Michael S. Magsino
Cel. No.: 090********
Email: *******.*******@*****.***/***************@*****.***
Piping Designer/Deputy Area Lead
EDUCATION
B.S. Mechanical Engineering, Colegio de San Juan de Letran Calamba Laguna
Professional Licenses/Certifications
LICENSED MECHANICAL ENGINEER, OCT. 2004 PRC LICENSE NO.0063970
Summary of experience
BEEN IN THE FIELD OF PIPING ENGINEERING FOR ALMOST 5 YEARS WITH
CONTINUOUS EXPERIENCE INVOLVING UNDERSTANDING OF P&ID LAY-OUTS, ANALYZING
PLOT PLANS AND PROJECT SCOPE BY MAKING A DESIGN USING PDS MODELING TOOL
ACCOMPANIED BY QUALITY TRACKING SOFTWARE SUCH AS IDP/RDB REVIEWS AND SMART
PLANT SYSTEM. APPLICABLE CODES, CLIENT AND COMPANY'S STANDARDS AND OTHER
FACTORS THAT MAKES THE DESIGN ACCURATE AND SAFE ARE ALSO BEING PRACTICED.
Furthermore, to be suited with any positions that I may apply with, I
have some experience with Building operations. Three years of building
management (as building engineer) in which, placement of system for
maintenance and operations, procurement and monitoring of all supplies in
the building etc.
SPECIFIC EXPERIENCE
FLUOR DANIEL INC. PHILIPPINES
Piping Designer
July 16, 2007 to present
Projects Involved
VALE Project Inco (Mining and Metals Project)
Vancouver Canada
Currently working as a Deputy Area Lead at the same time as a Designer for
Neutralization process section, handling 6 members to issue almost 2000
isometrics. The following responsibilities/activities should be executed
properly and accurately;
. Supervise Isometric generation for 19 models (6 modules and 13
stickbuilt)
. Ensures quality of isometrics before issuance to counterpart
. Monitors and closed all the model review tags and strictly followed
what the client requirements.
. Consistently monitoring design changes and reviewing its validity and
accuracy
. Properly handle all the rework isometrics and reviews it if the
comment is valid or not
. Manages all the issued isometrics by religiously updating the piping
utilities (isometric monitoring sheet-PLSR)
. Interact with counterpart with regard to other requirement needed by
the project
Saudi Kayan Petrochemical
Houston Scope, USA
Our main objective as a designer is to produce quality isometrics that
considers accurate bill of materials which is economical and conforming to
safety and welfare of the personnel who will accomplish the build-up of the
plant and its future operation. To be able to have these goals achieved,
the following responsibilities are put into practice:
. Implement proper and accurate Pipe routings for a certain feed
water/process area scope.
. Accomplishment of the all the piping design concerns and inculcating
updated standards during the formulation of the Isometrics.
. Providing accurate and standard based information on the Isometrics
being produced.
. Greatly considers the impact of stress analysis on a certain system in
the pipe lines.
. Considering all the possible clashes/monitor comments/client requests
and implementing it on the model sufficing company and client
standards
. Performs specific routine such as checking of PLSR, RDB reports and
IDP clashing reviews.
. Regular updating of P and ID (Master versus working P and ID)
. Performs inter-discipline discussions to solve certain issues that
require attention from the specific discipline.
. Proper usage of the software such as PDS, SmartPlant, Microstation,
InterGraph etc.
. Act upon on those rework Isometrics before it will be sent to the
fabricators
. Verifies all the necessary squad check if it conforms with the agreed
design and lay-out of each discipline.
In this project, I have worked primarily on the fire water supply of the
plant, specifically focusing on the pipe rack that lies on the sleeper way
area, producing approximately 170 Isometrics in two months time.
BP Operation Canadian Crude
Houston Scope, USA
Another big project of Fluor which able to produce approximately 5,000
Isometrics (GOHT area alone).It consists of other areas such as 12PS and
OSBL, which, the detailed engineering from the Philippines is expected for.
My assignment is in the process area of GOHT scope handling process fluids
from the stripper towers.
I handled different equipment like three exchangers, two stripper reflux
pumps and horizontal tanks that making the process fluids be sent in the
pipe rack in good condition. Doing the same duties stipulated in my initial
project with Fluor, I am able to produce good quality isometrics ahead of
what the schedule is.
CB RICHARD ELLIS - Philippines
Property Engineer/Project Coordinator
June 2006 to July 2007
Projects Involved
Property Engineer
(Under CBRE Management)
Regent Parkway Condominium
21st Drive, Fort Bonifacio, Taguig Metro Manila
November 2006 up to July 2007
. Supervise all the activities of the administration Staff such as
Maintenance, Security and Housekeepers
. Created and Manages the Preventive Maintenance activities on the
building especially the equipment (pumps, GENSET, Fans, Elevator,
etc.)
. Monitors and supervise the safety measures in the building that
includes the fire and earthquake safety measures. Also assigned as the
Assistant Fire Brigade Marshal
. Conduct technical analysis of the contractor's quotation especially
for the big projects in the building
. Recommends proper technical solution to a certain matter that needs
technical and permanent solution
. Prepares cost-estimate analysis for certain projects in the building
. Implementation of improvements in the building (provide the Garbage
Segregation, ENERCON, BMS (Building Management System),Operable Window
improvement, Inventory system and Service Call system
. Always meet customer's technical complain and provide adequate
technical solution for the matter
. Prepares schedule and plans for a certain repair/project
. Performs the tasks of the Property Manager just in case, PM is not
around.
. Prepares the equipment schedule taking in consideration the
savings of the electricity.
. Headed the provision of PM contractors for all the major equipment in
the building.
Project Coordinator (under CBRE Management)
GENPACT PHILIPPINES
Filinvest City, Alabang
June 2006 to November 2006
. Liase with PEZA authorities for approvals and clearances
. Liase with the nominated Customs Agency for all clearances,
authorization, material and receipts
. Helps in setting up the site by coordinating with other team
members
. Leads the receiving and issuance of the materials as well as the
storage
. Created system for the warehouse of the Client
. Provides sites operation support
. Assists the Technical Management Group in various account
. Provides other administrative and logistics support to
client's/site's employees
Ayala Property Management Corporation (AsiaPRO)
Technical Assistant
Tordesillas Street, Makati City
November 2005 to June 2006
. Supervise all the activities of the administration Staff such as
Maintenance, Security and Housekeepers
. Manages the Preventive Maintenance activities on the building
especially the equipment (pumps, GENSET, Fans, Elevator, etc.)
. Monitors and supervise the safety measures in the building that
includes the fire and earthquake safety measures. Also assigned as the
Assistant Fire Brigade Marshal
. Conduct technical analysis of the contractor's quotation especially
for the big projects in the building.
. Recommends proper technical solution to a certain matter that needs
technical and permanent solution
. Prepares cost-estimate analysis for certain projects in the building
. Implementation of improvements in the building (provide the fire
safety evacuation plan, Restoration of stockroom, Restoration of Doors
and Exhaust fan cover, etc)
. Always meet customer's technical complain and provide adequate
technical solution for the matter
. Prepares schedule and plans for a certain repair/project
. Performs the tasks of the Building Administrator just in case, BA is
not around
Samsung Electronics Philippines Manufacturing Incorporated
Mecha Engineer
Engineering Group
January 2005 to November 2005
. Failure Analysis of the defects incurred by the product
. Implementation of Pre-MP conducted for new parts of the product
. Weekly Defect monitoring in Main line and Deck line
. Headed the projects such as Barcode System for Slim Models, OBA Slim
Detection Improvement and Data Accuracy Audit
. Conducts weekly Audit for the vendors
. Assists in the product verification of new models for Slim Combo
. Reviews and modifies process in the Deck line and suggest possible
improvements
. Monitoring the quality of the parts before use in the Production
. Provides and requires corrective actions for the defects of the
product
Skills
. Plant Design System (PDS) Advanced
. Smart Plant Review (SPR) Advanced
. Microstation Advanced
. Autocad Basic
. Microsoft Office (MS Word, Excel, Powerpoint) Advanced
. AutoPipe (For Stress Engineer) Basic
Training
. Advance Stress Training (Fluor Daniel Inc. Philippines)
. Plant Arrangement - Flow Diagram Transposition (Fluor Daniel
Philippines)
. Heat Tracing Transposition (Fluor Daniel Philippines)
. Phase 1 Design Training (Fluor Daniel Inc. Philippines)
. Phase 2 Design Training (Fluor Daniel Inc. Philippines)
. PDS Piping Modeling (Fluor Daniel Inc. Philippines)
. PDS Equipment Modeling (Fluor Daniel Inc. Philippines)
. Microstation Training Course (Fluor Daniel Inc. Philippines)
. Fluor Global Communicators (regular guest and handles different roles
during meetings)
ACHIEVEMENT
SPOTLIGHT AWARD (FEB 2007 FLUOR DANIEL INC) - FOR BEING SO PROACTIVE THAT
CAN ADJUST TO A ANY GIVEN TASK THAT THE MANAGEMENT GIVES.
Professional Affiliations
MEMBER - PHILIPPINE SOCIETY OF MECHANICAL ENGINEERS
Personal particulars
DATE OF BIRTH: FEBRUARY 13, 1983
Place of Birth: Sto. Tomas Batangas
Civil Status: Single
Religion: Roman Catholic
Nationality: Filipino
Height: 5' 5 "
Weight: 185 lbs
Father: Pastor L. Magsino Sr.
Mother: Juana S. Magsino