2000 to 2011: Georgia Power
Plant Bowen
Cartersville, GA
(Controls Specialist within I&C Dept.)
Responsibilities include: Serving as Control Specialist with duties ranging
from system(s) tuning/characterization, troubleshooting, design, migration
and startup of several systems into Foxboro DCS and Operation's primary
contact for control issues. Also, serving as Turbine and Boiler controls
SME (Subject Matter Expert) for departmental training.
Assigned and completed projects are listed below but not limited to:
. All auxiliary turbines' controls migration from Bailey/ETSI into
Foxboro DCS.
. Retrofit of high pressure EH fluid control for final drives of Unit #4
BFPTs.
. Unit #2 Hydrogen Seal Oil controls migration into Foxboro DCS.
. Smaller scale projects including various plant effluent controls
migrations into DCS.
Sept. 1995 to 1999: Inland Paperboard and Packaging, Inc.
Rome, GA
E&I Technician and Process Controls Specialist
Responsibilities included:
-Maintenance, troubleshooting, and retrofit design of primarily
Utility Dept. systems.
-Retrofit installations of Woodward 505 steam turbine control
systems.
-Training and supervising operations and maintenance staffs.
May 1988 - Sept. 1995 Delmarva Power
Wilmington, DE (Corporate Office)
June 1994 - Sept. 1995 Project Engineer - Mechanical Engineering Dept.
Responsibilities included:
-Served as Startup Engineer for Hay Road Combined Cycle Power Complex
-Planning/designing, budgeting, and supervising assigned capital
projects.
-Prepared or revised operating procedures for new control systems.
May 1988 to June 1994 Plant Electrical Engineer - Indian River Power
Station
Responsibilities included:
-Planning/designing, budgeting, and supervising assigned maintenance
and capital projects.
-Training and supervising operations and maintenance staffs.
Selected completed projects included:
-Installation and startup of Bailey Network "90" and Infi-Net DCS and
of Bailey OIS (Operator Interface Systems) These systems migrations
included, but not limited to, turbine, BMS, boiler, and associated
BOP.
-Installation and startup of pH Control System to control pH of
boiler waste water effluent into river.
-Prepared or revised operating procedures for new control systems.
August 1979 - May 1988 Westinghouse Electric Corporation
Power Generation Service Division
Atlanta, GA
June 1986 - May 1988 Electrical Field Engineer
Classifications included:
-EH/Turbine Controls Specialist
-Excitation Systems Specialist
-Generator Specialist
Responsibilities included:
-Serving as Project/Test Engineer at power generating stations and
paper mills during the installation/startup, repair, testing, and
troubleshooting of various types of turbine control systems, voltage
regulators, exciters and large generators. Testing and verification of
associated front-line, protective relaying.
May 1984 - June 1986 Southeast Region Instrument Lab Supervisor
August 1979 - July 1984 Southeast Region Instrument Lab Technician
EDUCATION:
Southern Institute of Technology, Marietta, GA
Associates Degree Electrical Engineering Technology - June 1986
Marietta-Cobb Technical Institute
(now Chattahoochee Technical Institute), Marietta, GA
Two-year diploma Electronic Technology
ALSO:
Various vendor training seminars including Foxboro DCS courses,
Bailey DCS courses; Honeywell DCS; Allen-Bradley PLC courses and an Allen-
Bradley Variable Speed Drive course; Westinghouse EH, Excitation Systems
and Generators courses and ORACLE DBM tools courses.