Experience: Over **-years of experience in design and specification of
electrical power distribution, lighting, and control for: 50, 60 and 400-
Hz, low and medium voltage systems. Designs complied with State of
California Title 24; Building, Electrical, Energy, Fire Alarm Codes and
Military Specifications and Standards where applicable. BSEE, EIT Status
with State of California accepted and qualified to sit for PE Exam.
Recent Accomplishments:
. Completed an MEP utility upgrade on a 100+ year old 300+ classroom,
LAUSD School; including rerouting and replacing campus wide signal,
data and communications systems cabling.
. Completed design project at Kaiser Mental Health Center Los Angeles,
CA for Emergency and Standby Power System upgrade to support an HVAC
upgrade and improve reliability.
. Completed project at Dolby Sound Labs for Emergency and Standby Power
System including Engine-Generator, Automatic Transfer Switching and
UPS for Critical Data Center power bus.
Budlong & Associates Inc., Camarillo, CA May
2005 to Present
Senior Electrical Designer
. Attend meetings with architects, clients, project managers, owners,
and stakeholders, engineers from other disciplines, contractors, and
sub-contractors from conception to completion of projects.
. Prepare electrical construction documents including AutoCAD drawings
and CSI MasterFormat specifications for various divisions including:
power, lighting, low-voltage and various power-limited circuits (fire
alarm systems, security systems, data networks, telephone (systems and
VoIP), public address/intercom, CCTV).
. Design Fiber Optic installation for data networks including single
mode and multimode FO cables.
. Designed electronic sub-metering installations with interface to
campus-wide Building Management Systems-BMS and/or Energy Management
Systems-EMS.
. Develop single-line diagrams, wiring diagrams, panel schedules,
transformer schedules, light fixture schedules, feeder schedules and
details.
. Prepare California Title 24 forms for Non-Residential Building
Lighting.
. Prepared Critical Care Facility Parallel Power and Standby Power
Systems
. Prepared Emergency Lighting Plan for Commercial Sport Park and High
School Stadium Exterior Egress Lighting. Applied Eaton UPS Powerware
System.
. Develop NFPA and California State Fire Code compliant, fire alarm
designs with riser diagrams, battery calculations, voltage drop
calculations, floor plan device placement, installation details,
equipment list with California State Fire Marshall (CSFM) approval
listings and required cut-sheets.
. Perform design reviews, value engineering reviews, material
submittals, shop drawings, plan checks, peer reviews, and
constructability reviews.
. Assist design team in construction cost estimating from SD thru 100%
CD design.
. Prepare electrical calculations including; voltage drop, fault current
and load calculations.
. Prepare and/or review selective device coordination and/or load-flow
studies associated with switchgear submittals.
. Review test report for fiber optic cable, ground resistivity,
conductor insulation-resistance and other specified or required tests
to assure they were performed in accordance with construction
documents and met specifications.
. Prepare technical engineering reports including; site survey report,
value engineering report, existing system condition report, project
feasibility and recommendation studies/reports, forensic
studies/component or system failure report, conductor failure report,
and equipment commissioning reports, based on field investigations and
provide facility data.
. Conduct field engineering site surveys and commissioning of electrical
systems. Meet with utility company service planner and prepare
associated submittal package for new service request.
. Attend construction progress meetings. Address Requests for
Information (RFI), Requests for Clarification (RFC), Change Orders
(CO), prepare punch. Provide Architect with a cost estimate analysis
for CO.
. Provide field construction administration or construction management
when and where required.
. Submit plans and specifications to AHJ (city, county or state-DSA and
OSHPD) attend back-checks and resolve issues.
. Provide direction to Junior Engineers and CAD support on various
projects to meet schedules.
. Mentor junior electrical designers in Code and creation of
construction documents.
Technifex Inc, Valencia, CA (Contract Engineering Service Employee PTS)
2004-2005
Electrical Design Engineer/Conformance Engineer
. Prepared power and lighting control system design to meet State of
Louisiana Electrical Code.
. Prepared isometric conduit and outlet installation detail for
multimedia tower.
. Provided electrical power single-line, signal single-line, for
remotely controlled, Schneider Powerlink G3 lighting control systems
diagrams, and detailed lighting plans. Control Network was DMX-512 for
entertainment industry application. Specify DMX controllers and
dimmers for tower top stage lighting.
. Developed conformance Technical Data Packages-TDPs, consisting of cut
sheets, specifications and other technical data. Coordinated testing
and evaluation by third-party certifying agencies to meet UL, CSA and
CE Mark labeling and certification of same.
. Modified existing control panel designs to comply with CE mark for
shipment to Europe.
Wet Design, Universal City, CA (Architect & Engineering Firm and
Manufacturer) 2001-2004
Electrical Engineer/Control Systems Designer Wet Design is spectacular
water feature company
. Prepared 50 and 60-Hz electrical power and lighting control designs
for various U.S. and International project sites, to support the
installation of water feature pumps (5-75-Hp), air compressors,
underwater lights power and control systems. Prepared PLC, discrete
and analog, I/O control designs from P&ID and project description
provided by others. Prepared show controller power and control systems
interface design in accordance with specifications. Show controller
programmed by others.
. 20 plus SCADA projects using Modbus Plus network protocol and
Schneider Electric's Modicon Premium or Modicon Quantum PLC, PAC and
Distributed I/O and Magelis HMIs. Did not perform programming
functions. MCCs used Schneider ALTIVAR 61 AC Drives 1-100 Hp
applications.
. Revised Industrial Control Panels for European delivery to meet CE
Mark European Directives and conducted TUV certification process with
TUV Rheinland of North America.
. Designed UL 508 Industrial Control Panels and UL 845 Motor Control
Centers.
Manufacturing Technology Inc. Ventura, CA
1999-2001
Electrical Power & Control Systems Designer/CE Mark Conformity Engineer
. Developed 50 and 60-Hz facility electrical power distribution upgrades
to support the installation of precision machine tools at U.S. and
International project sites. These included the addition of isolation
transformers, automatic transfer switch systems, emergency generators
and UPS systems. The ATS system was a PLC SCADA that monitored and
recorded: Utility and Generator; Voltage, Frequency, Load Amperes and
Transient events. Designed Machine Safety circuits and installation
designs.
. Prepared all electrical load calculations and delivered to project
file.
. Developed Conformity Technical Packages and coordinated testing and
evaluation by third-party certifying agencies to meet UL, CSA and CE
Mark labeling and certification of same.
. Modified Data Acquisition and Control System for improved reliability
and serviceability for nickel-diamond precision blade manufacturing
system.
. Prepared Bills of Material and Requests for Procurement entered into
the Material Requirements Planning (MRP) and accounting software
application.
. Provided shop floor technical support and component failure analysis.
BAE Systems Inc. Oxnard, CA (Design Build Division supporting NAVFAC)
1983-1999
Electrical Designer/Field Engineer
. Prepared Construction Documents (Installation Design Guidance) for
over 50 projects located at land based training facilities for NAVFAC-
West Division and East Division. Prepared NAVFAC Guide Specifications
(Government version of CSI-MasterFormat Specifications)
. Attended project meetings with U.S. Military clients, NAVFAC
engineers, and facilities Public Works personnel to develop details
and project requirements.
. Performed field investigative surveys to document existing facility
configuration and developed an associated report including Basis of
Design and project Schematic Design.
. Prepared 60-Hz and 400-Hz power single-line diagrams, lighting plans,
power distribution plans, equipment layouts, signal and power cable
assembly drawings and termination details.
. Prepared equipment installation details including Unistrut racks,
stands and brackets.
. Designed HVAC/Plant and room control modifications, Coolant Systems
for equipment cooling, Dry-air systems for waveguide, water
purification systems for deionized water filtration and monitoring.
. Prepared waveguide isometric installation details routing and bend
details for various size tubing.
. Prepared all electrical calculations in tabular format for submittal
with design packages.
. Developed Uninterruptible Power Supply System Installation Design for
Command, Control, Communications, Computer, Intelligence, Surveillance
and Reconnaissance Mobile Expeditionary Forces United States Marine
Corps. These are Mission Critical Data Power Systems using multiple
sources, Parallel Distribution, Standby or Emergency Power Generators
and UPS/Battery back-up systems.
. Developed installation plans including basic structural building
requirement plan for the relocation/installation of motor-generators
60/400-Hz up to 1.5MW, and pumps up to 150-Hp.
EDUCATION:
B.S.E.E. Suffield University, Twin Falls, ID
(Lower Div. Foothill College & Ventura College; Upper Div. West Coast
University Los Angeles, CA)
Professional Publications Inc PPI Electrical Professional Engineer Exam
course completed.
State of California Business and Professions Section of the PE Exam -
Passed
Qualified and attempted PE Engineering & Surveying exam with plans to
retake October 2011
Sate of California Electrical Contractor's License #486622 presently held
in an 'Inactive' status.
PROFESSIONAL SKILLS:
. Excellent Communications & Personal Time Management skills
. Excellent Technical Writing skills (reports, analysis and
recommendations)
. AutoCAD 2007- Proficient (15 years)
. Microsoft Office Professional Suite: Outlook, Word, Excel-Proficient
(15 years)
. Microsoft Project 2007- Delivered Electrical Design Schedule to an
existing Project Folder.[pic][pic][pic][pic][pic][pic][pic][pic][pic]