Peter A. Pappas

*** ******** *****

Hackensack, N.J. 07601

201-***-****

Objective: Position as a Control Systems Engineer, or as a part-time

Contractor working on automation technology for process and

packing controls.

Experience:

Unilever Personal Care North America 800 Sylvan Ave. Englewood Cliffs,

N.J. 07632

Automation Technology Innovation Manager October 1994 until March 2011

(retired)

Corporate responsibility for the evaluation and recommendation of new

emerging control systems and computer technologies related to manufacturing

of consumer products. Directly responsible for the strategic planning

required to ensure the full utilization of manufacturing equipment,

minimize production down time, and developing operator-training programs

for a flexible manufacturing environment.

Knowledgeable Relevant Technology

. Emerson Process Automation System Delta V

. Allen Bradley PLC Control Logix Platform including RSLogix 5/500/5000

. Allen Bradley Operator Interface Application, RSView, FTView ME/SE

. Allen Bradley family of VFD drives including configuration and

application

. Control System Networks, Profibus DP, ASi, DeviceNet, Ethernet CIP,

Wireless Ethernet

. Fisher Provox Legacy Distributed Control Systems including PROFLEX and

ENVOX configuration. Experienced in using SYBASE SQL for the Fisher

relational database.

. Rosemount and Endress & Hauser instrumentation application, specification

and configuration.

. Control Panel Design, Layout, Wiring. P&ID Design Standards.

. NEC, NFPA and GMP's Standards. Hazard Application and Operational

Management.

. Microsoft Office Applications, Visio, AutoCAD

Unilever HPC USA 818 Sylvan Ave. Englewood Cliffs, N.J. 07632

Control Systems Engineering Manager April 1989 to April 1994

Directly responsible for the supervision, direction and staffing of Lever

Brother's Corporate Control Systems Engineering Group. The position focused

on recommending to Senior Management control system requirements including

cost, schedule and project resource management. Ultimately responsible for

the selection, installation and implementation of all manufacturing and

packaging machinery control applications. Lever Brother's Company control

system manager during the installation of major projects including:

< $80MM powders process and packaging plant

< $15MM packing line project including 7 high speed powder detergent

packing lines utilizing line monitoring and reporting

< $40MM new bar soap LEVER 2000 process and 4 high speed soap packing lines

< $25MM automation upgrade of an existing bar soap factory.

Conducted and participated in several Hazardous Occupational Studies

related to new and existing manufacturing processes.

Senior Instrumentation and Control Systems Engineer October 1980 to

April 1989

Responsible for microprocessor based control system applications. Software

expertise in both batch and continuous processes including the custom

design of dynamic operator interface graphics. Hardware responsibility for

specifying and selecting digital, analog and weigh scale instruments

interfacing to control system I/O's.

Senior control system engineer for a Greenfield $60MM soap plant.

Responsible for specifying, selecting, installing and developing the

configuration software for a 1.5 million dollar Fisher Provox distributed

control system. Database included 1500 I/O points, 40 batch programs and

200 custom designed graphics. Also designed, installed, implemented and

started up a number of packing lines and small batch processes using a PLC

based system. Other project related experience includes developing the

process and packing line interface software for Lever Brother's CIM

business computers.

W & H Conveyor Systems, INC. Carlstadt, N.J. 07072

Electrical Engineer November 1978 to October 1980

Responsible for the electrical design of power distribution systems and low

voltage control circuits. Experience included the design of PLC ladder

logic, control panels and instrument specifications. Also supervised

drafting and electrical field installation, and system startup.

United States Steel Corporation Pittsburgh, PA. 15230

Electrical Engineer July 1976 to November 1978

Responsible for project estimates, installation specifications and drafting

supervision. Position included project coordination with multi-disciplines

during design and construction. Systems design included grounding, embedded

conduit, cable tray, lighting, 13.8 KV overhead power distribution, 480 and

2400 volt substations and motor control centers.

Education: Fairleigh Dickenson University Teaneck N.J

B.S. Electrical Engineering with a Computer Minor 1976

Magna cum Laude

References: Available upon request