chennai

•World Bank Procurement guidelines and Procedures –Training Programme--- Hyderabad

•Computer Appreciation program in Windows, MS-Office and Internet --Chennai

•Certificate for SJSRY sponsored by UNICEF, conducted by Institute of State Centre for

Training and Research in Municipal Administraion-Coimbatore.

•Orientation workshop for Municipal Engineers sponsored by Project Management Unit

Tamilnadu Urban Development Project--organized by Metro water---Chennai

From 2003 to 2007

After retirement I am fully engaged in consultation works relating to urban and rural infrastructure

projects in some of the Municipalities and Town panchayats.

After studying the bottle necks in such local bodies, many suggestions given by me and they

have been rectified in water supply and underground drainage works.

Preparing papers for presenting to US, Japan China, Germany, India in connection with

Global changes,Solar energy, Water Supply,Waste Water Management and Solid Waste

Management Techniques for economy friendly in manufacturing of Power from the

wastages and balance safe disposal. Sea water pollution-raising level, and heating,

Ecology balance in the role of Environmental Activities. Recirculation of wastes, Fuel

shortages, Potable Water scarcity before 2020, War threatening among all countries,

Nuclear,Atomic projects draw backs. Air born contaminations which causes sudden death

to humans as well as other living creatures. Neutrino Observatory Project --near Theni

Collecting particulars from Chicago, Illinois, Canada and in Japan about the Neutrno

detector.BNR under study -how to add to Water and Waste Water Treatments plants.

From 2005 to 2008

I have worked in housing projects and petrol bank construction, consultation given for RCC

Chimneys. I was working as DGM-Projects in an Engineering Enterprises from 05-05-08 to 26-05-

08 in charge of all Water Supply Projects works in Tamilnadu and Andhra Pradesh states.

I was working as Chief Engineer in Saveetha University from 06-06-08 to till 06-11-2008, at

Chennai.

Engaged in preparation of important estimates for Interior Decoration works, Duck air contioning

works to Dentel Laboratories,HVAC (chillers) works,all civil works including Radiation Therapy

building as per the Consultant have been supervised and bills verification and completion

certificate given for all payments. The complete maintenances works for both Boys and Girls

Hostel attached with the college. The modernisation works to Hostel Kitchen was undertaken. For

Traffic and transportation of college buses, other staff cars, parking facilities, road formation

works were undertaken. Water supply and waste water treatment plants proposals given. For

make use of Solar energy in the college,hostel roofs proposals sent for approval. Very good lawn

formed in the college campus, and near Auditorium. The sound effects and other lighting works

remodification works done with great attraction to Auditorium .The electrical cabling works

renewed. For Fire fighting equipments, providing new fire Hydrants proposals have been

furnished by me. Every week along with college Professors the requirement meetings, then

discussion with Managing Director for finalisation of all works. then and there.

From 2009 to 2010

From 10-05- 10 to 30-11-10, I have been worked as Vice President (Municipal Projects) in Private

Enviro care systems. in Chennai. I was looking after the following 3 Municipalities ( Under Ground

Drainage Scheme) Sewerage Treatment Plants.

Kumbakonam Municipality --17 Mld Project--Balance works completed expect roof for Digester

well. One complete unit already in working condition. After completion of Digester well pipe

connections work, power cabling works pending for 2nd unit working. All the materials are

arranged for supply for rejection at site.

Thiruvarur Municipality 6 Mld complete work of Treatment plant has been stated. All the

units of collection chambers, screen chambers (both for manual and machine)

Primary Clarifier, Aeration Tank, Secondary Clarifier, Digester well.cholrination room, Electrical

room, Sludge collection and filter press arrangements ground level markings marked by the

Project Manager, with other engineers. The same was verified and all the arrangements for

starting the works and instructed the sub contractor to speed up the work. During the first unit

RCC works and for the Administration room (Framed Structure) up to ground level had been

completed. Due to heavy rains all the works stopped.

Thiruvallore Municipality 6 Mld The entire site has been marked and shown to Managing

Director TWAD Board. Since the site alloted for is belongs to PWD, untill otherwise the civil works

could not be executed.

In this situation I have resigned, since there won't be any work till January 2011 due to rain.

Languages Known : English, Tamil, Telugu, and Hindi --Read and write

Passport : possessing a valid passport.

Driving Licence : International driving permit

Personal Status : Age 67,with good health

Declaration:

I hereby declare that the information furnished above is true to the best of my knowledge.

E. Raja Gopal



Contact this candidate