CURRICULUM VITAE

Position Applied For : Lead/Principal Structural Engineer /Sr.

Construction Engineer

Name : ELISEO C. GUTIERREZ

Date of Birth : June 14, 1961

E-mail Address : *********@*****.***

Contact No. : Mobile +61-410-***-***

EDUCATION and QUALIFICATION

Bachelor of Science in Civil Engineering 1983, University of the East-Manila, Philippines,

Registered Civil Engineer License 34577 Professional Regulation Commission Manila Philippines

SYNOPSIS OF PROFESSIONAL EXPERIENCE

Over twenty years (20) work experience in design and construction of various oil and gas offshore

platforms in which 17-years were dedicated in engineering and construction of jackets and topside.

The majority of my works involves mainly in FEED/conceptual design, detailed engineering,

fabrication and installation engineering of jackets and topside including, living quarters, flares and

bridges. Had hands-on experience in structural configuration of jacket and topside; structural

analyses such as In-place, fatigue, earthquake, lift, ship impact, post damage and various detailed

design calculations e.g. pile design, cathodic protection, vortex shedding, padeyes design, etc. I

am very familiar with API-RP-2A both in WSD and LRFD (Load Resistance Factor Design) method.

Well versed in industry codes like API, AISC, DNV, BS, ASTM code of practice and standards. I

used SACS (Structural Analysis Computer System) suites of programs for various structural

analyses applications.

I had lead and control of structural engineering delivering successful turnkey projects. I have a

strong background of fabrication and installation engineering of jackets, float-over decks, modular

assemblies, flare towers and bridges. I had carried-out various pre-service analyses like load-out,

transportation and seafastening design, lifting, jacket launch, jacket floatation and upending, on-

bottom stability, and pile driving analysis. I am capable to prepare jacket and deck installations

studies for various barges. Had also hands-on experience in deck mating analysis (float-over deck

installation) and could develop cargo barge layout and sea-fastening drawings. I had witnessed

several jacket and topsides installations where I provided technical support and engineering

assistance on board the vessel.

I had also exposures in Project Management Team (PMT) being the Client, who owns

responsibility of the structural design at the Operators’ perspective. I always ensure that the scope

of works is completed in accordance with the design standards and project specifications. My task

also includes coordination and interfaces with other disciplines in the project team. I had reviewed

and approved design drawings, design reports and calculation notes. Conduct meetings and site

visits.

CV of ECG - page 1 of 7

EMPLOYMENT HISTORY

Period Position Company

07/12- to Sr. Structural

Wood Group Australia – Perth WA

present Engineer

Engineering

10/09-14/10 McDermott Middle East Inc. – Jebel Ali Dubai, UAE

Supervisor

Sr. Structural

09/08-10/09 Energy Resourcing/WorleyParsons - Perth Western Australia

Engineer

Sr. Structural

07/06 -08/08 Maersk Oil Qatar As – Doha, Qatar

Engineer

Sr. Structural Shell Malaysia Exploration and Production – Miri Sarawak

12/04 -06/06

Engineer Malaysia

11/02 -11/04 Lead Engineer Worley Qatar WLL - Doha, Qatar

11/92 -11/02 Lead Engineer National Petroleum Construction Company - Abu Dhabi, UAE

08/91-11/92 Design Checker ABB-Lummus Alireza Ltd. Company – Dammam, Saudi Arabia

08/89-02/91 Project Engineer Nippon Kokan Corporation / NKI Pte. Ltd. – Bombay, India

Atlantic Gulf & Pacific Company of Manila, Inc. (AG&P) -

10/88-08/89 Design Engineer

Makati, Phil.

04/87-07/88 Field Engineer EEI / Braun Transworld Corporation - Shuiaba, Kuwait

AG&P, BMFY- Metals Fabrication Group - Bauan Batangas,

05/84-03/87 Field Engineer

Phil.

CHRONOLOGICAL DESCRIPTION OF PROFESSIONAL EXPERIENCE

07 Dec ’10 – Present : Wood Group Australia

432 Murray St. Perth WA

Position : SR. STRUCTURAL ENGINEER

Work Descriptions :

Carry-out structural analysis of brown field design and modification to existing facilities of assigned

project. Carry-out joint detail calculation as part of existing facilities integrity check analysis and

Provide solutions to rectify problems encountered in the check. Develop and engineered

installations scheme and hook-up activities of new designs to integrate into the existing facilities

offshore.

05 Oct ’09 – 14 Oct ‘10 : MCDERMOTT MIDDLE EAST, INC

Jebel Ali Free Zone, Dubai, UAE

Position : ENGINEERING SUPERVISOR – Installation Engineering, Offshore Operations

Department

Work Descriptions :

Manage and supervise structural designs, verification and preparation of structures ready for

offshore installation. Reporting to Department Manager on the overall activities and planning of the

structural discipline of installation engineering. Maintain department quality standards and ensures

work complies within the Company objectives and procedures.

Specific responsibilities include:

- Utilize the discipline expertise and experience to set priorities. Identify problem areas

and resolve within functional area.

- Provide technical expertise in the design of structural components to be used for all

offshore installation campaign considering safe, workable and cost effective solutions.

CV of ECG - page 2 of 7

- Enhance design standards and quality checking of all deliverables produced.

- Lead and provide guidance of structural design to all subordinates.

Major Project involved:

• Platong Gas II Project for Chevron Thailand Exploration & Production

• Karan Platforms and Power Karan Subsea Pipelines for Saudi Arabian Oil Co.

• Kipper Tuna Turrum KTT Project for Esso Australia Resources Pty. Ltd.

01 Sep ’08 – 25 Sep ‘09 : WORLEYPARSONS

EOS Oil and Gas Joint Venture, Perth WA 6000

Position : SR. STRUCTURAL ENGINEER

Work Descriptions :

Carry-out design and structural analysis of NRB 21K ton topside for in-place and transportation

condition. This includes cellar and main deck steel detailed design such as secondary and tertiary

steels, including pipe racks, equipment beams and pipe supports. Provide design reports and

calculation notes in LRFD method. Participate in squad checking and constructability review of all

drawings prior to issuance.

Project involved: EOS – NR2 North Rankin Re-development Project for Woodside Energy

01 Jul ’06 –25 Aug ‘08 : MAERSK OIL QATAR As

Doha, Qatar

Position : SR. STRUCTURAL ENGINEER

Work Descriptions :

Feb ‘08- Aug ‘08

Work as a team leader for the brown field works at operator’s design office covering all

modifications and upgrading of the existing facilities in preparation for the tie-ins of the new

facilities. Carry-out design checks and coordinate designs of structural framings such as deck

extensions, drop object protection, compressor skid, bridge landing and pipe supports as part of

modifications and upgrading works of the facilities. Develop strengthening solution and trouble

shoot problem encountered during re-analysis of the structure that had reached structural strength

capacities.

Jul ‘06- Jan ‘08

Work as site structural engineer for Company’s EPIC contract of 5-nos. new wellhead jackets with

temporary drilling deck and two bridges for Al Shaheen Field Development Project 2005. Review

and give acceptance of jacket designs including risers and J-tubes, design report, construction

drawings and installation drawings/procedures submitted by the EPIC Contractor. My specific

responsibilities are to ensure the designs and constructions of the works are in compliance with

the scope of works; design codes and standards; and project specifications. Review site

procedures of construction methodologies and loadouts. In addition to my task is routine site visits

assessing the progress of the works to ensure safety and timely completion of the fabrication.

Resolve technical site queries and attend meetings.

Project Title: Al Shaheen Filed Development Project 2005, Phases 9 & 10 – Design, Fabrication

and Installation of Wellhead Jackets BD, CD, GA, HA & IA and Bridges BA-BD &

CA-CD; and Pipelines - Offshore Doha, Qatar

09 Dec ’04- 30 Jun ‘06 : SHELL MALAYSIA EXPLORATION & PRODUCTION

Sarawak Shell Berhad Miri Sarawak, Malaysia

Position : SR. STRUCTURAL ENGINEER

Work Description :

Project structural discipline engineer responsible to the overall design execution of the Phase II

scope of works starting from the basic design to detailed engineering (LRFD), up to follow-on

CV of ECG - page 3 of 7

fabrications of two wellhead/drilling platforms, F13E (SC)DR-A & SCDR-A platforms of E11 Hub

Project Phase II. Manage and control design consultant (subcontractor) to ensure delivery of

project milestones. Review and approve all design deliverables as per project CTR’s. Liaise with

design consultants’ Lead Structural Engineer about progress and technical aspect of the design to

ensure conformity to Company’s standards, e.g. SMEP, SES, DEP’s and also international design

standards. Attend meetings and design reviews. Report to project Team Leader.

Nominated by the project Team Leader to do the technical evaluation of bidders for fabrication

tenders of the two platforms each consist of jacket and topside. After the award of the fabrication

contracts, moved from design office to the fabrication yard to help setting-up of PMT at site.

Provide technical support to PMT and subcontractors, and reply engineering queries at site.

Review and approve fabrication drawings. Participate in weekly HSE walk-abouts.

Project Title: E11 Hub Project Phase II – F13E/SC 3&4 - 40km Offcoast Bintulu Sarawak

Malaysia

03 Nov ‘02 ~ 23 Nov ‘04 : WORLEY QATAR WLL

Doha, Qatar

Position : SR. STRUCTURAL ENGINEER/Lead Structural Engineer

Work Descriptions :

Lead designs of several wellhead platforms for Ras Gas offshore redesign feasibility studies aimed

to investigate and evaluate various scenarios that will optimize drilling of wells over a larger area.

These include several platforms such as 4 legged wellhead platform, minimum drilling platform,

host facilities platform and dual bay wellhead platform and combinations. Design activities include

platform configuration and design of primary members of jacket and topside and installation

studies including development of structural drawings and 3D modeling at PDS environments.

Carried-out re-FEED of Bul Hanine Arab C Project for Qatar Petroleum. The work includes design

optimization of PS-3K processing platform and PS-3J utility platform including modification of 4-

wellhead satellite platforms. His major contribution focused on enhancement of the structural

design and re-analysis of the structure including review of all aspects of installation studies for

topside, jackets and bridges. He designed flare and bridge support tripods.

He was mobilized to client offices and other Worley offices to work as seconded Senior Structural

Engineer. The following are among his task undertaken:

- Reviewed and updates of SACS model of newly installed structures for the purpose of

client’s feasibility and concept studies and re-certification of future expansion.

- Carried out FEED verification and endorsement of tender documents for several bid

proposals. Carry out verification analysis and review of major installation schemes.

- Finalized design reports and provided supports for final documentation of the ongoing

project.

- Designed of non-conventional deep water Jacket structure for the FEED of new field

upstream development at Sultanate of Oman.

List of projects involved:

• Ras Gas Offshore Platform Redesign Feasibility Study.

• Re-FEED of Bul Hanine Arab C Project for Qatar Petroleum.

• Dolphin Project Upstream and Compression Facilities for Dolphin Energy Limited.

• Salman Offshore Facilities EPC1 for Petroiran Development Company (PEDCO), Iran

• FEED - Tibat Field Development for Novus, Sultanate of Oman.

• Modification Works and Upgrading of Existing Structures for Maersk Oil Qatar, Doha Qatar

• SACS Analysis Review and Updates of New Structure Models of Block 5 Al Shaheen Field

Development Project 2001 - Packages 4, 5, 6, 7 & 8 for Maersk Oil Qatar.

CV of ECG - page 4 of 7

03 Nov ‘92 ~ 03 Nov ‘02 : NATIONAL PETROLEUM CONSTRUCTION COMPANY

Abu Dhabi - U.A.E

Position : LEAD STRUCTURAL ENGINEER

Work Descriptions :

Lead and control dedicated design team of engineers assigned to specific project in various major

EPIC contracts which most of the tasks are describe in the following paragraphs:

Prepare project specifications and design briefs, firm up structure configurations, and organize

design drawings. Provide MTO’s and material requisitions. Carry-out structural analyses such as

in-place analysis, fatigue, and earthquake including installation analysis. It also include

miscellaneous design calculations, like vortex shedding, wave slamming, cathodic protection

design, pile/foundation design, etc. as when required.

Check and review design reports, calculation notes and drawings to ensure sound and quality

engineering, compliance with the scope of work and standards. Initiate preliminary installation

feasibility studies of jackets and topsides to ensure construction aspects are considered during

detailed design.

Perform detail installation analyses of jacket and topsides structures, like loadout, lifting,

transportation, jacket floatation/up-ending, jacket launching, and pile driving. Develop installation

drawings for jacket, decks and all appurtenances hook-ups.

Carry out studies of float over deck installation by developing cargo barge deck layout and barge

approaches drawings. His experience also includes mating analysis during float over operation.

Hands-on experienced on stressed-skin design in one of the living quarter module AD-LQ for

Maersk Oil Qatar Al Shaheen Development Project Package2.

Supervise and control of issuance of drawings. Provide technical support and trouble shoot site

discrepancies during fabrication stage. Monitor weight control report preparation.

Attend meetings, coordinates and interfaces with other disciplines, clients/CA/MWS. Monitor work

progress and project schedule. He also mobilized to other engineering offices within local offices

and abroad as when and required.

List of projects undertaken:

Client/Project Title Project Descriptions Year

ADMA OPCO EPIC project, Further development of ABK and Umm Shaif

Field. Consists of 2-new integrated processing/utility topsides

Offshore Khuff Gas

(installation by float-over) and jackets substructures, Flare 2000 –‘ 02

Development Project

Towers, Bridges, and associated pipelines

Location : Abu Dhabi UAE & Iran.

OXY QATAR EPIC project, 2-wellhead platforms IS-RB06 and IS- V07

1999 - ‘00

Two Wellhead Platforms Location : Arabian Gulf Qatar

TOTAL EPIC project, 2 wellhead platforms WP1/WP2 equipped w/

production facilities and 2 relief platforms connected by

South Pars Field Development 1998 - ‘99

bridges.

Project (Phases 2 & 3)

Wellhead Platforms WP1/WP2 Location : Arabian Gulf Iran.

MAERSK OIL QATAR AS EPIC project, Detailed design of AB wellhead/process platform

(MOQ) and AD LQ/utility platform linked by a bridge. AB deck was

1997 - ‘98

installed by float over method.

Al Shaheen Field Development

Package -2 Location : Block 05 - Arabian Gulf Qatar

QATARGAS Fabrication and installation of WH3 Jacket. The jacket weighs

1000T in 53-m water depth

3rd LNG Train Upstream 1996

Facilities WH3 Wellhead Location : Arabian Gulf Qatar.

Platform Jacket

1995 - ’96

ELF PETROLEUM QATAR EPIC project, Basic and detailed engineering of DP1-wellhead

(EPQ) drilling platform; 2-satellite wellhead platforms WP1 & WP2,

associated subsea pipelines and cables.

Block 06 Al Khalij Field

CV of ECG - page 5 of 7

Developments. Location : Block 06 - Arabian Gulf Qatar

ADNOC Fabrication and construction of new loading and unloading

facilities for Ruwais Refinery Jetty intended for 300,000 DWT

Ruwais Refinery Berth-E 1994 - ‘95

tanker.

Expansion Project

Location : Ruwais Abu Dhabi, UAE

QATARGAS Fabrication, installation, and pre-com/commissioning of 6700

tons PU Process Platform. PU has integrated deck and

PU Topsides Upstream 1993 - ‘94

installed by float-over method.

Development Process Utility

Project, Location : Arabian Gulf Qatar.

ONGC Fabrication and Installation of 3-wellhead platforms jackets

S1-4, S1-5 & S1-6. 1994

S-1 Sand Free Gas

Development Project. Location : Bombay High India.

ADMA-OPCO Fabrication and Installation of 4-wellhead platforms, 1-eight

legged jacket and 6500 ton process platform; bridge & several

Umm Shaif Gas Development 1993 – 94

pipelines.

Project Packages 1, 2 & 3.

Location : Umm Shaif Field Abu Dhabi UAE.

ARAMCO Fabrication of 22-nos. typical wellhead decks and modular

type tower jackets. 1992 - ‘93

Universal Modular Platforms

Location : Arabian Gulf Saudi Arabia.

Aug ‘91 – Nov ’92 : ABB-LUMMUS ALIREZA LTD. CO.

Dammam, Saudi Arabia

Position : DESIGN CHECKER

Work Descriptions :

Designed and checked pipeline drawings for Northern Area Offshore Maintain Potential Platforms

and Flowlines Projects for Saudi ARAMCO to ensure all drawings conform to the design

calculation notes and project specifications.

Aug ‘89 – Feb ‘90 : NIPPON KOKAN CORPORATION/ NKI PTE. LTD., Yokohama,

Japan

Position : PROJECT ENGINEER

Work Descriptions :

Site Engineer in-charge for overall project monitoring and progress accomplishments of

subcontractors. Report to Subcontractor Manager. Carry-out work evaluation and quantity

surveying of sub-contractors monthly billing of work volumes completed in civil works, structural,

piping and equipments erection of the construction of Ethane Propane Recovery Project for ONGC

in Bombay, India.

Oct ‘88 – Aug ’89 : ATLANTIC GULF and PACIFIC CO. of MANILA INC., Makati,

Philippines

Position : STRUCTURAL DESIGN ENGINEER

Work Descriptions :

Perform structural designs calculation of various industrial and commercial buildings like high-rise

buildings, towers, and open structures for petro-chemical plants and pipe racks structures for

enquiry purposes. Prepare basic design drawings.

Prepare cost estimates of commercial buildings and industrial steel structures for quotation during

tendering stages.

CV of ECG - page 6 of 7

Apr ‘87 – Jul ‘88 : BRAUN TRANSWORLD CORPORATION

Shuiba, Kuwait

Position : FIELD ENGINEER

Work Descriptions :

Supervise and monitor field erection of pipe racks and equipment working platforms in Level-IV

Process Area for the construction of KNPC Refinery Modernization Project, Mina Abdullah;

Shuaiba, Kuwait.

May ’84 – Mar ’87 : ATLANTIC GULF & PACIFIC COMPANY of MLA., INC . BMFY-

Metals Fabrication Group, Bauan, Batangas, Philippines

Last Position : FABRICATION ENGINEER

Work Descriptions :

Develop templates/fabrication techniques and procedures for fabrication of box and built-up

girders, trusses and cylindrical forming for the fabrication of 29-story Pacific Star Building for

Republic of Nauru; Makati, Metro Manila.

Previous Position : FIELD ENGINEER

Work Descriptions :

Engineer In-charge of construction and erection of Utility Deck (UD) & Living Quarters (LQ) decks

sub-assemblies.

Report to Construction Superintendent for overall site daily activities, work progress and work

schedule of UNOCAL (Union Oil of California)- Baanpot Living Quarters & Central Process

Platforms Project for Baanpot Field Gulf of Thailand.

TRAINING COURSES/ AFFILIATION

• Training in Structural Analysis Design Software SACS (Structural Analysis Computer System)

developed by EDI. Conducted by EDI in NPCC Abu Dhabi, U.A.E., 1993.

• Training in Structural Analysis Design Software FASTRUDL, conducted by Bureau Veritas at

NPCC, Abu Dhabi, U.A.E., 1998

• NPCC In-house office training for enhancement of Microsoft Windows and Microsoft Office

Software, 1997

• Member, American Society of Civil Engineers, ASCE (ID No. 342417).

• Member, Philippines Institute of Civil Engineers, PICE.

REFERENCES : Will be provided upon request.